WAR-SR 123-29.22
WAR County · est $0.1M
Bid dateThursday, July 26—
WAR County · est $0.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount.
| Item | Quantity | R1Eclipse CO LLC | R2Belgray, INC | R3Rack & Ballauer Excavating CO INC | % of bid |
|---|---|---|---|---|---|
| 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH GEOTEXTILE FA | 603 CY | $69.00 | $125 | $125 | 21% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,402 | $25,000 | $15,000 | 18% |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 234 CY | $136 | $110 | $154 | 16% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 28 CF | $728 | $520 | $520 | 10% |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 694 SY | $15.00 | $35.00 | $35.00 | 5% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,500 | $2,176 | $2,000 | 5% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $9,500 |
| $2,000 |
| $2,500 |
| 5% |
| 624E10000 MOBILIZATION | 1 LS | $8,529 | $10,000 | $23,000 | 4% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $6,522 | $20,350 | $10,000 | 3% |
| 606E13000 GUARDRAIL, TYPE 5 | 150 FT | $36.50 | $35.00 | $33.65 | 3% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $5,396 | $11,500 | $10,250 | 3% |
| 646E10000 EDGE LINE, 4" | 0.07 MILE | $64,942 | $61,820 | $61,820 | 2% |
| 659E10000 SEEDING AND MULCHING | 688 SY | $4.00 | $4.00 | $3.75 | 1% |
| 832E30000 EROSION CONTROL | 2,500 EACH | $1.00 | $1.00 | $1.00 | 1% |
| 646E10200 CENTER LINE | 0.03 MILE | $66,628 | $63,425 | $63,425 | 1% |
| 659E20000 COMMERCIAL FERTILIZER | 0.09 TON | $7,185 | $550 | $750 | 0% |
| 202E38000 GUARDRAIL REMOVED | 150 FT | $2.50 | $25.00 | $20.75 | 0% |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 10 FT | $27.50 | $40.00 | $40.00 | 0% |
| 659E35000 WATER | 1.9 MGAL | $73.00 | $85.00 | $1.00 | 0% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 5 FT | $13.50 | $70.00 | $10.00 | 0% |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH GEOTEXTILE FA | 603 CY | $69 | $42k | 21% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,402 | $35k | 18% |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 234 CY | $135.5 | $32k | 16% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 28 CF | $728 | $20k | 10% |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 694 SY | $15 | $10k | 5% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,500 | $10k | 5% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $9,500 | $10k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $8,529 | $9k | 4% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $6,522 | $7k | 3% |
| 606E13000 GUARDRAIL, TYPE 5 | 150 FT | $36.5 | $5k | 3% |