Ohio DOT · bid history
| Result | Project | County | Let | Their bid | Winning bid |
|---|---|---|---|---|---|
| Rank 2of 4 | CUY-IR 480-16.56 SlideEarthwork | CUY | Apr 2026 | $861k | $803k |
| Wonof 3 | CLE-IR 275 Rest Areas TPPavement | CLE | Apr 2026 | $7.51M | $7.51M |
| Wonof 3 | MED-IR 71 Rest Areas TPPavement | MED | Apr 2026 | $5.04M | $5.04M |
| Rank 3of 3 | SUM-SR 91-07.89Bridge | SUM | Mar 2026 | $2.64M | $2.19M |
| Rank 4of 10 | WYA-US 30 Rest Areas TPPavement | WYA | Mar 2026 | $3.55M | $3.39M |
| Rank 5of 5 | AUG-US 33/Willipie St Infield TPPavement | AUG | Mar 2026 | $3.31M | $2.41M |
| Rank 2of 4 | D12-BH FY2026 OverlayBridge | D12 | Feb 2026 | $2.36M | $1.84M |
| Rank 4of 4 | SUM-IR 277-03.73Bridge | SUM | Feb 2026 | $16.5M | $15.4M |
| Rank 3of 3 | CUY-IR 71-10.07 SW ReplaceBridge | CUY | Jan 2026 | $13.3M | $11.0M |
| Rank 5of 9 | CUY-IR 480-13.04 RampsPavement | CUY | Jan 2026 | $2.27M | $1.87M |
| Rank 4of 7 | TRU-IR 80-11.32 Truck ParkingPavement | TRU | Jan 2026 | $4.91M | $4.72M |
| Wonof 5 | CUY-IR 77-15.46/VAR DecksBridge | CUY | Dec 2025 | $25.3M | $25.3M |
| Wonof 3 | CUY-IR 480-00.74/VAR Noise WallSafety | CUY | Nov 2025 | $2.91M | $2.91M |
| Rank 3of 3 | LAK-US 6-02.06 SuperBridge | LAK | Oct 2025 | $7.48M | $7.00M |
| Wonof 3 | HAM-IR 75-01.05Pavement | HAM | Oct 2025 | $46.8M | $46.8M |
| Wonof 4 | MED-IR 271-05.64Earthwork | MED | Jul 2025 | $449k | $449k |
| Wonof 2 | SUM-SR 82-00.00Bridge | SUM | Jul 2025 | $7.74M | $7.74M |
| Rank 4of 4 | MED-US 42-03.10 L Reconstr.Bridge | MED | Jun 2025 | $1.14M | $875k |
| Rank 2of 5 | HAM-SR 264-10.42Other | HAM | May 2025 | $2.29M | $2.21M |
| Wonof 3 | D12-Noise Barrier RepairSafety | D12 | May 2025 | $648k | $648k |
| Rank 7of 10 | OTT-SR 163-24.22 PC Shore RevtmtEarthwork | OTT | Apr 2025 | $4.15M | $3.39M |
| Wonof 2 | LAK-IR 90-02.93 SlopeEarthwork | LAK | Mar 2025 | $4.71M | $4.71M |
| Wonof 2 | CUY-SR 14-06.93 ReplaceBridge | CUY | Mar 2025 | $48.4M | $48.4M |
| Rank 4of 6 | CUY-IR 90-19.77/VAR RampsPavement | CUY | Feb 2025 | $3.50M | $2.59M |
| Rank 3of 3 | RIC-IR 71-15.76Earthwork | RIC | Jan 2025 | $1.63M | $1.56M |
| Wonof 2 | LAK-US 20-19.59 Major RehabPavement | LAK | Jan 2025 | $56.6M | $56.6M |
| Rank 3of 4 | HAM-IR 71-01.81Bridge | HAM | Jan 2025 | $14.3M | $12.9M |
| Rank 5of 9 | HAM-US 52-36.85Earthwork | HAM | Jan 2025 | $2.19M | $1.93M |
| Rank 2of 2 | CUY-SR 237-06.95 SuperBridge | CUY | Dec 2024 | $7.29M | $6.78M |
| Rank 2of 2 | CUY-SR 14-12.12E (PART 1 AND PART 2)Bridge | CUY | Nov 2024 | $5.28M | $4.86M |
| Wonof 1 | CUY-SR 176-13.34/VAR DeckBridge | CUY | Nov 2024 | $7.47M | $7.47M |
| Wonof 3 | LOR-SR 83-10.79Bridge | LOR | Oct 2024 | $4.16M | $4.16M |
| Wonof 2 | CUY-IR 480-17.87WN/17.90ES DecksBridge | CUY | Oct 2024 | $9.23M | $9.23M |
| Rank 2of 5 | SUM-IR 77-09.75Safety | SUM | Sep 2024 | $7.19M | $6.83M |
| Rank 4of 5 | CUY-IR 77-04.79/Wallings RoadPavement | CUY | Sep 2024 | $8.63M | $8.04M |
| Rank 4of 7 | MAH-IR 680-09.30 Noise WallsSafety | MAH | Sep 2024 | $4.38M | $3.98M |
| Rank 4of 4 | TUS-SR 259-00.10Bridge | TUS | Aug 2024 | $2.41M | $2.04M |
| Rank 3of 5 | HAM-IR 74-13.35Bridge | HAM | Aug 2024 | $5.75M | $5.39M |
| Rank 5of 5 | LAK-US 6-04.61 SuperBridge | LAK | Aug 2024 | $5.17M | $4.08M |
| Rank 3of 5 | LOR-SR 2-(00.97) (07.42)Bridge | LOR | Aug 2024 | $945k | $698k |
| Wonof 2 | CUY-IR 271-08.45 BarrierSafety | CUY | Jul 2024 | $1.06M | $1.06M |
| Wonof 6 | ERI-SR 4-00.45 GSMEarthwork | ERI | Jul 2024 | $529k | $529k |
| Rank 4of 4 | LAK-SR 91-04.23/04.49Bridge | LAK | May 2024 | $18.9M | $15.5M |
| Wonof 2 | CUY-IR 480-22.86 Noise BarrierSafety | CUY | May 2024 | $1.22M | $1.22M |
| Wonof 2 | HAM-IR 75-07.85Bridge | HAM | May 2024 | $46.8M | $46.8M |
| Rank 3of 3 | CUY-Eagle Avenue BridgeBridge | CUY | May 2024 | $5.36M | $2.47M |
| Rank 2of 3 | CUY-IR 490-00.00 Major Rehab (PART 1 AND PART 2)Pavement | CUY | Apr 2024 | $66.1M | $61.9M |
| Rank 3of 6 | STA-SR 225-02.65 SlideEarthwork | STA | Feb 2024 | $588k | $339k |
| Wonof 3 | LAK-US 20-24.99 Major RehabPavement | LAK | Jan 2024 | $24.8M | $24.8M |
| Rank 4of 5 | MAH-SR 11-13.30 Noise WallSafety | MAH | Jan 2024 | $2.11M | $1.98M |
| Rank 2of 7 | MAH-IR 76-03.03 Noise WallSafety | MAH | Nov 2023 | $1.23M | $1.15M |
| Rank 2of 2 | CUY-IR 71-18.48 DeckBridge | CUY | Nov 2023 | $2.22M | $1.87M |
| Rank 5of 7 | LAK-IR 90-05.57 SlideEarthwork | LAK | Nov 2023 | $1.37M | $1.09M |
| Rank 2of 3 | LAK-SR 2-16.77 SuperBridge | LAK | Oct 2023 | $2.55M | $2.40M |
| Rank 3of 5 | SUM-IR 271-01.51Bridge | SUM | Sep 2023 | $1.98M | $1.73M |
| Rank 5of 5 | MED-SR 18-01.72/01.93/02.42Bridge | MED | Aug 2023 | $5.30M | $4.02M |
| Wonof 3 | CUY-IR 480-02.03/02.83 OverlayBridge | CUY | Jul 2023 | $1.52M | $1.52M |
| Wonof 2 | HAM-SR 562-00.54Bridge | HAM | Jun 2023 | $21.4M | $21.4M |
| Rank 2of 7 | ATB-SR 531-13.50/15.85Earthwork | ATB | May 2023 | $5.16M | $4.95M |
| Wonof 1 | CUY-BH FY2023 MiscBridge | CUY | Apr 2023 | $8.76M | $8.76M |
| Rank 3of 4 | CUY-SR 17-12.16 Major RehabPavement | CUY | Mar 2023 | $3.65M | $2.84M |
| Rank 5of 5 | POR-IR 76-20.05 SlideEarthwork | POR | Jan 2023 | $3.60M | $2.45M |
| Rank 3of 3 | LAK-US 20-17.23 DeckBridge | LAK | Jan 2023 | $2.83M | $2.32M |
| Wonof 3 | D12-BH FY2022 OverlayBridge | D12 | Dec 2022 | $3.93M | $3.93M |
| Rank 6of 7 | SUM-IR 77-22.30Bridge | SUM | Dec 2022 | $16.8M | $13.4M |
| Rank 2of 2 | CUY-IR 480-07.14 WB SafetySafety | CUY | Nov 2022 | $12.7M | $12.0M |
| Rank 4of 4 | LAK-SR 615-04.03 DeckBridge | LAK | Nov 2022 | $8.54M | $6.91M |
| Wonof 4 | CUY-IR 480-20.33/VAR Noise WallSafety | CUY | Oct 2022 | $1.43M | $1.43M |
| Rank 6of 7 | CUY-IR 77-00.42 Interchange (PART 1 AND PART 2)Pavement | CUY | Oct 2022 | $35.0M | $31.6M |
| Rank 4of 5 | MED-SR 252-03.95Bridge | MED | Oct 2022 | $2.97M | $2.12M |
| Wonof 10 | CUY-US 422-18.74/VAR SlideEarthwork | CUY | Sep 2022 | $846k | $846k |
| Rank 3of 3 | HAM-US 42-03.29Bridge | HAM | Aug 2022 | $2.72M | $1.63M |
| Rank 3of 3 | LUC-IR 475/US 23-10.02/11.17 NsewllSafety | LUC | Aug 2022 | $7.21M | $6.50M |
| Rank 4of 4 | CUY-IR 480-22.41 DeckBridge | CUY | Jul 2022 | $11.6M | $10.2M |
| Wonof 1 | MED-SR 3-17.05Drainage | MED | May 2022 | $1.07M | $1.07M |
| Wonof 3 | CUY-IR 77-08.37 NB Ramps SafetySafety | CUY | Apr 2022 | $4.15M | $4.15M |
| Rank 2of 6 | ERI-SR 113-05.85 GSMEarthwork | ERI | Mar 2022 | $735k | $660k |
| Rank 4of 6 | CUY-IR 71-05.71 BarrierSafety | CUY | Mar 2022 | $9.09M | $8.53M |
| Wonof 9 | STA-US 62-24.14Pavement | STA | Dec 2021 | $13.7M | $13.7M |
| Wonof 3 | CUY-Main Avenue Connector TLCIMaintenance | CUY | Dec 2021 | $423k | $423k |
| Wonof 5 | CLA-US 68-05.76Bridge | CLA | Nov 2021 | $1.27M | $1.27M |
| Wonof 5 | CLA-US 42/US 68-04.62/15.16Bridge | CLA | Nov 2021 | $1.19M | $1.19M |
| Rank 2of 7 | LIC-IR 70-01.90Safety | LIC | Nov 2021 | $777k | $743k |
| Rank 2of 4 | BUT-SR 122-06.06/06.26Bridge | BUT | Nov 2021 | $3.39M | $3.01M |
| Rank 2of 6 | STA-US 62T/SR 225-01.37/00.59 (PART 1, 2, 3)Bridge | STA | Oct 2021 | $8.56M | $8.20M |
| Rank 6of 6 | CUY-SR 21-09.09 DeckBridge | CUY | Oct 2021 | $5.37M | $4.55M |
| Rank 5of 10 | CLA-SR 72-08.63Bridge | CLA | Oct 2021 | $1000k | $899k |
| Rank 5of 8 | POR-SR 14-12.96Bridge | POR | Oct 2021 | $3.23M | $3.00M |
| Rank 3of 8 | POR-IR 76-16.58/21.18Bridge | POR | Oct 2021 | $2.91M | $2.70M |
| Rank 4of 8 | BRO-SR 221-05.47Bridge | BRO | Oct 2021 | $3.77M | $3.44M |
| Rank 2of 4 | HAM-IR 75-16.97Bridge | HAM | Oct 2021 | $2.01M | $1.93M |
| Rank 3of 6 | BUT-SR 732-03.04Bridge | BUT | Sep 2021 | $1.21M | $1.19M |
| Rank 2of 6 | CUY-IR 480-01.10 Noise BarrierSafety | CUY | Sep 2021 | $2.55M | $2.53M |
| Rank 5of 10 | HOL-SR 520-11.80/12.91Earthwork | HOL | Sep 2021 | $1.44M | $1.24M |
| Rank 3of 3 | CUY-IR 71-16.40/VAR RepairBridge | CUY | Sep 2021 | $3.67M | $2.69M |
| Wonof 6 | HAM-IR 71-06.75/07.31Bridge | HAM | Sep 2021 | $679k | $679k |
| Rank 4of 10 | GUE-US 22-14.57Earthwork | GUE | Sep 2021 | $477k | $383k |
| Rank 3of 8 | MOT-IR 75-23.71Other | MOT | Aug 2021 | $430k | $368k |
| Rank 3of 4 | CUY-East 75th St BridgeBridge | CUY | Aug 2021 | $6.65M | $6.18M |
| Rank 9of 10 | MED-SR 57-17.65Drainage | MED | Aug 2021 | $1.68M | $1.24M |
| Wonof 3 | HAM-IR 74-18.01Pavement | HAM | Jul 2021 | $84.9M | $84.9M |
| Rank 4of 6 | ASD-US 30-00.11Signals | ASD | Jul 2021 | $3.83M | $3.47M |
| Rank 2of 4 | CUY-BH FY2021(B) MiscBridge | CUY | Jul 2021 | $9.27M | $8.67M |
| Rank 4of 6 | MIA-IR 75-19.01 L/RBridge | MIA | Jun 2021 | $6.68M | $5.96M |
| Rank 7of 7 | FRA-SR 315-07.13 Noise Wall Part 1&2Safety | FRA | Jun 2021 | $4.28M | $3.40M |
| Rank 4of 6 | LOR-SR 252-01.90Earthwork | LOR | May 2021 | $150k | $92k |
| Rank 5of 7 | BEL-IR 470-03.22Bridge | BEL | May 2021 | $1.92M | $1.80M |
| Rank 5of 7 | SUM-IR 77/277/US 224 VariousPavement | SUM | May 2021 | $58.4M | $49.7M |
| Rank 2of 2 | CUY-IR 480-21.30 WB SafetySafety | CUY | May 2021 | $3.56M | $3.30M |
| Rank 3of 5 | LAK-SR 306-05.18 DeckBridge | LAK | Apr 2021 | $4.65M | $4.22M |
| Rank 10of 10 | CUY-IR 480-22.41 SubdeckBridge | CUY | Mar 2021 | $266k | $164k |
| Rank 2of 3 | CUY-Center Street Swing BridgeBridge | CUY | Mar 2021 | $5.35M | $4.82M |
| Wonof 3 | D12-Noise Barrier RepairSafety | D12 | Feb 2021 | $543k | $543k |
| Rank 2of 8 | MED-SR 18-12.99 (PART 1 AND PART 2)Pavement | MED | Feb 2021 | $23.8M | $22.8M |
| Rank 5of 5 | CUY-IR 90-14.52 DeckBridge | CUY | Feb 2021 | $3.82M | $3.00M |
| Rank 6of 8 | MOT-IR 70-16.25Maintenance | MOT | Jan 2021 | $943k | $771k |
| Rank 9of 10 | POR-D04 POR IR-76 RA Parking LotsSafety | POR | Jan 2021 | $3.74M | $3.23M |
| Rank 7of 8 | GEA-US 422-12.26 DeckBridge | GEA | Jan 2021 | $2.81M | $2.47M |
| Wonof 8 | HAM-IR 275-34.70Earthwork | HAM | Jan 2021 | $645k | $645k |
| Wonof 6 | CLE-IR 275-07.71Earthwork | CLE | Jan 2021 | $839k | $839k |
| Wonof 5 | BUT-SR 4-15.80Bridge | BUT | Jan 2021 | $2.82M | $2.82M |
| Rank 3of 9 | LOR-IR 90-17.85Bridge | LOR | Jan 2021 | $9.50M | $9.15M |
| Wonof 4 | LAK-SR 2-01.05 L&RBridge | LAK | Jan 2021 | $9.79M | $9.79M |
| Rank 4of 5 | HAM-US 50-22.30/22.38Bridge | HAM | Dec 2020 | $2.34M | $1.82M |
| Rank 2of 9 | HAM-IR 275-04.06Earthwork | HAM | Dec 2020 | $669k | $662k |
| Rank 4of 5 | HAM-LMST Beechmont Bridge (PART 1 AND PART 2)Bridge | HAM | Dec 2020 | $9.01M | $7.91M |
| Rank 5of 7 | LAK-IR 271-01.27 DeckBridge | LAK | Dec 2020 | $2.52M | $2.01M |
| Rank 9of 9 | MAR-US 23-01.85/02.04Bridge | MAR | Oct 2020 | $6.97M | $5.64M |
| Rank 5of 6 | BUT-SR 122D-00.59LBridge | BUT | Oct 2020 | $794k | $622k |
| Wonof 4 | MED-SR 3-15.05Pavement | MED | Oct 2020 | $7.90M | $7.90M |
| Wonof 6 | LUC-IR 475/US 23-09.54/09.63 NoisewallSafety | LUC | Sep 2020 | $6.61M | $6.61M |
| Wonof 10 | CUY-IR 480-20.12 EB SlideEarthwork | CUY | Jul 2020 | $196k | $196k |
| Wonof 3 | HAM-IR 74-17.80Earthwork | HAM | Jul 2020 | $4.14M | $4.14M |
| Rank 2of 4 | CUY-SR 176-10.13 Major RehabPavement | CUY | Jul 2020 | $15.0M | $14.9M |
| Rank 3of 4 | GRE-US 68-09.57/13.35Bridge | GRE | Jul 2020 | $1.48M | $1.26M |
| Rank 3of 7 | MOT-IR 75-10.44/10.78Bridge | MOT | Jul 2020 | $19.7M | $17.7M |
| Rank 5of 5 | MRG-SR 376-12.87Earthwork | MRG | Jun 2020 | $1.66M | $1.17M |
| Rank 6of 8 | BEL-SR 9-11.72Earthwork | BEL | Jun 2020 | $586k | $395k |
| Wonof 4 | PUT-SR 108-01.68Bridge | PUT | Jun 2020 | $1.04M | $1.04M |
| Rank 2of 5 | CUY-IR 480N-00.00 BarrierSafety | CUY | Jun 2020 | $1.24M | $1.22M |
| Wonof 3 | CUY-IR 90-13.45 SuperstructureBridge | CUY | May 2020 | $4.36M | $4.36M |
| Rank 4of 5 | MRG-SR 60-21.42Earthwork | MRG | Apr 2020 | $612k | $528k |
| Rank 4of 4 | STA-SR 21-21.30Bridge | STA | Apr 2020 | $1.44M | $1.19M |
| Rank 2of 4 | CUY-IR 271-10.24 Noise BarrierSafety | CUY | Apr 2020 | $1.45M | $1.37M |
| Wonof 5 | CUY-BH FY2020 Wearing SurfaceBridge | CUY | Mar 2020 | $927k | $927k |
| Rank 9of 10 | MED-SR 303-13.90/14.96Bridge | MED | Feb 2020 | $1.74M | $1.39M |
| Wonof 2 | HAM-IR 75-16.42RBridge | HAM | Feb 2020 | $1.48M | $1.48M |
| Rank 2of 3 | CUY-IR 71-18.29 CCG7APavement | CUY | Feb 2020 | $5.42M | $4.35M |
| Rank 3of 4 | D04-BH FY2020 (West)Bridge | D04 | Feb 2020 | $1.98M | $1.86M |
| Rank 3of 4 | BUT-IR 75-05.35Bridge | BUT | Feb 2020 | $2.26M | $2.01M |
| Rank 8of 8 | ATB-US 20/SR 45-19.13/08.28Bridge | ATB | Feb 2020 | $1.91M | $1.29M |
| Rank 5of 6 | MER-US 127-22.89Bridge | MER | Dec 2018 | $281k | $219k |
| Rank 6of 8 | HAM-IR 71-08.03Maintenance | HAM | Nov 2018 | $520k | $359k |
| Rank 5of 5 | MIA-IR 75-14.15/14.57Bridge | MIA | Nov 2018 | $11.5M | $9.57M |
| Rank 3of 7 | HOC-US 33-09.22 L&RBridge | HOC | Nov 2018 | $986k | $895k |
| Rank 7of 7 | TUS-IR 77-05.27Bridge | TUS | Oct 2018 | $7.40M | $6.17M |
| Rank 3of 5 | MOT-US 35-15.13 SBridge | MOT | Oct 2018 | $1.65M | $1.56M |
| Wonof 7 | DEF-SR 15-14.77Bridge | DEF | Oct 2018 | $11.0M | $11.0M |
| Rank 9of 9 | BRO-CR 13-03.30Bridge | BRO | Oct 2018 | $2.67M | $1.83M |
| Rank 5of 5 | BUT-/HAM Culverts FY19Drainage | BUT | Sep 2018 | $978k | $658k |
| Rank 6of 9 | ASD-SR 95-01.20Bridge | ASD | Sep 2018 | $1.17M | $955k |
| Rank 6of 7 | BEL-SR 9-00.21Earthwork | BEL | Sep 2018 | $969k | $635k |
| Rank 5of 7 | MOE-SR 556-04.15Earthwork | MOE | Sep 2018 | $654k | $533k |
| Rank 3of 6 | CUY-IR 77-12.12Bridge | CUY | Sep 2018 | $6.42M | $6.07M |
| Rank 7of 7 | BEL-US 250-07.40Earthwork | BEL | Aug 2018 | $681k | $474k |
| Rank 4of 4 | GEA-SR 168-01.21 SlideEarthwork | GEA | Aug 2018 | $428k | $218k |
| Rank 3of 5 | LOR-IR 90-11.78Bridge | LOR | Aug 2018 | $2.70M | $2.24M |
| Wonof 4 | LAK-VROOMAN ROAD (PART 1 AND PART 2)Pavement | LAK | Jul 2018 | $22.4M | $22.4M |
| Rank 3of 3 | ATH-US 33-15.60Bridge | ATH | Jun 2018 | $2.28M | $1.53M |
| Rank 3of 3 | HAM-IR 75-03.84Pavement | HAM | Jun 2018 | $107.0M | $86.9M |
| Rank 3of 6 | MOE-SR 536-08.50Earthwork | MOE | Jun 2018 | $441k | $386k |
| Rank 2of 4 | MOE-CR 81-02.87Earthwork | MOE | May 2018 | $309k | $274k |
| Rank 5of 7 | MED-N Carpenter RoadPavement | MED | May 2018 | $15.0M | $11.4M |
| Rank 3of 4 | FRA-IR 71-18.64 Noise WallsSafety | FRA | Apr 2018 | $1.56M | $1.24M |
| Rank 2of 3 | CUY-IR 480-25.03Bridge | CUY | Apr 2018 | $1.71M | $1.25M |
| Rank 2of 3 | CUY-IR 71-17.95LBridge | CUY | Mar 2018 | $3.35M | $3.05M |
| Wonof 5 | HAM-IR 275-39.81Bridge | HAM | Mar 2018 | $31.0M | $31.0M |
| Rank 6of 6 | MIA-US 36-11.34Bridge | MIA | Feb 2018 | $2.00M | $1.68M |
| Wonof 5 | CUY-IR 480/Transportation BlvdPavement | CUY | Feb 2018 | $4.81M | $4.81M |
| Rank 5of 8 | LAK-SR 2-14.28Bridge | LAK | Feb 2018 | $1.67M | $1.41M |
| Rank 3of 4 | CUY-IR 480-22.41 EBPavement | CUY | Feb 2018 | $7.65M | $6.95M |
| Rank 6of 8 | CUY-Detroit Ave Streetscape IIMaintenance | CUY | Jan 2018 | $1.79M | $1.35M |
| Wonof 7 | LOR-IR 90-19.30 Noise WallSafety | LOR | Jan 2018 | $1.32M | $1.32M |
| Rank 7of 7 | COS-SR 16/SR 541-08.99/19.10Pavement | COS | Jan 2018 | $20.0M | $18.9M |
| Rank 6of 6 | TUS-IR 77-03.78Bridge | TUS | Jan 2018 | $5.84M | $4.56M |
Source: public.bid_results, ODOT bid tabs. Bidder strings are normalized to upper-case but not yet entity-resolved, so related firms (e.g. "Shelly Company" vs "Shelly & Sands") are shown separately.