HAM-IR 71-09.92/10.75
HAM County · est $1.2M
Bid dateThursday, August 13—
HAM County · est $1.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 60 more items below.
| Item | Quantity | R1Axis Civil Construction LLC | R2Eclipse CO LLC | % of bid |
|---|---|---|---|---|
| 838E20701 GABIONS, AS PER PLAN | 2,502 CY | $172 | $175 | 32% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $95,000 | $85,339 | 7% |
| 659E00300 TOPSOIL | 2,489 CY | $38.00 | $45.50 | 7% |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 827 CY | $90.00 | $82.75 | 6% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1,819 CY | $40.00 | $43.48 | 5% |
| 659E10000 SEEDING AND MULCHING | 22,419 SY | $2.50 | $0.75 | 4% |
| 503E21100 UNCLASSIFIED EXCAVATION | 2,159 CY | $25.00 | $22.50 | 4% |
| 203E35141 GRANULAR MATERIAL, TYPE E, AS PER PLAN | 410 CY | $125 | $75.00 | 4% |
| 832E30000 EROSION CONTROL | 50,000 EACH | $1.00 | $1.00 | 4% |
| 203E10000 EXCAVATION | 2,152 CY | $22.00 | $29.50 | 4% |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 447 CY | $90.00 | $83.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $35,000 | $77,401 | 3% |
| 607E23000 FENCE, TYPE CLT | 1,521 FT | $23.00 | $27.00 | 3% |
| 611E97400 CONDUIT, MISC.:3 SIDED CULVERT, 5' SPAN X 4' RISE | 21 FT | $1,550 | $1,455 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $30,000 | $92,400 | 2% |
| 611E98231 CATCH BASIN, NO. 4, AS PER PLAN | 3 EACH | $9,200 | $15,623 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,786 FT | $15.00 | $15.75 | 2% |
| 611E04400 12" CONDUIT, TYPE B | 142 FT | $180 | $76.75 | 2% |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $25,500 | $13,388 | 2% |
| 611E19600 42" CONDUIT, TYPE C, 706.02 | 56 FT | $380 | $354 | 2% |
| Item | Quantity | R1Axis Civil Construction LLC | R2Eclipse CO LLC |
|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 1 EACH | $500 | $466 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 101 SY | $12.00 | $15.25 |
| 202E30700 CONCRETE BARRIER REMOVED | 30 FT | $30.00 | $84.75 |
| 202E32000 CURB REMOVED | 128 FT | $7.00 | $6.75 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 43 FT | $40.00 | $21.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 68 FT | $60.00 | $25.00 |
| 202E38000 GUARDRAIL REMOVED | 25 FT | $5.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $12.75 |
| 202E58000 MANHOLE REMOVED | 3 EACH | $900 | $387 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $900 | $387 |
| 202E75000 FENCE REMOVED | 941 FT | $2.00 | $4.25 |
| 203E20001 EMBANKMENT, AS PER PLAN | 537 CY | $22.00 | $19.75 |
| 606E16000 GUARDRAIL REBUILT | 25 FT | $118 | $138 |
| 607E70000 FENCELINE SEEDING AND MULCHING | 1,521 FT | $0.85 | $3.25 |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 30 FT | $185 | $262 |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN | 72 FT | $55.00 | $161 |
| 659E14000 REPAIR SEEDING AND MULCHING | 1,122 SY | $0.40 | $0.50 |
| 659E15000 INTER-SEEDING | 1,122 SY | $0.10 | $0.01 |
| 659E20000 COMMERCIAL FERTILIZER | 3.13 TON | $550 | $525 |
| 659E31000 LIME | 4.63 ACRE | $52.00 | $52.50 |
| 659E35000 WATER | 124 MGAL | $5.00 | $1.00 |
| 670E00700 DITCH EROSION PROTECTION | 365 SY | $3.00 | $2.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $5,000 | $2,625 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $16,000 | $6,431 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $6,000 | $13,125 |
| 602E20000 CONCRETE MASONRY | 0.33 CY | $2,500 | $1,361 |
| 611E07600 18" CONDUIT, TYPE C | 7 FT | $95.00 | $182 |
| 611E08201 18" CONDUIT, TYPE F, AS PER PLAN, 707.05 TYPE C OR | 98 FT | $160 | $118 |
| 611E10600 24" CONDUIT, TYPE C | 7 FT | $100 | $193 |
| 611E13600 30" CONDUIT, TYPE C | 25 FT | $125 | $134 |
| 611E19400 42" CONDUIT, TYPE B, 706.02 | 8 FT | $380 | $472 |
| 611E98151 CATCH BASIN, NO. 3, AS PER PLAN | 2 EACH | $4,200 | $3,395 |
| 611E98230 CATCH BASIN, NO. 4 | 1 EACH | $9,200 | $13,047 |
| 611E98645 CATCH BASIN GRATE, AS PER PLAN | 1 EACH | $1,850 | $6,989 |
| 611E99574 MANHOLE, NO. 3 WITH 72" BASE I.D. | 1 EACH | $6,000 | $9,722 |
| 611E99574 MANHOLE, NO. 3 WITH 84" BASE I.D. | 1 EACH | $12,500 | $13,244 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 19 CY | $200 | $317 |
| 304E20000 AGGREGATE BASE | 17 CY | $85.00 | $94.00 |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 3 CY | $350 | $688 |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (4 CY | $350 | $553 |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1 CY | $500 | $1,032 |
| 609E16000 CURB, TYPE 2-B | 11 FT | $50.00 | $60.75 |
| 609E22000 CURB, TYPE 3-B | 105 FT | $50.00 | $54.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 50 FT | $17.80 | $11.50 |
| 630E80100 SIGN, FLAT SHEET | 12 SF | $25.00 | $26.25 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $10.00 | $15.75 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $15.00 | $21.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $80.00 | $68.25 |
| 614E11630 INCREASED BARRIER DELINEATION | 35 FT | $5.00 | $2.75 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 2 EACH | $1,100 | $1,995 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE-WAY | 37 EACH | $12.00 | $10.50 |
| 614E13350 OBJECT MARKER, ONE WAY | 37 EACH | $10.00 | $13.75 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $900 | $945 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.62 MILE | $6,275 | $6,589 |
| 616E10000 WATER | 8 MGAL | $10.00 | $34.75 |
| 204E50000 GEOTEXTILE FABRIC | 1,230 SY | $0.90 | $3.75 |
| 671E14000 EROSION CONTROL MAT | 2,165 SY | $3.00 | $3.75 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $17,502 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $7,500 | $8,400 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,000 | $46,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $20,000 | $23,390 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 838E20701 GABIONS, AS PER PLAN | 2,502 CY | $172 | $430k | 28% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $95,000 | $95k | 6% |
| 659E00300 TOPSOIL | 2,489 CY | $38 | $95k | 6% |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 827 CY | $90 | $74k | 5% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1,819 CY | $40 | $73k | 5% |
| 659E10000 SEEDING AND MULCHING | 22,419 SY | $2.5 | $56k | 4% |
| 503E21100 UNCLASSIFIED EXCAVATION | 2,159 CY | $25 | $54k | 3% |
| 203E35141 GRANULAR MATERIAL, TYPE E, AS PER PLAN | 410 CY | $125 | $51k | 3% |
| 832E30000 EROSION CONTROL | 50,000 EACH | $1 | $50k | 3% |
| 203E10000 EXCAVATION | 2,152 CY | $22 | $47k | 3% |