Ohio DOT · bid history
Showing the 300 most recent of 442 bids. Stats above reflect the full history.
| Result | Project | County | Let | Their bid | Winning bid |
|---|---|---|---|---|---|
| Rank 3of 4 | MEG-SR 681-03.07Earthwork | MEG | Apr 2026 | $12.3M | $9.94M |
| Rank 3of 3 | WAS-SR 26-03.75Signals | WAS | Apr 2026 | $1.06M | $934k |
| Rank 3of 3 | LAW-SR 141/CR 7E-02.45Signals | LAW | Mar 2026 | $338k | $258k |
| Rank 2of 3 | LAW-SR 775-05.77Earthwork | LAW | Feb 2026 | $713k | $564k |
| Rank 2of 4 | WAS-IR 77-09.58Maintenance | WAS | Jan 2026 | $2.56M | $2.21M |
| Wonof 6 | ATH-SR 56-00.90Pavement | ATH | Jan 2026 | $1.73M | $1.73M |
| Rank 5of 7 | ATH-SR 13-13.71Earthwork | ATH | Jan 2026 | $1.29M | $886k |
| Rank 5of 5 | ATH-SR 682-04.70Safety | ATH | Jan 2026 | $1.17M | $952k |
| Wonof 4 | FAI-US 22-03.68Bridge | FAI | Dec 2025 | $1.80M | $1.80M |
| Rank 4of 5 | NOB-CEVSD Campus ConnectivitySafety | NOB | Dec 2025 | $2.23M | $2.04M |
| Rank 2of 4 | BEL-TR 428-00.30Bridge | BEL | Dec 2025 | $949k | $884k |
| Rank 2of 4 | MOE-SR 78-08.35Earthwork | MOE | Dec 2025 | $464k | $427k |
| Wonof 6 | MOE-TR 1004-02.27Bridge | MOE | Dec 2025 | $1.21M | $1.21M |
| Rank 3of 4 | MEG-SR 733-01.13Drainage | MEG | Dec 2025 | $505k | $419k |
| Rank 7of 7 | ROS-CR 550-17.12 (Safety)Signals | ROS | Dec 2025 | $692k | $497k |
| Rank 6of 7 | NOB-SR 78-01.08 / NOB-SR 83-00.02Bridge | NOB | Nov 2025 | $1.97M | $1.66M |
| Rank 3of 7 | JAC-SR 139-06.82Drainage | JAC | Nov 2025 | $457k | $369k |
| Wonof 7 | ROS-SR 138-17.28Bridge | ROS | Nov 2025 | $2.46M | $2.46M |
| Rank 3of 8 | HIG-SR 73-00.26Bridge | HIG | Nov 2025 | $2.09M | $1.74M |
| Rank 2of 3 | JEF-SR 213-18.09Earthwork | JEF | Nov 2025 | $1.15M | $918k |
| Rank 3of 5 | BRO-US 62-27.42Drainage | BRO | Oct 2025 | $1.31M | $984k |
| Rank 2of 2 | LAW-SR 140-00.09Drainage | LAW | Oct 2025 | $717k | $679k |
| Rank 7of 7 | FRA-EXPO CENTER/OHC-FY2026Pavement | FRA | Oct 2025 | $1.60M | $1.02M |
| Rank 3of 7 | ROS-US 35-23.67Earthwork | ROS | Oct 2025 | $715k | $590k |
| Rank 2of 3 | VIN-Moonville Trail 144/48 & 70Bridge | VIN | Oct 2025 | $1.98M | $1.53M |
| Rank 4of 4 | NOB-SR 147-16.82Drainage | NOB | Sep 2025 | $646k | $573k |
| Rank 4of 6 | DEL-SR 315-05.00/06.40/08.10Earthwork | DEL | Sep 2025 | $4.19M | $3.33M |
| Rank 3of 3 | WAS-Marietta SRTS FY2026Safety | WAS | Sep 2025 | $694k | $465k |
| Rank 6of 10 | PIC-SR 56-20.77Earthwork | PIC | Sep 2025 | $663k | $469k |
| Rank 4of 8 | ROS-SR 772-07.64Bridge | ROS | Aug 2025 | $1.74M | $1.65M |
| Rank 4of 8 | WAS-Beverly SidewalkSafety | WAS | Aug 2025 | $374k | $326k |
| Rank 2of 4 | MED-IR 271-05.64Earthwork | MED | Jul 2025 | $516k | $449k |
| Rank 4of 5 | SCI-Shawnee State ODNR FY26Pavement | SCI | Jul 2025 | $424k | $389k |
| Rank 3of 4 | ATH-SR 329-13.64Safety | ATH | Jul 2025 | $397k | $356k |
| Rank 2of 5 | LAW-SR 217-02.53Earthwork | LAW | Jun 2025 | $445k | $445k |
| Rank 3of 5 | JAC-SR 279-02.59Drainage | JAC | Jun 2025 | $295k | $269k |
| Wonof 6 | ROS-SR 772-10.40Earthwork | ROS | May 2025 | $4.08M | $4.08M |
| Rank 2of 4 | COS-SR 93-00.75Earthwork | COS | May 2025 | $2.01M | $1.94M |
| Wonof 5 | ATH-Madison St BridgeBridge | ATH | May 2025 | $1.87M | $1.87M |
| Rank 2of 4 | WAY-SR 241-01.32Earthwork | WAY | May 2025 | $418k | $413k |
| Rank 2of 4 | BEL-SR 7-10.96Earthwork | BEL | Apr 2025 | $1.34M | $887k |
| Rank 4of 6 | DEL-SR 315-05.66 at Hyatts RdSignals | DEL | Apr 2025 | $3.00M | $2.76M |
| Wonof 2 | MRG-SR 78-10.96Earthwork | MRG | Apr 2025 | $646k | $646k |
| Wonof 5 | WAS-SR 550-16.24Drainage | WAS | Apr 2025 | $514k | $514k |
| Rank 3of 3 | SCI-US 52-15.06Other | SCI | Apr 2025 | $2.20M | $1.90M |
| Rank 3of 3 | ATH-US 50-33.58Signals | ATH | Apr 2025 | $3.55M | $3.20M |
| Rank 4of 5 | PIK-SR 32-25.87 (Safety)Signals | PIK | Mar 2025 | $3.03M | $2.65M |
| Rank 5of 9 | PER-MR 280-00.10 (Scotch Hill)Other | PER | Mar 2025 | $202k | $135k |
| Rank 5of 5 | HOC-SR 664-13.03Pavement | HOC | Mar 2025 | $1.36M | $1.03M |
| Wonof 3 | WAS-SR 60-15.79Earthwork | WAS | Feb 2025 | $818k | $818k |
| Rank 6of 6 | MEG-US 33-13.98Pavement | MEG | Feb 2025 | $40.4M | $31.1M |
| Wonof 5 | BEL-SR 647-03.29Earthwork | BEL | Feb 2025 | $619k | $619k |
| Wonof 1 | MEG-SR 681-06.24Earthwork | MEG | Feb 2025 | $945k | $945k |
| Wonof 5 | LAW-SR 775-19.50Earthwork | LAW | Feb 2025 | $721k | $721k |
| Wonof 6 | VIN-CR 25-00.20Bridge | VIN | Feb 2025 | $726k | $726k |
| Rank 6of 6 | PIK-SR 220-05.50SRDrainage | PIK | Feb 2025 | $837k | $554k |
| Wonof 3 | MOE-SR 537-00.32Earthwork | MOE | Feb 2025 | $1.65M | $1.65M |
| Rank 2of 6 | HOC-SR 56-05.69/HOC-SR 180-02.33Bridge | HOC | Feb 2025 | $1.73M | $1.69M |
| Rank 3of 3 | NOB-CR 56-South AccessSignals | NOB | Feb 2025 | $765k | $557k |
| Rank 2of 4 | MRG-Appalachian Hills WLA-NR1Pavement | MRG | Jan 2025 | $360k | $304k |
| Rank 2of 4 | NOB-SR 821-08.31Pavement | NOB | Jan 2025 | $1.55M | $1.29M |
| Wonof 4 | BRO-SR 756-00.14Drainage | BRO | Jan 2025 | $294k | $294k |
| Wonof 4 | GAL-SR 7-19.94Earthwork | GAL | Jan 2025 | $2.47M | $2.47M |
| Rank 6of 7 | VIN-SR 328-08.97Earthwork | VIN | Jan 2025 | $231k | $156k |
| Wonof 9 | HAM-US 52-36.85Earthwork | HAM | Jan 2025 | $1.93M | $1.93M |
| Rank 3of 6 | MEG-US 33-(07.61)(07.87)Earthwork | MEG | Jan 2025 | $897k | $699k |
| Rank 2of 7 | PIK-CR 9-05.29Bridge | PIK | Dec 2024 | $1.51M | $1.47M |
| Rank 2of 2 | BEL-National Rd Tunnel RehabSafety | BEL | Dec 2024 | $4.52M | $4.23M |
| Rank 3of 5 | FAI-US 33-12.53Signals | FAI | Nov 2024 | $807k | $756k |
| Rank 3of 4 | BEL-Barnesville TrailSafety | BEL | Nov 2024 | $3.36M | $3.27M |
| Rank 6of 9 | ATH-SR 682-06.07 RoundaboutSignals | ATH | Oct 2024 | $5.53M | $4.75M |
| Rank 8of 8 | MUS-SR 146-29.36Earthwork | MUS | Oct 2024 | $1.09M | $690k |
| Rank 3of 3 | PER-SR 13-19.64Drainage | PER | Oct 2024 | $1.41M | $1.03M |
| Rank 9of 9 | ROS-SR 772-08.76Earthwork | ROS | Oct 2024 | $453k | $218k |
| Rank 2of 5 | MEG-SR 7-05.28Signals | MEG | Oct 2024 | $291k | $288k |
| Rank 5of 5 | ROS-SR 207-04.75Bridge | ROS | Oct 2024 | $732k | $587k |
| Rank 10of 10 | COS-TR 252-00.00Bridge | COS | Sep 2024 | $884k | $553k |
| Wonof 5 | BEL-SR 379-02.23Earthwork | BEL | Sep 2024 | $480k | $480k |
| Rank 4of 7 | MEG-Middleport Streetscape Ph 1Safety | MEG | Sep 2024 | $1.82M | $1.69M |
| Rank 4of 4 | TUS-SR 212-07.84Drainage | TUS | Aug 2024 | $837k | $504k |
| Rank 7of 7 | SCI-SR 335-10.31Bridge | SCI | Aug 2024 | $2.84M | $1.95M |
| Rank 4of 6 | MRG-SR 376-14.59Drainage | MRG | Jul 2024 | $360k | $336k |
| Rank 2of 4 | HAS-SR 151-07.61Drainage | HAS | Jul 2024 | $989k | $982k |
| Rank 5of 5 | LIC-SR 37-09.63Drainage | LIC | Jun 2024 | $920k | $604k |
| Rank 6of 6 | PIK-CR 57-00.62Drainage | PIK | Jun 2024 | $500k | $307k |
| Wonof 5 | ATH-SR 690-04.21Earthwork | ATH | May 2024 | $638k | $638k |
| Rank 3of 3 | ATH-SR 144-12.08Earthwork | ATH | May 2024 | $949k | $793k |
| Wonof 3 | WAS-IR 77-17.13Earthwork | WAS | May 2024 | $5.70M | $5.70M |
| Rank 3of 3 | MRG-Chesterhill Streetscape Ph 1Safety | MRG | May 2024 | $629k | $470k |
| Wonof 2 | JEF-SR 7 Brilliant Park-N-RidePavement | JEF | May 2024 | $257k | $257k |
| Wonof 2 | CAR-SR 332-10.40Safety | CAR | May 2024 | $1.04M | $1.04M |
| Wonof 6 | JAC-US 35-15.36 SlideEarthwork | JAC | May 2024 | $309k | $309k |
| Rank 2of 3 | WAS-SR 550-14.30Earthwork | WAS | May 2024 | $654k | $546k |
| Wonof 4 | NOB-SR 147-09.93Earthwork | NOB | May 2024 | $574k | $574k |
| Rank 5of 6 | MEG-US 33-19.00Pavement | MEG | May 2024 | $4.92M | $3.47M |
| Rank 2of 4 | MRG-SR 37-08.09Earthwork | MRG | May 2024 | $487k | $462k |
| Rank 2of 5 | HAS-US 22-05.43Earthwork | HAS | May 2024 | $462k | $408k |
| Wonof 4 | ATH-SR 144-06.04Earthwork | ATH | Apr 2024 | $805k | $805k |
| Rank 3of 4 | MEG-CR 39-02.025Bridge | MEG | Apr 2024 | $668k | $544k |
| Rank 3of 3 | MOE-TR 1206-00.01Bridge | MOE | Apr 2024 | $428k | $309k |
| Rank 3of 4 | MAH-SR 14-09.18Earthwork | MAH | Apr 2024 | $672k | $474k |
| Wonof 4 | HEN-SR 110-03.51 Slope RepairEarthwork | HEN | Apr 2024 | $1.71M | $1.71M |
| Rank 5of 6 | ATH-Wallace O'Dowd WLAMaintenance | ATH | Apr 2024 | $392k | $303k |
| Rank 3of 4 | BEL-SR 379-06.34Earthwork | BEL | Apr 2024 | $646k | $508k |
| Rank 2of 2 | ATH-Green Drive SafetySafety | ATH | Apr 2024 | $618k | $482k |
| Rank 4of 7 | PIK-SR 772-13.53 CulvertDrainage | PIK | Apr 2024 | $413k | $333k |
| Wonof 3 | PIC-US 62-06.94Drainage | PIC | Apr 2024 | $521k | $521k |
| Rank 6of 7 | JAC-SR 279-04.06Drainage | JAC | Apr 2024 | $459k | $332k |
| Wonof 4 | MEG-CR 82-03.51Bridge | MEG | Apr 2024 | $560k | $560k |
| Wonof 6 | ATH-Chauncey BikewayBridge | ATH | Apr 2024 | $3.01M | $3.01M |
| Rank 2of 4 | BEL-SR 147-00.40Drainage | BEL | Apr 2024 | $397k | $313k |
| Rank 5of 6 | PIK-CR 36-04.35 IntersectionSignals | PIK | Apr 2024 | $901k | $663k |
| Rank 2of 3 | MEG-Racine Walk/Ride Ph. 4-5-8Safety | MEG | Mar 2024 | $2.23M | $2.06M |
| Rank 5of 10 | BRO-SR 32 Rest AreaDrainage | BRO | Mar 2024 | $278k | $239k |
| Rank 5of 5 | BEL-US 250-09.08Earthwork | BEL | Mar 2024 | $425k | $274k |
| Rank 5of 5 | VIN-US 50-28.74Drainage | VIN | Mar 2024 | $774k | $520k |
| Rank 2of 2 | MOE-SR 7-02.21Pavement | MOE | Mar 2024 | $13.3M | $11.1M |
| Rank 3of 5 | LIC-TR 171-01.34 (Multiuse Path)Safety | LIC | Feb 2024 | $1.13M | $864k |
| Rank 3of 9 | HIG-SR 138-24.60Drainage | HIG | Feb 2024 | $277k | $217k |
| Rank 2of 5 | BRO-US 52-10.25Earthwork | BRO | Feb 2024 | $1.48M | $1.43M |
| Rank 5of 5 | ADA-SR 348-12.09Safety | ADA | Feb 2024 | $656k | $425k |
| Rank 4of 4 | MRW-SR 314-(08.11) (20.62)Drainage | MRW | Feb 2024 | $1.21M | $789k |
| Rank 4of 6 | STA-SR 225-02.65 SlideEarthwork | STA | Feb 2024 | $629k | $339k |
| Wonof 7 | PIK-SR 772-14.10 Slide RepairEarthwork | PIK | Jan 2024 | $847k | $847k |
| Rank 4of 6 | JAC-SR 139-03.17Drainage | JAC | Jan 2024 | $454k | $345k |
| Rank 3of 5 | LIC-SR 13-00.42Signals | LIC | Jan 2024 | $805k | $738k |
| Rank 5of 7 | HOC-SR 328-06.22Drainage | HOC | Jan 2024 | $360k | $258k |
| Rank 3of 5 | BRO-US 52-22.27 Slide RepairEarthwork | BRO | Jan 2024 | $1.24M | $1.17M |
| Wonof 5 | BEL-SR 147-02.84Earthwork | BEL | Jan 2024 | $2.09M | $2.09M |
| Rank 3of 4 | CLI-SR 73-01.80/20.74, CLI-SR 350-15.78Drainage | CLI | Jan 2024 | $1.43M | $1.15M |
| Rank 7of 7 | VIN-SR 328-06.42Drainage | VIN | Jan 2024 | $330k | $217k |
| Rank 3of 4 | PER-CR 99-00.00 SRTSSafety | PER | Jan 2024 | $329k | $304k |
| Rank 2of 2 | STA-IR 77-02.57Earthwork | STA | Dec 2023 | $781k | $712k |
| Rank 2of 3 | MRG-SR 60-14.11 Center LanePavement | MRG | Dec 2023 | $1.98M | $1.80M |
| Wonof 2 | DEL-SR 605-00.20Signals | DEL | Dec 2023 | $2.27M | $2.27M |
| Rank 6of 6 | WAS-SR 26-19.32Drainage | WAS | Dec 2023 | $1.01M | $682k |
| Rank 4of 4 | HIG-Leesburg-SRTSSafety | HIG | Nov 2023 | $227k | $154k |
| Rank 6of 9 | NOB-SR 146-01.95Drainage | NOB | Nov 2023 | $409k | $336k |
| Rank 3of 7 | LAK-IR 90-05.57 SlideEarthwork | LAK | Nov 2023 | $1.32M | $1.09M |
| Rank 6of 7 | MAH-IR 76-03.03 Noise WallSafety | MAH | Nov 2023 | $1.47M | $1.15M |
| Rank 4of 7 | ROS-US 23-06.63 (Trego Creek Safety)Safety | ROS | Nov 2023 | $1.63M | $1.40M |
| Rank 2of 2 | JAC-SR 788-04.71Drainage | JAC | Nov 2023 | $659k | $431k |
| Rank 5of 6 | HAS-SR 342-03.88Earthwork | HAS | Oct 2023 | $545k | $316k |
| Rank 4of 5 | WAS-SR 339-07.32Drainage | WAS | Oct 2023 | $299k | $236k |
| Wonof 2 | ATH-Hockhocking Adena BikewaySafety | ATH | Oct 2023 | $418k | $418k |
| Wonof 3 | JEF-SR 7-22.93Earthwork | JEF | Oct 2023 | $610k | $610k |
| Rank 4of 5 | PIK-CR 8-05.75Bridge | PIK | Oct 2023 | $897k | $676k |
| Wonof 4 | LAW-US 52-13.59 (Safety)Signals | LAW | Sep 2023 | $497k | $497k |
| Rank 2of 7 | MUS-IR 70-07.36Earthwork | MUS | Sep 2023 | $482k | $482k |
| Wonof 9 | PIK-CR 50-02.55 OH18-01Earthwork | PIK | Sep 2023 | $1.13M | $1.13M |
| Rank 4of 4 | CLI-/GRE Culvert Repair FY2024Drainage | CLI | Sep 2023 | $732k | $393k |
| Rank 3of 6 | ALL-SR 115-01.11Earthwork | ALL | Sep 2023 | $766k | $600k |
| Rank 3of 7 | MUS-SR 16-06.70Earthwork | MUS | Aug 2023 | $2.35M | $1.81M |
| Rank 3of 3 | MOE-SR 7-07.51Earthwork | MOE | Aug 2023 | $1.95M | $1.53M |
| Rank 3of 3 | ROS-Tar Hollow RdDrainage | ROS | Aug 2023 | $213k | $155k |
| Rank 4of 4 | GAL-SR 218-09.28Drainage | GAL | May 2023 | $487k | $376k |
| Wonof 4 | ADA-SR 348-11.20Safety | ADA | May 2023 | $1.90M | $1.90M |
| Rank 4of 4 | MOE-TR 2001-00.13Bridge | MOE | May 2023 | $793k | $489k |
| Rank 3of 4 | MOE-SR 78-08.63Maintenance | MOE | May 2023 | $564k | $500k |
| Wonof 3 | WAS-SR 821-08.69Earthwork | WAS | May 2023 | $799k | $799k |
| Wonof 3 | NOB-SR 146-16.35Earthwork | NOB | May 2023 | $1.04M | $1.04M |
| Rank 2of 4 | VIN-SR 356-01.34Earthwork | VIN | May 2023 | $850k | $799k |
| Wonof 5 | MOE-SR 255-16.38Earthwork | MOE | May 2023 | $529k | $529k |
| Wonof 1 | ATH-SR 13-00.46Earthwork | ATH | May 2023 | $430k | $430k |
| Rank 3of 3 | MOE-TR 183-00.13Bridge | MOE | May 2023 | $794k | $549k |
| Rank 4of 5 | BEL-US 250-06.45Earthwork | BEL | Apr 2023 | $480k | $442k |
| Rank 2of 5 | JEF-SR 164-08.80Earthwork | JEF | Apr 2023 | $539k | $427k |
| Rank 3of 4 | PIC-SR 56-20.41Earthwork | PIC | Apr 2023 | $379k | $252k |
| Rank 2of 5 | LAW-US 52-17.57 Slide RepairEarthwork | LAW | Apr 2023 | $1.05M | $919k |
| Rank 5of 6 | BEL-US 250-07.90Earthwork | BEL | Apr 2023 | $567k | $504k |
| Rank 2of 2 | MEG-TR 231-00.93Bridge | MEG | Apr 2023 | $599k | $463k |
| Wonof 4 | WAS-SR 676-02.50Earthwork | WAS | Mar 2023 | $580k | $580k |
| Rank 3of 5 | JAC-SR 279-08.76 Culvert ReplaceDrainage | JAC | Mar 2023 | $174k | $149k |
| Rank 3of 3 | LAW-SR 141-15.28Drainage | LAW | Mar 2023 | $520k | $411k |
| Wonof 7 | NOB-Appalachian Hills WLAPavement | NOB | Mar 2023 | $1.07M | $1.07M |
| Rank 5of 10 | HOC-SR 664-16.51Drainage | HOC | Mar 2023 | $531k | $449k |
| Wonof 4 | ATH-SR 329-01.00Earthwork | ATH | Feb 2023 | $422k | $422k |
| Rank 7of 7 | ROS-SR 327-02.47Drainage | ROS | Feb 2023 | $1.13M | $934k |
| Rank 7of 8 | NOB-SR 821-18.71Drainage | NOB | Feb 2023 | $305k | $196k |
| Rank 4of 4 | MEG-CR 27-03.969Bridge | MEG | Feb 2023 | $557k | $439k |
| Rank 4of 9 | GUE-SR 265-05.68Earthwork | GUE | Feb 2023 | $150k | $124k |
| Wonof 2 | CLI-SR 73-16.54Drainage | CLI | Feb 2023 | $645k | $645k |
| Rank 5of 5 | MOE-CR 29-06.93Bridge | MOE | Feb 2023 | $780k | $617k |
| Rank 4of 9 | HIG-SR 73-17.61 & 17.66 CulvertDrainage | HIG | Jan 2023 | $327k | $264k |
| Rank 3of 4 | MRG-SR 376-01.10Earthwork | MRG | Jan 2023 | $1.52M | $1.33M |
| Rank 5of 7 | TUS-SR 800-03.82Other | TUS | Jan 2023 | $886k | $546k |
| Rank 3of 5 | FAI-SR 37-27.41Earthwork | FAI | Jan 2023 | $876k | $569k |
| Rank 2of 4 | BEL-SR 800-01.57Earthwork | BEL | Jan 2023 | $442k | $423k |
| Wonof 8 | JAC-SR 139-10.44Drainage | JAC | Jan 2023 | $584k | $584k |
| Rank 2of 5 | ERI-SR 4-00.23Earthwork | ERI | Jan 2023 | $506k | $496k |
| Wonof 2 | ASD-US 42-18.03Earthwork | ASD | Jan 2023 | $875k | $875k |
| Rank 2of 4 | HAS-SR 258-01.11Earthwork | HAS | Dec 2022 | $425k | $387k |
| Rank 5of 8 | HOL-SR 39/SR 754-11.17/00.16,TUS-SR 93-10.80Drainage | HOL | Dec 2022 | $1.98M | $1.58M |
| Rank 4of 7 | SCI-SR 125-02.90Drainage | SCI | Dec 2022 | $1.06M | $855k |
| Rank 4of 5 | BEL-SR 149-01.92Maintenance | BEL | Dec 2022 | $1.07M | $942k |
| Wonof 6 | FRA-/FAI-US 33-31.04/00.00 Noise WallSafety | FRA | Dec 2022 | $1.14M | $1.14M |
| Rank 5of 6 | MUS-SR 146/SR 340-31.42/03.26 (PART 1 AND PART 2)Earthwork | MUS | Dec 2022 | $991k | $683k |
| Rank 7of 7 | MOE-CR 28-00.54Bridge | MOE | Nov 2022 | $900k | $752k |
| Rank 9of 9 | HIG-TR 239-00.88Bridge | HIG | Nov 2022 | $936k | $735k |
| Rank 2of 8 | VIN-SR 93-12.16Drainage | VIN | Nov 2022 | $991k | $905k |
| Rank 6of 7 | VIN-SR 160-16.05Drainage | VIN | Oct 2022 | $807k | $621k |
| Rank 2of 3 | HOC-SR 678-02.10Earthwork | HOC | Oct 2022 | $150k | $121k |
| Rank 4of 4 | PIC-SR 56-28.27Drainage | PIC | Sep 2022 | $580k | $478k |
| Rank 4of 8 | HOC-SR 180-05.36Drainage | HOC | Sep 2022 | $991k | $799k |
| Rank 4of 5 | HAS-US 22-03.59Earthwork | HAS | Aug 2022 | $960k | $808k |
| Rank 5of 7 | D10-CR FY2023Drainage | D10 | Aug 2022 | $313k | $106k |
| Rank 5of 10 | MUS-IR 70-25.90Earthwork | MUS | Aug 2022 | $773k | $642k |
| Wonof 4 | MEG-SR 124-62.80Earthwork | MEG | Jul 2022 | $700k | $700k |
| Rank 3of 4 | MOE-SR 26-14.76Earthwork | MOE | Jul 2022 | $571k | $517k |
| Rank 7of 9 | ROS-SR 772-10.60Earthwork | ROS | Jun 2022 | $819k | $662k |
| Wonof 4 | BEL-US 250-04.49Earthwork | BEL | Jun 2022 | $353k | $353k |
| Rank 4of 5 | BEL-US 250-08.10Earthwork | BEL | Jun 2022 | $329k | $272k |
| Rank 3of 5 | HAS-US 22-01.86Earthwork | HAS | Jun 2022 | $359k | $332k |
| Rank 3of 4 | BEL-SR 149-08.15 (PART 1 AND PART 2)Earthwork | BEL | Jun 2022 | $1.19M | $1.08M |
| Rank 3of 3 | BEL-CR 4-23.62/25.79Earthwork | BEL | Jun 2022 | $754k | $732k |
| Wonof 4 | MEG-SR 143-09.20Earthwork | MEG | May 2022 | $880k | $880k |
| Wonof 5 | BRO-US 62-10.75Earthwork | BRO | May 2022 | $527k | $527k |
| Rank 5of 5 | GAL-SR 554-10.17/12.63Drainage | GAL | May 2022 | $778k | $658k |
| Rank 5of 6 | ROS-Scioto Trail SFDrainage | ROS | May 2022 | $878k | $665k |
| Wonof 4 | BEL-SR 26-06.92Earthwork | BEL | May 2022 | $391k | $391k |
| Rank 2of 6 | ADA-SR 125-01.34 Slide RepairSafety | ADA | May 2022 | $297k | $279k |
| Rank 5of 5 | ATH-SR 691-05.17Drainage | ATH | May 2022 | $594k | $408k |
| Rank 4of 4 | SCI-SR 335-09.38 Slide RepairEarthwork | SCI | May 2022 | $327k | $249k |
| Rank 3of 4 | BEL-SR 149-13.63Earthwork | BEL | May 2022 | $607k | $508k |
| Rank 5of 5 | JEF-SR 7-04.00 Truck Parking AreaPavement | JEF | May 2022 | $866k | $594k |
| Rank 3of 10 | MEG-SR 681-04.78Earthwork | MEG | May 2022 | $627k | $595k |
| Wonof 3 | LAW-SR 378-06.56 LandslideEarthwork | LAW | May 2022 | $1.33M | $1.33M |
| Rank 7of 7 | BEL-CR 56-33.21/34.26Earthwork | BEL | Apr 2022 | $579k | $429k |
| Rank 3of 6 | HAS-SR 151-24.96Earthwork | HAS | Apr 2022 | $1.38M | $1.24M |
| Rank 3of 4 | GAL-SR 7-29.99Earthwork | GAL | Apr 2022 | $724k | $644k |
| Wonof 7 | ATH-SR 329-05.26Earthwork | ATH | Apr 2022 | $1.90M | $1.90M |
| Rank 4of 5 | ATH-Elm StreetPavement | ATH | Apr 2022 | $772k | $707k |
| Wonof 2 | ATH-US 33-14.40Pavement | ATH | Apr 2022 | $9.52M | $9.52M |
| Wonof 4 | JAC-SR 327-12.95 CulvertDrainage | JAC | Apr 2022 | $262k | $262k |
| Rank 2of 6 | PIK-CR 50-03.32 OH16-01Earthwork | PIK | Apr 2022 | $885k | $802k |
| Rank 3of 4 | WAS-SR 7-28.97Drainage | WAS | Apr 2022 | $430k | $309k |
| Rank 5of 5 | LAW-US 52-22.09 GeotechEarthwork | LAW | Apr 2022 | $1.38M | $1.02M |
| Rank 3of 5 | BEL-SR 26-03.75/03.91Earthwork | BEL | Mar 2022 | $393k | $374k |
| Rank 3of 4 | MRG-SR 376-01.32Earthwork | MRG | Mar 2022 | $1.15M | $1.07M |
| Wonof 6 | ERI-SR 113-05.85 GSMEarthwork | ERI | Mar 2022 | $660k | $660k |
| Rank 2of 5 | HOL-US 62-15.03Earthwork | HOL | Mar 2022 | $547k | $543k |
| Rank 3of 4 | MEG-Middleport/Pomeroy Path Ph 3Safety | MEG | Mar 2022 | $573k | $500k |
| Rank 3of 4 | BRO-SR 763-01.51Drainage | BRO | Mar 2022 | $1.14M | $985k |
| Rank 3of 5 | MEG-SR 684-00.19Drainage | MEG | Mar 2022 | $393k | $299k |
| Rank 2of 4 | HAM-US 52-37.99Earthwork | HAM | Mar 2022 | $1.97M | $1.67M |
| Rank 2of 3 | MRG-SR 376/SR 555-12.33/15.60Earthwork | MRG | Mar 2022 | $1.63M | $1.61M |
| Wonof 3 | ROS-SR 207-09.32 CulvertDrainage | ROS | Feb 2022 | $277k | $277k |
| Rank 3of 5 | TUS-SR 212-10.80Drainage | TUS | Feb 2022 | $680k | $608k |
| Rank 2of 5 | JEF-SR 150-04.80Earthwork | JEF | Feb 2022 | $445k | $443k |
| Wonof 2 | HEN-SR 110-01.21 GSMEarthwork | HEN | Feb 2022 | $836k | $836k |
| Rank 2of 5 | BRO-US 52-16.22 SlideEarthwork | BRO | Feb 2022 | $1.13M | $1.04M |
| Rank 4of 6 | HAS-Country Club Rd SidewalksSafety | HAS | Feb 2022 | $269k | $223k |
| Rank 3of 3 | WAS-IR 77-00.84Drainage | WAS | Jan 2022 | $1.01M | $922k |
| Rank 4of 5 | LAW-SR 7-01.62 Slide RepairEarthwork | LAW | Jan 2022 | $941k | $849k |
| Rank 6of 7 | ADA-SR 770-10.25Bridge | ADA | Jan 2022 | $695k | $575k |
| Rank 3of 5 | LAW-SR 7-00.58 Slide RepairEarthwork | LAW | Jan 2022 | $1.09M | $990k |
| Rank 2of 6 | BEL-SR 149-06.23Earthwork | BEL | Jan 2022 | $470k | $444k |
| Rank 4of 5 | JAC-SR 776-06.18 Bridge ReplacementBridge | JAC | Jan 2022 | $369k | $287k |
| Rank 3of 10 | ROS-SR 41-05.50 GeotechEarthwork | ROS | Jan 2022 | $471k | $435k |
| Rank 2of 6 | MEG-CR 163-00.47Bridge | MEG | Jan 2022 | $440k | $412k |
| Rank 7of 9 | TUS-Bodmer Ave SidewalksSafety | TUS | Jan 2022 | $206k | $142k |
| Rank 2of 7 | JEF-SR 7-10.37 Ramp BEarthwork | JEF | Dec 2021 | $223k | $194k |
| Rank 4of 7 | LIC-IR 70-01.90Safety | LIC | Nov 2021 | $800k | $743k |
| Wonof 6 | BEL-SR 149-10.08Earthwork | BEL | Nov 2021 | $1.04M | $1.04M |
| Rank 4of 8 | HAS-US 22-05.87Earthwork | HAS | Nov 2021 | $560k | $484k |
| Rank 2of 4 | BEL-SR 147-16.14Earthwork | BEL | Oct 2021 | $241k | $237k |
| Rank 4of 10 | GAL-SR 218-10.26Earthwork | GAL | Oct 2021 | $587k | $580k |
| Rank 3of 3 | WAS-SR 7-39.35Earthwork | WAS | Sep 2021 | $1.75M | $1.50M |
| Rank 2of 3 | MOE-SR 78-24.46Earthwork | MOE | Sep 2021 | $2.12M | $2.06M |
| Rank 6of 6 | CUY-IR 480-01.10 Noise BarrierSafety | CUY | Sep 2021 | $3.04M | $2.53M |
| Rank 3of 10 | HOL-SR 520-11.80/12.91Earthwork | HOL | Sep 2021 | $1.30M | $1.24M |
| Rank 4of 8 | MEG-SR 143-11.57Earthwork | MEG | Sep 2021 | $294k | $203k |
| Wonof 3 | MEG-US 33-09.36Earthwork | MEG | Sep 2021 | $2.01M | $2.01M |
| Wonof 10 | GUE-US 22-14.57Earthwork | GUE | Sep 2021 | $383k | $383k |
| Wonof 6 | HOC-Tar Hollow State ParkEarthwork | HOC | Sep 2021 | $279k | $279k |
| Wonof 7 | MEG-SR 681-04.95/05.51Earthwork | MEG | Sep 2021 | $1.89M | $1.89M |
| Rank 2of 4 | WAS-SR 7-32.15Other | WAS | Aug 2021 | $299k | $292k |
| Rank 4of 7 | SCI-SR 104-08.15 LandslideDrainage | SCI | Aug 2021 | $919k | $723k |
| Rank 2of 8 | ATH-US 33-18.48Earthwork | ATH | Aug 2021 | $2.48M | $2.25M |
| Rank 2of 6 | PER-SR 669-09.11Earthwork | PER | Aug 2021 | $99k | $68k |
| Rank 2of 5 | BEL-CR 16-02.18/02.46Earthwork | BEL | Aug 2021 | $476k | $369k |
| Rank 4of 8 | JEF-CR 6-05.39Earthwork | JEF | Aug 2021 | $248k | $210k |
| Rank 2of 4 | NOB-SR 285-03.97Earthwork | NOB | Jul 2021 | $434k | $365k |
| Rank 6of 8 | MOE-CR 12-18.00Bridge | MOE | Jul 2021 | $400k | $329k |
| Rank 4of 5 | MRG-SR 60-21.20Earthwork | MRG | Jul 2021 | $891k | $650k |
| Wonof 8 | WAS-SR 550-03.31Earthwork | WAS | Jul 2021 | $320k | $320k |
| Rank 2of 10 | WAS-SR 550-09.21Earthwork | WAS | Jul 2021 | $145k | $139k |
| Rank 5of 7 | WAS-SR 26-22.52Earthwork | WAS | Jul 2021 | $677k | $580k |
| Rank 4of 8 | FAY-SR 41-00.47/02.32Drainage | FAY | May 2021 | $774k | $648k |
| Rank 4of 7 | HAS-SR 151-21.12/25.34Drainage | HAS | May 2021 | $554k | $454k |
| Rank 3of 6 | BRO-SR 221-06.80 Landslide SiteEarthwork | BRO | May 2021 | $1.65M | $1.39M |
| Wonof 5 | NOB-SR 78-11.38Earthwork | NOB | May 2021 | $782k | $782k |
| Rank 2of 5 | BEL-CR 46-02.48/02.79 (PART 1 AND PART 2)Earthwork | BEL | May 2021 | $807k | $745k |
| Wonof 6 | BEL-CR 4-04.34/05.15Earthwork | BEL | May 2021 | $729k | $729k |
| Rank 3of 5 | PIK-CR 50-03.40 OH18-01Earthwork | PIK | Apr 2021 | $1.08M | $839k |
| Wonof 6 | JEF-CR 53-07.45Earthwork | JEF | Apr 2021 | $535k | $535k |
| Rank 2of 7 | GAL-US 35-13.07Earthwork | GAL | Mar 2021 | $421k | $408k |
| Rank 4of 7 | LAW-SR 775-(15.45)(15.70)Bridge | LAW | Mar 2021 | $1.69M | $1.61M |
| Rank 4of 9 | MRG-SR 266-11.46Drainage | MRG | Mar 2021 | $711k | $661k |
| Rank 5of 6 | BEL-US 250-07.65Earthwork | BEL | Mar 2021 | $389k | $249k |
Source: public.bid_results, ODOT bid tabs. Bidder strings are normalized to upper-case but not yet entity-resolved, so related firms (e.g. "Shelly Company" vs "Shelly & Sands") are shown separately.