SUM-IR 77-31.97
SUM County · est $0.3M
Bid dateThursday, April 1—
SUM County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 10 more items below.
| Item | Quantity | R1Mark Haynes Construction INC | R2Shelly & Sands INC | R3Valley Electrical Consolidated INC | R4Karvo Companies INC | R5Eclipse CO LLC | R6Stanley Miller Construction Company | R7Lockhart Concrete CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 601E32010 ROCK CHANNEL PROTECTION, TYPE A WITH AGGREGATE FIL | 1,654 CY | $95.00 | $140 | $130 | $127 | $171 | $140 | $359 | 50% |
| 203E20000 EMBANKMENT | 899 CY | $25.00 | $23.00 | $7.00 | $25.00 | $7.00 | $73.00 | $2.00 | 7% |
| 203E10000 |
| Item | Quantity | R1Mark Haynes Construction INC | R2Shelly & Sands INC | R3Valley Electrical Consolidated INC | R4Karvo Companies INC | R5Eclipse CO LLC | R6Stanley Miller Construction Company | R7Lockhart Concrete CO |
|---|---|---|---|---|---|---|---|---|
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 2 SY | $125 | $180 | $400 | $575 | $312 | $1,917 | $275 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $50.00 | $105 | $230 | $25.00 | $158 | $100 | $500 |
| 659E35000 WATER |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 687 CY |
| $25.00 |
| $14.00 |
| $25.00 |
| $8.00 |
| $9.00 |
| $80.00 |
| $25.00 |
| 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $16,500 | $25,000 | $19,250 | $49,250 | $63,000 | $9,834 | $49,000 | 5% |
| 832E30000 EROSION CONTROL | 15,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $14,500 | $10,000 | $56,000 | $55,000 | $30,867 | $28,700 | $39,000 | 5% |
| 659E00300 TOPSOIL | 278 CY | $45.00 | $36.00 | $74.00 | $29.00 | $57.00 | $100 | $30.00 | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 150 FT | $65.00 | $50.00 | $93.00 | $45.00 | $31.50 | $55.00 | $50.00 | 3% |
| 671E15040 EROSION CONTROL MAT, TYPE E | 2,500 SY | $3.00 | $3.00 | $3.00 | $2.64 | $2.50 | $2.60 | $5.00 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,500 | $52,000 | $6,000 | $20,000 | $28,342 | $3,167 | $45,000 | 2% |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $5,300 | $8,000 | $2,800 | $10,000 | $7,928 | $1,500 | $1,500 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $2,600 | $4,400 | $8,000 | $12,500 | $6,225 | $19,000 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $800 | $2,740 | $2,900 | $2,500 | $500 | $1,667 | $750 | 2% |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $3,500 | $3,400 | $3,800 | $3,200 | $3,066 | $3,556 | $2,400 | 1% |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 1 EACH | $2,800 | $2,900 | $8,000 | $2,550 | $2,883 | $3,000 | $2,500 | 1% |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,700 | $1,600 | $2,300 | $2,000 | $1,470 | $1,556 | $1,525 | 1% |
| 606E26000 ANCHOR ASSEMBLY, TYPE B | 1 EACH | $2,500 | $2,200 | $7,000 | $2,225 | $2,247 | $3,000 | $2,000 | 1% |
| 606E98000 GUARDRAIL, MISC.: GUARDRAIL REMOVAL AND REINSTALLA | 150 FT | $15.00 | $30.00 | $40.00 | $13.40 | $31.00 | $14.80 | $50.00 | 1% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 5 CY | $450 | $290 | $950 | $300 | $211 | $547 | $400 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,200 | $10,000 | $14,000 | $4,200 | $12,500 | $28,933 | $9,000 | 1% |
| 14 MGAL |
| $25.00 |
| $1.00 |
| $22.00 |
| $1.00 |
| $19.00 |
| $1.00 |
| $50.00 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $1,500 | $4,300 | $3,500 | $5,000 | $1,890 | $3,000 | $2,040 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 20 FT | $12.00 | $18.00 | $45.00 | $25.00 | $11.50 | $34.00 | $50.00 |
| 611E01500 6" CONDUIT, TYPE F | 10 FT | $12.00 | $36.00 | $86.00 | $50.00 | $12.50 | $34.00 | $50.00 |
| 611E02600 8" CONDUIT, TYPE F | 10 FT | $15.00 | $40.00 | $88.00 | $55.00 | $14.50 | $37.00 | $100 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $225 | $315 | $750 | $800 | $239 | $617 | $400 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE WAY) | 9 EACH | $25.00 | $8.00 | $3.00 | $20.00 | $10.50 | $22.22 | $20.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 3 EACH | $30.00 | $22.00 | $10.00 | $25.00 | $10.50 | $27.78 | $25.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 601E32010 ROCK CHANNEL PROTECTION, TYPE A WITH AGGREGATE FIL | 1,654 CY | $95 | $157k | 50% |
| 203E20000 EMBANKMENT | 899 CY | $25 | $22k | 7% |
| 203E10000 EXCAVATION | 687 CY | $25 | $17k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $16,500 | $17k | 5% |
| 832E30000 EROSION CONTROL | 15,000 EACH | $1 | $15k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $14,500 | $15k | 5% |
| 659E00300 TOPSOIL | 278 CY | $45 | $13k | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 150 FT | $65 | $10k | 3% |
| 671E15040 EROSION CONTROL MAT, TYPE E | 2,500 SY | $3 | $8k | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,500 | $7k | 2% |