| Item | Quantity | R1Kt Holden Construction LLC | R2Great Lakes Construction CO | R3Eagle Bridge CO | R4Sunesis Construction CO | R5John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|
| 203E20001 EMBANKMENT, AS PER PLAN | 6,524 CY | $48.70 | $80.00 | $67.00 | $123 | $53.52 | 19% |
| 840E20001 MECHANICALLY STABILIZED EARTH WALL, AS PER PLAN | 3,988 SF | $71.00 | $50.00 | $60.00 | $69.02 | $71.99 | 17% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $182,250 | $150,000 | $210,000 | $146,311 | $375,000 | 11% |
| 203E20000 EMBANKMENT | 3,885 CY | $30.00 | $24.00 | $35.00 | $41.13 | $45.07 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $108,385 | $114,000 | $110,000 | $86,293 | $140,000 | 6% |
| 867E00101 TEMPORARY WIRE FACED MECHANICALLY STABILIZED EARTH |
| Item | Quantity | R1Kt Holden Construction LLC | R2Great Lakes Construction CO | R3Eagle Bridge CO | R4Sunesis Construction CO | R5John R Jurgensen Company |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $15,000 | $10,000 | $12,500 | $6,730 | $7,369 |
| 202E20010 HEADWALL REMOVED | 2 EACH | $800 | $235 | $1,000 | $302 | $1,425 |
| 202E23000 PAVEMENT REMOVED | 53 SY | $73.50 | $55.00 | $85.00 | $63.20 | $78.86 |
| 202E30000 WALK REMOVED | 377 SF | $4.75 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $102,515 |
| $90,000 |
| $80,000 |
| $125,871 |
| $95,384 |
| 6% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 320 CY | $262 | $298 | $298 | $255 | $320 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $69,250 | $121,000 | $75,000 | $15,251 | $249,802 | 4% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $57,100 | $11,000 | $25,000 | $13,785 | $55,000 | 3% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 255 SY | $190 | $110 | $120 | $177 | $120 | 3% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $46,100 | $7,500 | $30,000 | $18,205 | $15,000 | 3% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 558 CY | $75.00 | $80.00 | $90.00 | $85.27 | $95.76 | 2% |
| 840E26000 CONCRETE COPING | 159 FT | $240 | $275 | $230 | $240 | $562 | 2% |
| 202E22900 APPROACH SLAB REMOVED | 396 SY | $88.00 | $70.00 | $45.00 | $43.40 | $140 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $30,960 | $20,000 | $25,000 | $14,077 | $21,334 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (67 CY | $462 | $370 | $370 | $450 | $560 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 61 CY | $493 | $410 | $410 | $480 | $545 | 2% |
| 304E20000 AGGREGATE BASE | 234 CY | $103 | $110 | $110 | $124 | $122 | 1% |
| 622E41110 PORTABLE BARRIER, ANCHORED | 798 FT | $30.00 | $35.00 | $35.00 | $30.42 | $29.25 | 1% |
| 608E12000 5" CONCRETE WALK | 2,166 SF | $11.00 | $12.50 | $12.00 | $15.20 | $13.75 | 1% |
| $3.25 |
| $4.00 |
| $4.52 |
| $8.68 |
| 202E32000 CURB REMOVED | 158 FT | $11.00 | $3.75 | $10.00 | $9.29 | $16.02 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 56 FT | $38.00 | $23.50 | $20.00 | $28.75 | $49.63 |
| 202E35200 PIPE REMOVED, OVER 24" DIAMETER | 58 FT | $39.00 | $40.50 | $30.00 | $37.01 | $52.57 |
| 202E38000 GUARDRAIL REMOVED | 301 FT | $2.00 | $2.00 | $2.00 | $7.50 | $7.50 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 2 EACH | $160 | $160 | $160 | $150 | $150 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $140 | $140 | $140 | $200 | $200 |
| 202E58100 CATCH BASIN REMOVED | 4 EACH | $660 | $300 | $325 | $605 | $1,147 |
| 202E75000 FENCE REMOVED | 136 FT | $4.50 | $4.50 | $10.00 | $10.00 | $10.00 |
| 202E98000 REMOVAL MISC.: ROCK CHANNEL PROTECTION | 1 LS | $1,500 | $1,700 | $1,500 | $3,060 | $2,779 |
| 203E10000 EXCAVATION | 271 CY | $29.00 | $27.00 | $23.00 | $21.90 | $35.13 |
| 204E10000 SUBGRADE COMPACTION | 1,435 SY | $2.50 | $4.25 | $5.00 | $4.02 | $3.18 |
| 204E13000 EXCAVATION OF SUBGRADE | 180 CY | $50.00 | $55.00 | $16.00 | $39.42 | $62.07 |
| 204E45000 PROOF ROLLING | 1 HOUR | $320 | $300 | $150 | $396 | $248 |
| 204E50000 GEOTEXTILE FABRIC | 1,435 SY | $1.10 | $1.90 | $2.00 | $2.96 | $2.38 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 288 FT | $33.40 | $33.40 | $33.40 | $33.00 | $33.00 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 5 EACH | $2,000 | $1,900 | $1,750 | $1,294 | $1,493 |
| 690E98400 SPECIAL - CONSULTANT FOR CONCRETE QUALITY CONTROL | 1 LS | $6,480 | $6,500 | $7,500 | $740 | $10,582 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $21,811 | $46,500 | $70,000 | $46,158 | $52,454 |
| 616E10000 WATER | 41 MGAL | $22.50 | $50.00 | $20.00 | $4.07 | $47.54 |
| 659E00300 TOPSOIL | 109 CY | $62.50 | $75.00 | $65.00 | $68.41 | $40.66 |
| 659E10000 SEEDING AND MULCHING | 980 SY | $5.00 | $5.00 | $5.00 | $3.64 | $3.65 |
| 659E14000 REPAIR SEEDING AND MULCHING | 49 SY | $1.00 | $1.00 | $3.00 | $0.28 | $3.65 |
| 659E20000 COMMERCIAL FERTILIZER | 0.13 TON | $1,500 | $1,500 | $1,750 | $1,400 | $1,000 |
| 659E31000 LIME | 0.2 ACRE | $200 | $200 | $10.00 | $200 | $100 |
| 659E35000 WATER | 5.4 MGAL | $1.00 | $1.00 | $15.00 | $1.39 | $10.00 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 601E37500 PAVED GUTTER, TYPE 1-2 | 113 FT | $100 | $72.00 | $100 | $65.00 | $74.87 |
| 601E37501 PAVED GUTTER, TYPE 1-2, AS PER PLAN | 35 FT | $97.00 | $88.00 | $100 | $75.00 | $88.34 |
| 605E06000 4" BASE PIPE UNDERDRAINS | 285 FT | $12.00 | $15.00 | $25.00 | $18.93 | $30.27 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 40 FT | $37.00 | $18.00 | $20.00 | $29.36 | $30.23 |
| 611E04400 12" CONDUIT, TYPE B | 108 FT | $175 | $160 | $115 | $111 | $114 |
| 611E98180 CATCH BASIN, NO. 3A | 5 EACH | $3,700 | $5,400 | $3,750 | $2,840 | $2,429 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $1,890 | $3,550 | $2,150 | $1,765 | $1,829 |
| 611E98540 CATCH BASIN, NO. 2-4 | 1 EACH | $18,500 | $15,000 | $17,500 | $15,853 | $8,748 |
| 611E98644 CATCH BASIN GRATE | 1 EACH | $400 | $525 | $400 | $822 | $471 |
| 611E99574 MANHOLE, NO. 3 | 2 EACH | $9,425 | $11,250 | $8,750 | $6,657 | $11,091 |
| 611E04400 12" CONDUIT, TYPE B, 706.02 WITH PREMIUM JOINTS | 105 FT | $128 | $160 | $140 | $111 | $129 |
| 611E16400 36" CONDUIT, TYPE B, 706.02 | 4 FT | $2,700 | $1,300 | $1,000 | $2,451 | $1,677 |
| 611E16400 36" CONDUIT, TYPE B, 707.33 | 6 FT | $1,230 | $1,000 | $850 | $770 | $924 |
| 611E16400 36" CONDUIT, TYPE B, 706.02 WITH PREMIUM JOINTS | 65 FT | $332 | $340 | $350 | $649 | $407 |
| 407E20000 NON-TRACKING TACK COAT | 254 GAL | $10.27 | $3.00 | $3.00 | $10.00 | $5.50 |
| 609E26000 CURB, TYPE 6 | 591 FT | $34.00 | $48.00 | $37.00 | $33.02 | $33.86 |
| 621E00100 RPM | 47 EACH | $88.80 | $88.80 | $88.80 | $81.96 | $88.80 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 47 EACH | $18.00 | $12.50 | $15.00 | $81.96 | $27.06 |
| 625E75400 LIGHT POLE REMOVED | 1 EACH | $11,000 | $8,750 | $8,750 | $34,571 | $8,750 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, (ONE-WAY) | 3 EACH | $15.60 | $15.60 | $15.60 | $15.00 | $15.00 |
| 644E00200 LANE LINE, 4" | 0.27 MILE | $2,145 | $2,145 | $2,145 | $4,166 | $2,145 |
| 644E00300 CENTER LINE | 0.17 MILE | $10,420 | $10,420 | $10,420 | $16,000 | $10,420 |
| 644E00400 CHANNELIZING LINE, 8" | 227 FT | $2.40 | $2.40 | $2.40 | $2.50 | $2.40 |
| 644E00500 STOP LINE | 110 FT | $15.40 | $15.40 | $15.40 | $7.00 | $15.40 |
| 644E01300 LANE ARROW | 2 EACH | $150 | $150 | $150 | $200 | $150 |
| 644E01500 DOTTED LINE, 4" | 228 FT | $1.30 | $1.30 | $1.30 | $2.00 | $1.30 |
| 644E01501 DOTTED LINE, 4", AS PER PLAN | 91 FT | $1.55 | $1.55 | $1.55 | $4.00 | $1.55 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 160 HOUR | $80.00 | $105 | $135 | $110 | $121 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,898 | $1,898 | $1,898 | $1,898 | $1,898 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, (BI-DIRECTIONAL) | 23 EACH | $11.64 | $11.64 | $12.00 | $11.64 | $11.64 |
| 614E13350 OBJECT MARKER, ONE WAY | 23 EACH | $20.23 | $20.23 | $20.00 | $20.23 | $20.23 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 0.27 MILE | $2,175 | $2,175 | $2,175 | $2,500 | $2,175 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.29 MILE | $12,377 | $12,377 | $12,377 | $34,145 | $12,377 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.17 MILE | $3,780 | $3,780 | $3,780 | $7,500 | $3,780 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 0.69 MILE | $8,698 | $8,698 | $8,698 | $17,060 | $8,698 |
| 614E23010 WORK ZONE CHANNELIZING LINE, CLASS I, 12" | 377 FT | $2.87 | $2.87 | $2.87 | $1.00 | $2.87 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 120 FT | $0.95 | $0.95 | $0.95 | $2.00 | $0.95 |
| 614E24400 WORK ZONE DOTTED LINE, CLASS I, 4", 740.06, TYPE I | 980 FT | $1.23 | $1.23 | $1.23 | $1.10 | $1.23 |
| 614E24610 WORK ZONE DOTTED LINE, CLASS III, 4", 642 PAINT | 319 FT | $0.85 | $0.85 | $0.85 | $1.00 | $0.85 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 44 FT | $6.38 | $6.38 | $6.38 | $10.30 | $6.38 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 110 FT | $4.50 | $4.50 | $4.50 | $3.00 | $4.50 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 413 FT | $27.00 | $22.50 | $34.00 | $27.05 | $27.15 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $8,400 | $2,000 | $15,000 | $4,069 | $6,059 |
| 690E98400 SPECIAL - MISC.: WORK INVLOVING ASBESTOS CONTAININ | 1 LS | $420 | $250 | $150 | $500 | $4,800 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $1.00 | $15,000 | $1.00 | $341 | $12,994 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 444 SY | $25.00 | $25.00 | $25.00 | $28.00 | $28.00 |
| 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 159 FT | $132 | $136 | $132 | $193 | $193 |
| 840E21000 WALL EXCAVATION | 652 CY | $26.00 | $32.00 | $20.00 | $26.54 | $49.52 |
| 840E22001 FOUNDATION PREPARATION, AS PER PLAN | 336 SY | $54.00 | $60.00 | $65.00 | $81.76 | $66.71 |
| 840E25010 6" DRAINAGE PIPE, PERFORATED | 323 FT | $9.60 | $9.00 | $12.00 | $6.48 | $41.85 |
| 840E25020 6" DRAINAGE PIPE, NON-PERFORATED | 2.5 FT | $142 | $100 | $25.00 | $115 | $256 |
| 840E26050 AESTHETIC SURFACE TREATMENT | 3,988 SF | $1.00 | $10.25 | $3.00 | $0.02 | $1.34 |
| 840E27000 ON-SITE ASSISTANCE | 5 DAY | $1,000 | $250 | $750 | $1,227 | $537 |
| 203E65000 SPECIAL - SETTLEMENT PLATFORM | 3 EACH | $2,970 | $1,750 | $2,000 | $1,552 | $3,186 |
| 512E10001 SEALING OF CONCRETE SURFACES, AS PER PLAN | 444 SY | $25.00 | $25.00 | $25.00 | $20.00 | $20.00 |
| 202E23500 WEARING COURSE REMOVED | 396 SY | $6.40 | $12.00 | $20.00 | $6.23 | $25.00 |
| 202E38501 BRIDGE RAILING REMOVED, AS PER PLAN | 286 FT | $39.00 | $12.00 | $25.00 | $13.93 | $25.00 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 355 SY | $15.00 | $15.00 | $15.00 | $12.00 | $12.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 71 SY | $36.50 | $36.50 | $36.50 | $30.00 | $30.00 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 8 SF | $9.00 | $15.00 | $7.00 | $7.30 | $40.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,300 | $20,000 | $20,000 | $10,800 | $10,332 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E20001 EMBANKMENT, AS PER PLAN | 6,524 CY | $48.7 | $318k | 14% |
| 840E20001 MECHANICALLY STABILIZED EARTH WALL, AS PER PLAN | 3,988 SF | $71 | $283k | 13% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $182,250 | $182k | 8% |
| 203E20000 EMBANKMENT | 3,885 CY | $30 | $117k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $108,385 | $108k | 5% |
| 867E00101 TEMPORARY WIRE FACED MECHANICALLY STABILIZED EARTH | 1 LS | $102,515 | $103k | 5% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 320 CY | $261.84 | $84k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $69,250 | $69k | 3% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $57,100 | $57k | 3% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 255 SY | $190 | $48k | 2% |