MAH-McGaffney St Extension Ph 2
MAH County · est $0.4M
Bid dateThursday, May 12—
MAH County · est $0.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 21 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2A P O'horo Company | R3Mike Pusateri Excavating INC | R4Rudzik Excavating INC | R5Marucci & Gaffney Excavating CO | R6Eclipse CO LLC | R7S E T INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 365 CY | $158 | $190 | $181 | $180 | $158 | $167 | $179 | 18% |
| 611E04400 12" CONDUIT, TYPE B | 646 FT | $72.00 | $70.00 | $59.75 | $71.00 | $85.00 | $73.00 | $71.89 | 15% |
| 609E12000 |
| Item | Quantity | R1Shelly & Sands INC | R2A P O'horo Company | R3Mike Pusateri Excavating INC | R4Rudzik Excavating INC | R5Marucci & Gaffney Excavating CO | R6Eclipse CO LLC | R7S E T INC |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,800 | $5,000 | $10,200 | $6,870 | $30,000 | $5,000 | $14,000 |
| 201E26500 STUMP REMOVED, 18" | 11 EACH | $112 | $150 | $248 | $350 | $550 | $234 | $385 |
| 204E13000 EXCAVATION OF SUBGRADE | 100 CY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1,378 FT |
| $23.00 |
| $22.50 |
| $26.95 |
| $30.00 |
| $28.00 |
| $24.50 |
| $32.68 |
| 10% |
| 304E20000 AGGREGATE BASE | 422 CY | $57.00 | $65.00 | $76.00 | $60.00 | $69.00 | $61.00 | $61.20 | 8% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (106 CY | $185 | $190 | $211 | $236 | $185 | $195 | $235 | 6% |
| 203E10000 EXCAVATION | 1,408 CY | $13.00 | $18.00 | $17.90 | $26.90 | $20.00 | $21.00 | $15.00 | 6% |
| 605E05100 4" SHALLOW PIPE UNDERDRAINS | 1,344 FT | $13.00 | $9.00 | $11.60 | $28.00 | $11.00 | $15.00 | $15.17 | 6% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 77 CY | $223 | $270 | $220 | $275 | $223 | $235 | $275 | 5% |
| 611E98180 CATCH BASIN, NO. 3A | 4 EACH | $3,150 | $3,000 | $2,220 | $3,000 | $2,975 | $4,029 | $2,463 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10,000 | $10,125 | $8,400 | $10,000 | $19,910 | $35,995 | 3% |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $2,400 | $500 | $2,000 | $1,000 | $500 | $683 | $515 | 3% |
| 204E10000 SUBGRADE COMPACTION | 2,686 SY | $3.00 | $1.00 | $2.25 | $2.00 | $2.00 | $1.00 | $1.50 | 3% |
| 202E98000 REMOVAL MISC.:FREE STANDING WALL | 1 LS | $7,400 | $40,000 | $22,900 | $5,775 | $12,500 | $42,301 | $20,050 | 2% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 100 CY | $64.00 | $50.00 | $60.00 | $58.00 | $60.00 | $59.00 | $57.00 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,200 | $12,000 | $5,440 | $2,000 | $5,000 | $7,000 | $12,089 | 2% |
| 203E20000 EMBANKMENT | 117 CY | $51.00 | $24.00 | $8.00 | $35.00 | $10.00 | $9.00 | $62.94 | 2% |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 3 EACH | $1,900 | $900 | $1,200 | $1,000 | $900 | $2,113 | $947 | 2% |
| 659E00300 TOPSOIL | 193 CY | $23.00 | $30.00 | $60.00 | $32.00 | $35.00 | $63.00 | $67.25 | 1% |
| 832E30000 EROSION CONTROL | 3,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 1,736 SY | $2.00 | $2.50 | $4.35 | $2.75 | $2.00 | $4.00 | $4.35 | 1% |
| $15.00 |
| $9.00 |
| $30.00 |
| $30.00 |
| $10.00 |
| $20.00 |
| $20.00 |
| 204E45000 PROOF ROLLING | 4 HOUR | $216 | $300 | $175 | $200 | $90.00 | $262 | $300 |
| 204E50000 GEOTEXTILE FABRIC | 200 SY | $1.00 | $2.50 | $2.85 | $7.50 | $3.00 | $2.00 | $2.79 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1-1/4" | 13 SY | $90.00 | $50.00 | $40.00 | $44.00 | $90.00 | $98.00 | $44.00 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION | 1 LS | $2,300 | $2,000 | $900 | $750 | $900 | $1,680 | $3,000 |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $1,800 | $250 | $2,040 | $620 | $700 | $309 | $2,044 |
| 659E35000 WATER | 2 MGAL | $1.00 | $1.00 | $5.00 | $0.10 | $1.00 | $1.00 | $1.10 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,450 | $400 | $1,585 | $1,515 | $1,500 | $2,266 | $2,013 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $2,900 | $750 | $3,060 | $3,060 | $2,900 | $4,944 | $880 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $1,400 | $600 | $4,500 | $1,485 | $7,800 | $1,363 | $1,735 |
| 611E00400 4" CONDUIT, TYPE E FOR DRAINAGE CONNECTION | 100 FT | $16.00 | $8.00 | $36.50 | $8.00 | $11.00 | $16.00 | $14.73 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 30 FT | $63.00 | $8.00 | $30.00 | $33.00 | $11.00 | $19.00 | $15.75 |
| 611E01400 6" CONDUIT, TYPE E FOR DRAINAGE CONNECTION | 75 FT | $20.00 | $10.00 | $25.00 | $11.00 | $6.00 | $15.00 | $16.49 |
| 611E02500 8" CONDUIT, TYPE E FOR DRAINAGE CONNECTION | 50 FT | $28.00 | $10.00 | $33.00 | $14.00 | $8.00 | $22.00 | $23.12 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 24 FT | $10.00 | $5.00 | $5.00 | $30.00 | $5.00 | $5.00 | $4.00 |
| 407E20000 NON-TRACKING TACK COAT | 241 GAL | $3.00 | $2.50 | $5.50 | $4.25 | $3.00 | $3.16 | $4.13 |
| 616E10000 WATER | 5 MGAL | $48.00 | $1.00 | $5.00 | $0.17 | $1.00 | $15.00 | $51.25 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,900 | $12,037 | $4,725 | $4,250 | $4,000 | $8,000 | $6,500 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,000 | $250 | $3,000 | $750 | $10,000 | $2,673 | $5,929 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 365 CY | $158 | $58k | 17% |
| 611E04400 12" CONDUIT, TYPE B | 646 FT | $72 | $47k | 14% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 1,378 FT | $23 | $32k | 9% |
| 304E20000 AGGREGATE BASE | 422 CY | $57 | $24k | 7% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (106 CY | $185 | $20k | 6% |
| 203E10000 EXCAVATION | 1,408 CY | $13 | $18k | 5% |
| 605E05100 4" SHALLOW PIPE UNDERDRAINS | 1,344 FT | $13 | $17k | 5% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 77 CY | $223 | $17k | 5% |
| 611E98180 CATCH BASIN, NO. 3A | 4 EACH | $3,150 | $13k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 3% |