PUT-SR 109-02.63
PUT County · est $0.3M
Bid dateThursday, July 1—
PUT County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 3 more items below.
| Item | Quantity | R1Miller Contracting Group INC | R2Geddis Paving & Excavating INC | R3Eclipse CO LLC | R4All Purpose Contracting INC | R5Vernon Nagel INC | % of bid |
|---|---|---|---|---|---|---|---|
| 611E07600 18" CONDUIT, TYPE C | 2,440 FT | $42.00 | $58.00 | $52.00 | $55.00 | $56.00 | 46% |
| 611E04600 12" CONDUIT, TYPE C | 671 FT | $34.00 | $44.00 | $44.50 | $40.00 | $62.00 | 10% |
| 624E10000 MOBILIZATION | 1 LS | $21,600 | $10,000 | $10,000 | $15,000 | $10,000 | 10% |
| 832E30000 |
| Item | Quantity | R1Miller Contracting Group INC | R2Geddis Paving & Excavating INC | R3Eclipse CO LLC | R4All Purpose Contracting INC | R5Vernon Nagel INC |
|---|---|---|---|---|---|---|
| 654E11000 COMMERCIAL FERTILIZER | 0.3 TON | $500 | $599 | $335 | $1,000 | $600 |
| 659E35000 WATER | 12.1 MGAL | $1.00 | $1.00 | $1.00 | $10.00 | $1.00 |
| 616E10000 WATER | 4 MGAL | $10.00 | $1.00 | $18.00 | $10.00 | $10.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 20,000 EACH |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $11,500 | $10,000 | $21,806 | $23,000 | $20,000 | 5% |
| 611E06100 15" CONDUIT, TYPE C | 257 FT | $39.00 | $52.00 | $56.00 | $50.00 | $70.00 | 5% |
| 611E98470 CATCH BASIN, NO. 2-2B | 10 EACH | $960 | $1,500 | $1,750 | $1,400 | $1,750 | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $2,125 | $5,500 | $3,750 | $5,000 | 2% |
| 659E10000 SEEDING AND MULCHING | 2,245 SY | $1.75 | $1.15 | $1.50 | $2.00 | $5.50 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,800 | $2,500 | $9,500 | $5,000 | $2,500 | 2% |
| 203E10000 EXCAVATION | 200 CY | $17.00 | $50.00 | $25.00 | $25.00 | $25.00 | 2% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 505 FT | $5.25 | $8.00 | $9.00 | $10.00 | $8.00 | 1% |
| 690E50000 SPECIAL - MAILBOX SUPPORT | 6 EACH | $295 | $349 | $200 | $250 | $275 | 1% |
| 611E01200 6" CONDUIT, TYPE D | 28 FT | $35.00 | $29.00 | $17.00 | $25.00 | $60.00 | 0% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 1 CY | $900 | $1,750 | $850 | $1,500 | $1,800 | 0% |
| 611E01800 8" CONDUIT, TYPE B | 10 FT | $67.00 | $39.00 | $16.00 | $25.00 | $25.00 | 0% |
| 611E01500 6" CONDUIT, TYPE F | 10 FT | $49.00 | $29.00 | $11.00 | $20.00 | $20.00 | 0% |
| 611E01100 6" CONDUIT, TYPE C | 4 FT | $100 | $29.00 | $44.50 | $30.00 | $75.00 | 0% |
| 304E20000 AGGREGATE BASE | 3 CY | $68.00 | $145 | $105 | $55.00 | $75.00 | 0% |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $180 | $125 | $350 | $275 | $225 | 0% |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E07600 18" CONDUIT, TYPE C | 2,440 FT | $42 | $102k | 46% |
| 611E04600 12" CONDUIT, TYPE C | 671 FT | $34 | $23k | 10% |
| 624E10000 MOBILIZATION | 1 LS | $21,600 | $22k | 10% |
| 832E30000 EROSION CONTROL | 20,000 EACH | $1 | $20k | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $11,500 | $12k | 5% |
| 611E06100 15" CONDUIT, TYPE C | 257 FT | $39 | $10k | 5% |
| 611E98470 CATCH BASIN, NO. 2-2B | 10 EACH | $960 | $10k | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $5k | 2% |
| 659E10000 SEEDING AND MULCHING | 2,245 SY | $1.75 | $4k | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,800 | $4k | 2% |