TUS-SR 800-03.82
TUS County · est $0.7M
Bid dateThursday, January 26—
TUS County · est $0.7M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 31 more items below.
| Item | Quantity | R1Dennison Bridge INC | R2Tucson INC | R3Shelly & Sands INC | R4Eclipse CO LLC | R5Alan Stone CO INC | R6Baumann Enterprises INC | R7Stanley Miller Construction Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 203E20000 EMBANKMENT | 15,448 CY | $13.00 | $12.65 | $16.00 | $18.00 | $23.00 | $16.00 | $38.50 | 41% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 244 CY | $250 | $226 | $250 | $209 | $250 | $150 | $232 | 13% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, |
| Item | Quantity | R1Dennison Bridge INC | R2Tucson INC | R3Shelly & Sands INC | R4Eclipse CO LLC | R5Alan Stone CO INC | R6Baumann Enterprises INC | R7Stanley Miller Construction Company |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $5,150 | $36,200 | $33,000 | $20,000 | $7,500 | $2,389 |
| 202E23000 PAVEMENT REMOVED | 110 SY | $20.00 | $14.25 | $11.00 | $22.00 | $25.70 | $13.50 | $31.00 |
| 202E32000 CURB REMOVED | 35 FT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $30,000 |
| $95,000 |
| $52,700 |
| $140,000 |
| $110,000 |
| $155,000 |
| $37,222 |
| 6% |
| 304E20000 AGGREGATE BASE | 220 CY | $100 | $85.50 | $80.00 | $91.00 | $100 | $88.00 | $132 | 5% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (48 CY | $405 | $375 | $400 | $347 | $485 | $250 | $385 | 4% |
| 832E30000 EROSION CONTROL | 15,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 659E00300 TOPSOIL | 503 CY | $29.00 | $30.00 | $28.00 | $48.00 | $27.00 | $48.00 | $25.00 | 3% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 34 CY | $420 | $569 | $450 | $526 | $460 | $290 | $584 | 3% |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $14,000 | $14,900 | $13,637 | $14,078 | $19,000 | $3,500 | $9,950 | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 712.5 FT | $19.00 | $20.50 | $18.60 | $18.60 | $20.00 | $60.00 | $21.10 | 3% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 87 CY | $150 | $220 | $266 | $379 | $270 | $250 | $421 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $12,500 | $28,900 | $20,000 | $25,567 | $30,000 | $20,000 | $14,889 | 3% |
| 619E16010 FIELD OFFICE, TYPE B | 9 MNTH | $1,000 | $1,295 | $2,800 | $685 | $1,000 | $700 | $650 | 2% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 512 FT | $16.00 | $21.00 | $14.00 | $23.00 | $16.00 | $45.00 | $13.00 | 2% |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $8,000 | $9,850 | $9,350 | $14,400 | $12,000 | $350 | $5,000 | 2% |
| 659E10000 SEEDING AND MULCHING | 4,527 SY | $1.50 | $1.50 | $0.71 | $0.71 | $2.00 | $11.00 | $1.50 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,500 | $14,900 | $3,750 | $8,500 | $15,000 | $5,000 | $5,000 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,200 | $10,350 | $3,774 | $13,000 | $10,000 | $26,000 | $10,100 | 1% |
| 646E10010 EDGE LINE, 6" | 0.24 MILE | $24,000 | $28,820 | $28,000 | $16,875 | $30,000 | $36,960 | $29,650 | 1% |
| 441E70200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (13 CY | $430 | $569 | $450 | $526 | $600 | $250 | $584 | 1% |
| $10.00 |
| $5.55 |
| $13.00 |
| $29.00 |
| $9.58 |
| $20.00 |
| $33.00 |
| 202E38000 GUARDRAIL REMOVED | 278 FT | $2.00 | $13.00 | $2.00 | $2.00 | $3.50 | $10.00 | $5.00 |
| 203E10000 EXCAVATION | 1,088 CY | $4.00 | $16.60 | $6.00 | $11.00 | $4.00 | $13.50 | $8.20 |
| 204E10000 SUBGRADE COMPACTION | 1,340 SY | $1.50 | $1.20 | $1.70 | $1.00 | $4.00 | $9.00 | $1.20 |
| 606E16051 GUARDRAIL REBUILT, TYPE MGS, AS PER PLAN | 400 FT | $11.00 | $12.00 | $13.50 | $13.50 | $11.00 | $55.00 | $12.20 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 1 EACH | $2,150 | $2,325 | $2,850 | $2,850 | $2,100 | $7,500 | $2,389 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 4 SY | $250 | $176 | $140 | $211 | $200 | $250 | $237 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $75.00 | $98.00 | $101 | $200 | $1,400 | $100 |
| 659E14000 REPAIR SEEDING AND MULCHING | 226 SY | $2.00 | $1.00 | $0.78 | $0.78 | $4.00 | $15.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.61 TON | $1,500 | $1,700 | $893 | $922 | $1,100 | $2,500 | $500 |
| 659E31000 LIME | 0.94 ACRE | $200 | $110 | $153 | $158 | $800 | $2,500 | $100 |
| 659E35000 WATER | 25 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $120 | $100 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,500 | $1,595 | $1,500 | $3,000 | $2,000 | $8,000 | $1,612 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 20 FT | $20.00 | $32.25 | $65.00 | $54.00 | $24.00 | $45.00 | $35.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $300 | $408 | $370 | $518 | $330 | $4,000 | $950 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 31 SY | $95.00 | $22.50 | $11.80 | $40.00 | $40.00 | $195 | $44.40 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, VARIES (1.25" | 313 SY | $9.00 | $26.00 | $8.17 | $40.00 | $30.00 | $100 | $44.40 |
| 407E10000 TACK COAT | 179 GAL | $6.00 | $4.35 | $3.25 | $4.00 | $4.00 | $6.00 | $4.40 |
| 621E00100 RPM | 5 EACH | $550 | $595 | $350 | $759 | $750 | $75.00 | $300 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 3 EACH | $20.00 | $15.50 | $29.00 | $21.00 | $100 | $50.00 | $5.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 10 EACH | $10.00 | $11.00 | $11.65 | $12.00 | $10.00 | $100 | $11.11 |
| 646E10200 CENTER LINE | 0.12 MILE | $42,000 | $38,430 | $29,000 | $16,875 | $45,000 | $36,960 | $39,534 |
| 614E12420 DETOUR SIGNING | 1 LS | $5,500 | $5,950 | $5,500 | $5,678 | $7,600 | $3,500 | $9,545 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.06 MILE | $12,250 | $13,235 | $13,119 | $12,646 | $13,000 | $36,960 | $22,623 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.12 MILE | $6,550 | $16,500 | $6,550 | $6,762 | $8,000 | $36,960 | $16,967 |
| 616E10000 WATER | 5 MGAL | $50.00 | $1.00 | $46.00 | $90.00 | $0.30 | $100 | $1.00 |
| 617E10100 COMPACTED AGGREGATE | 87 CY | $29.00 | $55.00 | $80.00 | $107 | $100 | $88.00 | $127 |
| 202E22900 APPROACH SLAB REMOVED | 171 SY | $20.00 | $21.50 | $10.00 | $80.00 | $10.00 | $17.00 | $7.50 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $13,900 | $17,501 | $8,000 | $15,000 | $5,000 | $20,818 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E20000 EMBANKMENT | 15,448 CY | $13 | $201k | 37% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 244 CY | $250 | $61k | 11% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $30,000 | $30k | 5% |
| 304E20000 AGGREGATE BASE | 220 CY | $100 | $22k | 4% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (48 CY | $405 | $19k | 4% |
| 832E30000 EROSION CONTROL | 15,000 EACH | $1 | $15k | 3% |
| 659E00300 TOPSOIL | 503 CY | $29 | $15k | 3% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 34 CY | $420 | $14k | 3% |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $14,000 | $14k | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 712.5 FT | $19 | $14k | 2% |