Ohio DOT · bid history
Showing the 300 most recent of 319 bids. Stats above reflect the full history.
| Result | Project | County | Let | Their bid | Winning bid |
|---|---|---|---|---|---|
| Rank 4of 5 | MOT-Old N. Dayton Trail, Seg 2Safety | MOT | Apr 2026 | $1.29M | $1.08M |
| Rank 4of 5 | WAR-Central Greenway SUP Seg DSafety | WAR | Apr 2026 | $815k | $697k |
| Rank 2of 2 | HAM-Madeira SRTS 2023Safety | HAM | Apr 2026 | $424k | $394k |
| Rank 2of 3 | CLE-IR 275 Rest Areas TPPavement | CLE | Apr 2026 | $7.74M | $7.51M |
| Wonof 2 | ROS-US 23/SR 159 Interchange TPPavement | ROS | Apr 2026 | $3.40M | $3.40M |
| Rank 2of 3 | CLE-SR 32-09.80 Herold RdSignals | CLE | Apr 2026 | $763k | $763k |
| Rank 3of 3 | WAR-SR 123-16.79Pavement | WAR | Apr 2026 | $943k | $818k |
| Rank 4of 4 | ATH-Nelsonville Mobility CorridorSafety | ATH | Apr 2026 | $846k | $656k |
| Rank 2of 5 | CLE-US 50-02.25Bridge | CLE | Mar 2026 | $662k | $655k |
| Wonof 4 | HAM-CR 196-01.89 Delhi AveSignals | HAM | Mar 2026 | $1.53M | $1.53M |
| Wonof 4 | HAM-CR 158/CR 460-02.04/00.54Signals | HAM | Mar 2026 | $2.41M | $2.41M |
| Rank 2of 3 | D08-Noise Walls FY2026Safety | D08 | Mar 2026 | $3.77M | $3.19M |
| Rank 3of 4 | HAM-CR 358-00.94 Clough & NewtownSignals | HAM | Mar 2026 | $1.65M | $1.60M |
| Rank 5of 7 | SCI-SR 125-06.26Bridge | SCI | Mar 2026 | $2.10M | $1.97M |
| Wonof 5 | HAM-CR 299-05.78 Loveland MadeiraSafety | HAM | Mar 2026 | $1.80M | $1.80M |
| Rank 3of 4 | BRO-CR 62-00.42Bridge | BRO | Feb 2026 | $2.00M | $1.71M |
| Rank 3of 4 | MOT-GMR Trail IMP CR22ASafety | MOT | Feb 2026 | $384k | $323k |
| Rank 3of 4 | CLI-SR 133-02.11Bridge | CLI | Feb 2026 | $1.38M | $1.17M |
| Rank 5of 6 | PRE-MR 112-00.99 N Maple Ph 2Pavement | PRE | Jan 2026 | $3.41M | $2.44M |
| Rank 7of 7 | ATH-SR 13-13.71Earthwork | ATH | Jan 2026 | $2.05M | $886k |
| Rank 2of 3 | MOT-/MIA-NW-FY26Safety | MOT | Jan 2026 | $1.38M | $1.15M |
| Rank 3of 4 | HAM-CR 14-03.49 Dry Fork RdPavement | HAM | Dec 2025 | $9.16M | $8.26M |
| Rank 2of 7 | MIA-SR 571-IMP 06.38Safety | MIA | Dec 2025 | $1.74M | $1.49M |
| Rank 6of 7 | JAC-SR 139-06.82Drainage | JAC | Nov 2025 | $487k | $369k |
| Rank 6of 8 | HIG-SR 73-00.26Bridge | HIG | Nov 2025 | $2.31M | $1.74M |
| Rank 7of 10 | CLE-Culverts FY26Drainage | CLE | Nov 2025 | $429k | $294k |
| Rank 3of 7 | ROS-SR 138-17.28Bridge | ROS | Nov 2025 | $2.70M | $2.46M |
| Rank 5of 5 | BRO-US 62-27.42Drainage | BRO | Oct 2025 | $1.45M | $984k |
| Rank 2of 3 | HAM-IR 75-01.05Pavement | HAM | Oct 2025 | $48.2M | $46.8M |
| Rank 4of 5 | HIG-SR 753-13.03Bridge | HIG | Oct 2025 | $2.17M | $2.06M |
| Rank 6of 7 | ROS-US 35-23.67Earthwork | ROS | Oct 2025 | $783k | $590k |
| Rank 6of 6 | BRO-SR 131-00.07Drainage | BRO | Sep 2025 | $993k | $765k |
| Rank 4of 4 | BUT-SR 122-06.50RDrainage | BUT | Sep 2025 | $1.44M | $1.09M |
| Wonof 10 | PIC-SR 56-20.77Earthwork | PIC | Sep 2025 | $469k | $469k |
| Rank 3of 5 | HAM-CR 270-02.96 Miami AvePavement | HAM | Sep 2025 | $5.77M | $5.46M |
| Rank 3of 3 | CLE-SR 48/SR 132-06.62/17.76Bridge | CLE | Aug 2025 | $1.28M | $1.14M |
| Wonof 3 | CLA-/MOT CR/BH FY26Drainage | CLA | Jul 2025 | $366k | $366k |
| Wonof 2 | HAM-US 127-11.88Drainage | HAM | Jul 2025 | $770k | $770k |
| Wonof 4 | CLI-SR 28-16.91Bridge | CLI | Jul 2025 | $463k | $463k |
| Wonof 4 | HAM-IR 74-11.25Maintenance | HAM | Jun 2025 | $429k | $429k |
| Rank 4of 5 | HAM-SR 264-10.42Other | HAM | May 2025 | $2.59M | $2.21M |
| Rank 4of 5 | HAM-WW to Glenwood Gardens TrailSafety | HAM | May 2025 | $7.82M | $6.76M |
| Rank 2of 2 | HAM-IR 75-08.91Pavement | HAM | May 2025 | $88.4M | $86.9M |
| Rank 3of 4 | CLE-US 50/SR 28-00.83/00.00Maintenance | CLE | May 2025 | $1.45M | $1.32M |
| Rank 3of 3 | CLE-IR 275-00.43Bridge | CLE | May 2025 | $3.47M | $3.03M |
| Rank 2of 3 | HAM-CR 91-01.05 Poole Rd SidewalkSafety | HAM | May 2025 | $534k | $495k |
| Rank 2of 2 | HAM-CR 96-05.25 Springdale RoadSafety | HAM | May 2025 | $1.28M | $1.05M |
| Rank 5of 6 | PRE-SR 725-13.60Drainage | PRE | Apr 2025 | $1.09M | $931k |
| Rank 5of 5 | BUT-SR 126-02.92Earthwork | BUT | Apr 2025 | $7.18M | $5.16M |
| Rank 2of 2 | MOT-IR 75-18.32 Bridge HitBridge | MOT | Apr 2025 | $1.55M | $1.00M |
| Rank 5of 5 | PIK-SR 32-25.87 (Safety)Signals | PIK | Mar 2025 | $3.07M | $2.65M |
| Rank 3of 6 | HAM-IR 71-08.24 Ramp TMaintenance | HAM | Mar 2025 | $615k | $508k |
| Rank 3of 3 | WAR-S River & S Main NSSignals | WAR | Feb 2025 | $802k | $624k |
| Rank 5of 5 | WAR-US 42-20.23Signals | WAR | Feb 2025 | $1.48M | $1.29M |
| Rank 6of 7 | MOT-Sycamore Creek Bridge ReplacBridge | MOT | Feb 2025 | $660k | $474k |
| Rank 5of 6 | PIK-SR 220-05.50SRDrainage | PIK | Feb 2025 | $817k | $554k |
| Rank 2of 3 | ROS-SR 159-00.41Pavement | ROS | Feb 2025 | $20.0M | $19.3M |
| Rank 5of 6 | HOC-SR 56-05.69/HOC-SR 180-02.33Bridge | HOC | Feb 2025 | $2.31M | $1.69M |
| Rank 3of 3 | D08-Bridge Maintenance FY2025Bridge | D08 | Jan 2025 | $1.78M | $1.57M |
| Rank 5of 7 | MOT-Woodman Dr ReconstructionPavement | MOT | Jan 2025 | $5.64M | $4.75M |
| Rank 4of 4 | GRE-IR 71/SR 72-01.50/00.29Bridge | GRE | Jan 2025 | $3.15M | $2.79M |
| Rank 9of 9 | HAM-US 52-36.85Earthwork | HAM | Jan 2025 | $2.81M | $1.93M |
| Rank 2of 4 | HAM-IR 71-01.81Bridge | HAM | Jan 2025 | $13.0M | $12.9M |
| Rank 2of 3 | PRE-/BUT Culverts FY25Drainage | PRE | Dec 2024 | $1.06M | $962k |
| Wonof 3 | HAM-Inverts FY2025Drainage | HAM | Dec 2024 | $2.03M | $2.03M |
| Rank 5of 7 | WAR-SR 350-08.73Bridge | WAR | Dec 2024 | $4.61M | $4.04M |
| Rank 6of 7 | BUT-SR 122-02.70Signals | BUT | Dec 2024 | $2.00M | $1.78M |
| Rank 4of 7 | HOC-US 33-10.12Drainage | HOC | Nov 2024 | $458k | $394k |
| Rank 5of 5 | HAM-Culverts FY25Drainage | HAM | Nov 2024 | $928k | $442k |
| Rank 5of 10 | CLA-US 42-08.20Bridge | CLA | Nov 2024 | $1.04M | $939k |
| Wonof 4 | HAM-CR 358-04.36Maintenance | HAM | Oct 2024 | $220k | $220k |
| Rank 4of 4 | BUT-SR 4/SR 129-09.30/02.30Drainage | BUT | Oct 2024 | $480k | $271k |
| Rank 4of 6 | CLE-Culverts FY25Drainage | CLE | Sep 2024 | $1.02M | $656k |
| Rank 6of 6 | FRA-SR 161-15.80 Noise AbatementSafety | FRA | Sep 2024 | $9.15M | $7.94M |
| Rank 2of 4 | GRE-SR 72-07.71Bridge | GRE | Sep 2024 | $2.82M | $2.47M |
| Rank 3of 4 | GRE-US 35-14.64Pavement | GRE | Aug 2024 | $3.03M | $2.25M |
| Rank 2of 5 | HAM-IR 74-13.35Bridge | HAM | Aug 2024 | $5.44M | $5.39M |
| Wonof 7 | SCI-SR 335-10.31Bridge | SCI | Aug 2024 | $1.95M | $1.95M |
| Wonof 2 | HAM-IR 75-07.80Pavement | HAM | Jul 2024 | $1.93M | $1.93M |
| Wonof 3 | HAM-US 52-35.89Bridge | HAM | Jun 2024 | $1.46M | $1.46M |
| Rank 5of 6 | PIK-CR 57-00.62Drainage | PIK | Jun 2024 | $399k | $307k |
| Rank 2of 2 | MOT-US 40-10.81Pavement | MOT | May 2024 | $694k | $614k |
| Rank 4of 5 | MOT-Vandalia Bike-way ConnectorSafety | MOT | May 2024 | $5.17M | $4.36M |
| Wonof 4 | D08-Bridge/Wall RepairsBridge | D08 | Apr 2024 | $1.04M | $1.04M |
| Rank 3of 5 | CLE-SR 133-20.30 Shared Use PathSafety | CLE | Apr 2024 | $820k | $737k |
| Rank 2of 2 | HAM-IR 75-08.91 Pump Station & CSOBuilding | HAM | Apr 2024 | $20.2M | $19.8M |
| Rank 5of 6 | HAM-CR 101-13.63Signals | HAM | Apr 2024 | $1.22M | $1.06M |
| Rank 2of 3 | HAM-US 27-10.18 SidewalksSafety | HAM | Apr 2024 | $1.07M | $822k |
| Rank 2of 4 | WAR-SR 123-29.40 Community ParkSignals | WAR | Mar 2024 | $2.39M | $2.31M |
| Rank 2of 2 | D08-Bridge Maintenance FY2024Bridge | D08 | Mar 2024 | $4.57M | $3.16M |
| Rank 7of 10 | BRO-SR 32 Rest AreaDrainage | BRO | Mar 2024 | $303k | $239k |
| Rank 3of 6 | GRE-US 68-13.51Signals | GRE | Mar 2024 | $2.31M | $2.29M |
| Rank 6of 9 | HIG-SR 138-24.60Drainage | HIG | Feb 2024 | $292k | $217k |
| Rank 2of 7 | BRO-US 50-03.95 CulvertDrainage | BRO | Feb 2024 | $229k | $219k |
| Rank 2of 6 | HIG-SR 247-00.04Bridge | HIG | Feb 2024 | $847k | $622k |
| Rank 4of 5 | BRO-US 68-44.16Bridge | BRO | Jan 2024 | $2.77M | $2.55M |
| Rank 5of 7 | PIK-SR 772-14.10 Slide RepairEarthwork | PIK | Jan 2024 | $1.08M | $847k |
| Rank 2of 5 | HAM-LMST Ext to Elstun Ph 2Safety | HAM | Jan 2024 | $3.24M | $2.94M |
| Rank 4of 5 | BRO-US 52-22.27 Slide RepairEarthwork | BRO | Jan 2024 | $1.40M | $1.17M |
| Rank 3of 4 | CLE-SR 132-12.49Signals | CLE | Jan 2024 | $2.87M | $2.65M |
| Rank 2of 3 | HAM-/WAR-IR 71-13.50/19.29/03.58Drainage | HAM | Dec 2023 | $803k | $478k |
| Rank 3of 5 | MIA-CR 16A-00.00 (Peterson Rd Brd)Bridge | MIA | Dec 2023 | $5.37M | $4.45M |
| Rank 4of 5 | CLI-US 68-17.97/18.08Drainage | CLI | Nov 2023 | $839k | $719k |
| Rank 4of 5 | BUT-SR 122/SR 177-00.56/09.69Drainage | BUT | Nov 2023 | $587k | $496k |
| Rank 7of 7 | ROS-US 23-06.63 (Trego Creek Safety)Safety | ROS | Nov 2023 | $1.90M | $1.40M |
| Rank 3of 3 | HIG-SR 138-27.24Bridge | HIG | Nov 2023 | $3.97M | $3.08M |
| Rank 4of 4 | CLE-/HAM Culverts FY24Drainage | CLE | Oct 2023 | $1.85M | $1.14M |
| Rank 3of 3 | CLI-SR 729-02.85 and VariousPavement | CLI | Oct 2023 | $7.71M | $6.98M |
| Wonof 3 | HAM-IR 74-14.20Earthwork | HAM | Oct 2023 | $2.12M | $2.12M |
| Rank 2of 3 | MOT-IR 70-06.03Bridge | MOT | Oct 2023 | $2.42M | $2.40M |
| Wonof 3 | CLE-SR 32-02.33 (PART 1)Pavement | CLE | Oct 2023 | $30.0M | $30.0M |
| Rank 2of 3 | HAM-CR 90-03.89Safety | HAM | Oct 2023 | $362k | $312k |
| Rank 4of 9 | PIK-CR 50-02.55 OH18-01Earthwork | PIK | Sep 2023 | $1.40M | $1.13M |
| Rank 3of 4 | HAM-SR 4-07.00 SidewalkSafety | HAM | Sep 2023 | $786k | $512k |
| Rank 3of 4 | GRE-US 42-02.63/20.21Bridge | GRE | Sep 2023 | $3.42M | $3.27M |
| Rank 3of 6 | MOT-BH-FY24Bridge | MOT | Sep 2023 | $2.85M | $2.59M |
| Rank 2of 6 | HAM-IR 71-08.65Pavement | HAM | Aug 2023 | $5.00M | $4.77M |
| Rank 3of 5 | WAR-SR 73-14.58/14.62Bridge | WAR | Aug 2023 | $4.40M | $4.10M |
| Rank 4of 4 | ADA-SR 247-13.22/21.18 CulvertSafety | ADA | May 2023 | $827k | $645k |
| Rank 2of 2 | HAM-US 27-11.09 SidewalksSafety | HAM | May 2023 | $2.75M | $2.65M |
| Rank 2of 3 | BRO-US 32-04.16Pavement | BRO | May 2023 | $20.1M | $18.0M |
| Rank 5of 5 | BUT-CR 19-05.88Safety | BUT | Apr 2023 | $1.57M | $1.23M |
| Rank 3of 3 | LIC-CR 813/MR 491-01.03/00.43Drainage | LIC | Apr 2023 | $1.72M | $1.11M |
| Rank 2of 3 | D09-BH-FY2023Bridge | D09 | Apr 2023 | $1.45M | $1.42M |
| Rank 3of 5 | CLI-IR 71-11.21 Weigh StationPavement | CLI | Apr 2023 | $1.83M | $1.57M |
| Rank 2of 2 | HAM-IR 75-05.53Earthwork | HAM | Apr 2023 | $1.64M | $1.39M |
| Rank 4of 4 | WAR-IR 71-01.69/11.04/13.71Bridge | WAR | Apr 2023 | $5.10M | $4.21M |
| Rank 3of 3 | MOT-SR 48-01.02Signals | MOT | Apr 2023 | $2.94M | $2.57M |
| Rank 3of 4 | CLE-US 52/SR 232-12.89/01.54Drainage | CLE | Apr 2023 | $653k | $453k |
| Rank 3of 3 | D08-Bridge Maintenance FY2023Bridge | D08 | Mar 2023 | $2.55M | $2.34M |
| Rank 3of 6 | BUT-US 27-00.80Bridge | BUT | Mar 2023 | $3.11M | $2.58M |
| Wonof 2 | HAM-CR 23-01.42Bridge | HAM | Mar 2023 | $2.67M | $2.67M |
| Rank 7of 7 | HIG-SR 753-12.00Drainage | HIG | Mar 2023 | $676k | $475k |
| Rank 5of 5 | GRE-SR 725-01.91Bridge | GRE | Mar 2023 | $1.16M | $950k |
| Rank 5of 7 | HIG-SR 134-07.82Drainage | HIG | Mar 2023 | $606k | $497k |
| Rank 10of 10 | HOC-SR 664-16.51Drainage | HOC | Mar 2023 | $744k | $449k |
| Rank 4of 7 | ROS-SR 327-02.47Drainage | ROS | Feb 2023 | $1.05M | $934k |
| Rank 2of 4 | WAR-SR 123-28.55Signals | WAR | Feb 2023 | $1.83M | $1.81M |
| Rank 4of 10 | PIK-CR 77-02.07 OBPPBridge | PIK | Jan 2023 | $568k | $497k |
| Wonof 4 | HAM-IR 275-07.50Drainage | HAM | Jan 2023 | $190k | $190k |
| Rank 5of 9 | HIG-SR 73-17.61 & 17.66 CulvertDrainage | HIG | Jan 2023 | $327k | $264k |
| Rank 3of 5 | HIG-SR 72-05.79Bridge | HIG | Jan 2023 | $1.23M | $1.13M |
| Rank 5of 5 | GRE-US 35-05.63Pavement | GRE | Jan 2023 | $46.7M | $40.1M |
| Rank 3of 6 | BUT-US 127-07.28/11.98Bridge | BUT | Jan 2023 | $841k | $801k |
| Rank 6of 6 | FRA-/FAI-US 33-31.04/00.00 Noise WallSafety | FRA | Dec 2022 | $1.58M | $1.14M |
| Rank 2of 4 | CLE-SR 32-01.40Pavement | CLE | Dec 2022 | $4.96M | $4.38M |
| Rank 3of 3 | MOT-US 35-19.80Pavement | MOT | Dec 2022 | $13.0M | $10.3M |
| Rank 4of 5 | CLE-CR 171 (Old SR74)Pavement | CLE | Dec 2022 | $6.73M | $5.73M |
| Rank 3of 6 | MOT-Olentangy Drive Bridge ReplBridge | MOT | Dec 2022 | $590k | $480k |
| Rank 5of 6 | CLI-SR 73-02.66Signals | CLI | Dec 2022 | $3.52M | $2.85M |
| Rank 2of 3 | HAM-IR 71-14.40/18.58Bridge | HAM | Nov 2022 | $3.81M | $3.51M |
| Rank 5of 9 | HIG-TR 239-00.88Bridge | HIG | Nov 2022 | $838k | $735k |
| Rank 4of 6 | BUT-CULVERTS FY23Drainage | BUT | Nov 2022 | $763k | $476k |
| Rank 8of 8 | CLA-Geo Rogers Clark Pk Lower BrDrainage | CLA | Nov 2022 | $281k | $196k |
| Rank 6of 6 | ROS-SR 138-10.38Bridge | ROS | Oct 2022 | $2.08M | $1.62M |
| Rank 5of 5 | WAR-IR 71/SR 123-08.05/20.89Drainage | WAR | Oct 2022 | $537k | $295k |
| Rank 6of 10 | HIG-SR 72-02.26Drainage | HIG | Sep 2022 | $521k | $439k |
| Rank 5of 5 | PRE-US 127-04.50Signals | PRE | Sep 2022 | $1.74M | $1.49M |
| Rank 4of 5 | HAM-SR 32-06.82Signals | HAM | Jul 2022 | $5.34M | $4.57M |
| Rank 8of 9 | ROS-SR 772-10.60Earthwork | ROS | Jun 2022 | $855k | $662k |
| Rank 2of 4 | MIA-Great Miami River Trail BrdgBridge | MIA | May 2022 | $2.28M | $2.12M |
| Rank 5of 5 | BRO-US 52-03.63 Geotech/LandslideEarthwork | BRO | May 2022 | $248k | $170k |
| Rank 4of 4 | CLI-IR 71-12.13/13.99Bridge | CLI | May 2022 | $11.4M | $10.4M |
| Rank 6of 6 | ADA-SR 125-01.34 Slide RepairSafety | ADA | May 2022 | $448k | $279k |
| Rank 3of 3 | PRE-Geeding St Bridge ReplacemntBridge | PRE | Apr 2022 | $420k | $350k |
| Rank 6of 6 | PIK-CR 50-03.32 OH16-01Earthwork | PIK | Apr 2022 | $1.34M | $802k |
| Rank 5of 5 | LIC-SR 37-25.05Bridge | LIC | Apr 2022 | $1.10M | $668k |
| Rank 2of 2 | MOT-US 35-14.04Pavement | MOT | Apr 2022 | $2.81M | $2.32M |
| Rank 4of 4 | HAM-US 52-37.99Earthwork | HAM | Mar 2022 | $2.41M | $1.67M |
| Rank 3of 3 | WAR-SR 48-11.54 (PART 1 AND PART 2)Bridge | WAR | Mar 2022 | $5.57M | $4.60M |
| Rank 4of 4 | BRO-SR 763-01.51Drainage | BRO | Mar 2022 | $1.47M | $985k |
| Rank 4of 4 | BUT-US 27-01.85Signals | BUT | Mar 2022 | $5.16M | $3.89M |
| Wonof 4 | HAM-IR 71 Ramp Stewart Rd CulvertDrainage | HAM | Feb 2022 | $508k | $508k |
| Wonof 2 | HAM-SR 126-16.81Earthwork | HAM | Jan 2022 | $461k | $461k |
| Rank 2of 3 | CLE-SR 32-02.88Pavement | CLE | Jan 2022 | $2.76M | $2.74M |
| Rank 4of 4 | DAR-SR 118/SR 502-08.25/09.01Bridge | DAR | Jan 2022 | $733k | $421k |
| Rank 5of 5 | CLE-SR 28-01.76Pavement | CLE | Jan 2022 | $4.98M | $3.90M |
| Rank 7of 7 | ADA-SR 770-10.25Bridge | ADA | Jan 2022 | $761k | $575k |
| Rank 6of 6 | LIC-SR 16-16.57Maintenance | LIC | Jan 2022 | $338k | $209k |
| Rank 3of 3 | BUT-SR 177-04.69/05.29Bridge | BUT | Jan 2022 | $791k | $685k |
| Rank 4of 5 | BUT-SR 129-07.20Drainage | BUT | Jan 2022 | $275k | $250k |
| Rank 4of 4 | ADA-/BRO-SR 136/US 62-18.96/26.50Safety | ADA | Dec 2021 | $3.59M | $2.55M |
| Rank 6of 8 | PIK-US 23-15.35 LinerDrainage | PIK | Dec 2021 | $202k | $113k |
| Rank 5of 6 | CLI-Culverts FY22Drainage | CLI | Dec 2021 | $348k | $177k |
| Rank 5of 5 | MOT-SR 49-12.16Bridge | MOT | Dec 2021 | $361k | $284k |
| Rank 3of 6 | CLE-SR 32-03.50 (PART 1, 2, 3)Pavement | CLE | Dec 2021 | $44.1M | $42.5M |
| Rank 4of 4 | BUT-SR 122-06.06/06.26Bridge | BUT | Nov 2021 | $4.13M | $3.01M |
| Rank 5of 5 | CLA-US 42/US 68-04.62/15.16Bridge | CLA | Nov 2021 | $1.59M | $1.19M |
| Rank 7of 7 | LIC-IR 70-01.90Safety | LIC | Nov 2021 | $881k | $743k |
| Rank 3of 3 | PIC-SR 188-00.22Bridge | PIC | Oct 2021 | $2.19M | $1.78M |
| Rank 3of 8 | CLI-SR 28/SR 124-04.52/05.47/00.54Drainage | CLI | Oct 2021 | $778k | $749k |
| Rank 4of 10 | CLA-SR 72-08.63Bridge | CLA | Oct 2021 | $998k | $899k |
| Rank 4of 4 | PRE-SR 122-14.41/17.69Bridge | PRE | Oct 2021 | $1.54M | $1.35M |
| Rank 7of 8 | BRO-SR 221-05.47Bridge | BRO | Oct 2021 | $4.28M | $3.44M |
| Rank 4of 4 | HAM-IR 75-16.97Bridge | HAM | Oct 2021 | $2.67M | $1.93M |
| Rank 7of 10 | CLE-/WAR-SR 132/SR 123-21.21/01.51Drainage | CLE | Sep 2021 | $780k | $668k |
| Rank 7of 7 | PIK-SR 220-03.29Bridge | PIK | Sep 2021 | $2.22M | $1.52M |
| Rank 6of 6 | BUT-SR 732-03.04Bridge | BUT | Sep 2021 | $1.36M | $1.19M |
| Rank 3of 5 | HAM-SR 264-Culverts FY22Drainage | HAM | Aug 2021 | $180k | $163k |
| Rank 7of 7 | SCI-SR 104-08.15 LandslideDrainage | SCI | Aug 2021 | $1.08M | $723k |
| Rank 7of 8 | MOT-IR 75-23.71Other | MOT | Aug 2021 | $522k | $368k |
| Rank 4of 4 | HAM-CR 376-00.96 Paddison SidewlkSafety | HAM | Jul 2021 | $497k | $383k |
| Rank 6of 7 | FRA-SR 315-07.13 Noise Wall Part 1&2Safety | FRA | Jun 2021 | $4.06M | $3.40M |
| Rank 3of 6 | BRO-US 68-30.82 SafetySignals | BRO | Jun 2021 | $2.03M | $1.96M |
| Rank 6of 6 | MIA-IR 75-19.01 L/RBridge | MIA | Jun 2021 | $7.10M | $5.96M |
| Rank 7of 9 | CLE-Bike Trail Culvert FY21Drainage | CLE | May 2021 | $234k | $163k |
| Rank 4of 6 | BRO-SR 221-06.80 Landslide SiteEarthwork | BRO | May 2021 | $1.99M | $1.39M |
| Rank 5of 8 | FAY-SR 41-00.47/02.32Drainage | FAY | May 2021 | $793k | $648k |
| Rank 4of 5 | BRO-US 52-02.51Earthwork | BRO | May 2021 | $422k | $310k |
| Rank 2of 4 | HAM-/WAR-IR 71-19.83/00.00Pavement | HAM | May 2021 | $5.54M | $4.73M |
| Rank 3of 3 | MOT-Mad River Rec Trail ResurfacPavement | MOT | May 2021 | $592k | $541k |
| Rank 5of 5 | PIK-CR 50-03.40 OH18-01Earthwork | PIK | Apr 2021 | $1.19M | $839k |
| Rank 4of 4 | PRE-Spring St Bridge ReplacementBridge | PRE | Apr 2021 | $236k | $211k |
| Rank 5of 6 | PIK-CR 57-03.47 Brdg ReplacementBridge | PIK | Apr 2021 | $981k | $849k |
| Rank 6of 6 | CLE-R Culverts FY21Drainage | CLE | Mar 2021 | $615k | $446k |
| Rank 4of 7 | BUT-SR 4-10.83Signals | BUT | Mar 2021 | $2.13M | $1.75M |
| Rank 6of 6 | PIK-CR 66-04.36Pavement | PIK | Mar 2021 | $4.10M | $3.35M |
| Rank 5of 9 | BRO-SR 505-05.97Drainage | BRO | Feb 2021 | $530k | $444k |
| Rank 7of 8 | FAI-TR 201-01.10Pavement | FAI | Feb 2021 | $1.67M | $1.34M |
| Wonof 4 | HAM-IR 75-14.61Pavement | HAM | Feb 2021 | $45.7M | $45.7M |
| Rank 2of 3 | D08-Bridge Maintenance FY2021Bridge | D08 | Feb 2021 | $3.16M | $2.27M |
| Rank 3of 7 | BRO-SR 774-10.47Bridge | BRO | Feb 2021 | $880k | $855k |
| Rank 4of 8 | HAM-IR 275-34.70Earthwork | HAM | Jan 2021 | $724k | $645k |
| Rank 4of 6 | DAR-SR 49-23.78Bridge | DAR | Jan 2021 | $476k | $442k |
| Rank 3of 5 | HAM-IR 71-01.34Maintenance | HAM | Jan 2021 | $522k | $425k |
| Rank 8of 9 | SCI-SR 348-09.42Drainage | SCI | Jan 2021 | $585k | $456k |
| Rank 3of 8 | MOT-IR 70-16.25Maintenance | MOT | Jan 2021 | $851k | $771k |
| Wonof 8 | HIG-SR 41-00.38Bridge | HIG | Jan 2021 | $924k | $924k |
| Rank 3of 4 | GRE-Culverts FY21Drainage | GRE | Jan 2021 | $435k | $244k |
| Rank 6of 6 | CLE-IR 275-07.71Earthwork | CLE | Jan 2021 | $1.31M | $839k |
| Wonof 6 | WAR-US 22-07.12Pavement | WAR | Jan 2021 | $1.25M | $1.25M |
| Rank 4of 7 | BUT-SR 122-10.33Pavement | BUT | Dec 2020 | $943k | $876k |
| Rank 3of 5 | HAM-US 50-22.30/22.38Bridge | HAM | Dec 2020 | $2.29M | $1.82M |
| Rank 9of 9 | HAM-IR 275-04.06Earthwork | HAM | Dec 2020 | $833k | $662k |
| Rank 5of 5 | MOT-E Springfield St ImprovementPavement | MOT | Dec 2020 | $4.34M | $3.66M |
| Rank 3of 7 | BRO-US 52-15.20 OH18-01Drainage | BRO | Dec 2020 | $347k | $275k |
| Rank 4of 10 | MAD-US 62-02.79Bridge | MAD | Dec 2020 | $2.51M | $2.38M |
| Rank 2of 5 | MOT-IR 75-09.53Signals | MOT | Dec 2020 | $457k | $454k |
| Rank 9of 10 | ROS-US 23/US 35-VAR/VARBridge | ROS | Nov 2020 | $635k | $322k |
| Rank 7of 8 | MOT-SR 235-00.22LBridge | MOT | Nov 2020 | $3.67M | $3.05M |
| Rank 6of 7 | GRE-SR 235-10.75/11.10Bridge | GRE | Nov 2020 | $4.48M | $3.83M |
| Rank 7of 10 | HIG-SR 28-09.25Drainage | HIG | Nov 2020 | $568k | $473k |
| Rank 10of 10 | ADA-SR 32-23.22Safety | ADA | Nov 2020 | $903k | $579k |
| Rank 2of 3 | CLE-IR 275/SR 32-10.57/01.35Bridge | CLE | Nov 2020 | $351k | $333k |
| Wonof 5 | BUT-US 127-16.56Signals | BUT | Nov 2020 | $2.70M | $2.70M |
| Wonof 6 | HAM-US 42-11.97Bridge | HAM | Oct 2020 | $954k | $954k |
| Rank 5of 5 | HAM-US 27-10.39Safety | HAM | Oct 2020 | $720k | $598k |
| Rank 6of 6 | BUT-SR 122D-00.59LBridge | BUT | Oct 2020 | $872k | $622k |
| Rank 3of 5 | PRE-US 40-06.73Bridge | PRE | Oct 2020 | $732k | $681k |
| Rank 6of 8 | SCI-US 52-02.44 & 10.15Drainage | SCI | Oct 2020 | $1.10M | $857k |
| Rank 9of 9 | MAD-SR 29-10.61Bridge | MAD | Oct 2020 | $3.19M | $2.60M |
| Rank 2of 2 | BRO-SR 52-19.99Safety | BRO | Aug 2020 | $162k | $143k |
| Rank 3of 6 | HAM-Dana Ave Storm PipeDrainage | HAM | Aug 2020 | $249k | $170k |
| Rank 2of 2 | FRA-US 23-22.75 SigningSafety | FRA | Jul 2020 | $798k | $646k |
| Rank 6of 6 | UNI-US 42-04.51/04.68Pavement | UNI | Jul 2020 | $1.96M | $1.53M |
| Wonof 6 | MOT-Englewood Pattys Bridge RprBridge | MOT | Jul 2020 | $31k | $31k |
| Wonof 4 | GRE-US 68-09.57/13.35Bridge | GRE | Jul 2020 | $1.26M | $1.26M |
| Rank 7of 7 | MOT-IR 75-10.44/10.78Bridge | MOT | Jul 2020 | $21.1M | $17.7M |
| Rank 2of 4 | BUT-SR 4-17.90Maintenance | BUT | Jun 2020 | $179k | $144k |
| Wonof 4 | BRO-CR 42A-00.28Bridge | BRO | Jun 2020 | $889k | $889k |
| Rank 2of 4 | SCI-Shawnee State Forest BridgesBridge | SCI | May 2020 | $417k | $411k |
| Rank 2of 3 | CLE-SR 743-03.53Earthwork | CLE | May 2020 | $686k | $356k |
| Rank 4of 8 | BRO-SR 763-00.62 CulvertDrainage | BRO | May 2020 | $750k | $600k |
| Rank 3of 4 | LIC-SR 79-19.90Bridge | LIC | May 2020 | $1.02M | $957k |
| Rank 4of 8 | BUT-SR 73-13.05Signals | BUT | May 2020 | $3.27M | $2.94M |
| Rank 6of 6 | LIC-SR 13-07.82Maintenance | LIC | Apr 2020 | $937k | $591k |
| Rank 3of 3 | BRO-SR 221-03.91 & VARBridge | BRO | Apr 2020 | $732k | $588k |
| Rank 4of 4 | PIK-CR 84-04.60 Brdg ReplacementBridge | PIK | Apr 2020 | $578k | $402k |
| Rank 5of 8 | BRO-SR 505-05.50Drainage | BRO | Apr 2020 | $221k | $150k |
| Rank 3of 4 | HIG-SR 41-02.02Drainage | HIG | Mar 2020 | $361k | $315k |
| Wonof 2 | FRA-IR 71 Ramp/Silver at HudsonSignals | FRA | Mar 2020 | $558k | $558k |
| Rank 4of 4 | ATH-SR 56-10.57Bridge | ATH | Mar 2020 | $1.31M | $970k |
| Rank 5of 9 | CLI-/WAR-SR 350-08.97/01.56Drainage | CLI | Mar 2020 | $307k | $276k |
| Rank 4of 5 | PIC-SR 674-10.19/10.35Earthwork | PIC | Mar 2020 | $572k | $397k |
| Rank 2of 3 | BUT-IR 75-03.82, Ramp EEarthwork | BUT | Mar 2020 | $684k | $551k |
| Rank 3of 4 | CLE-WAR Culverts FY20 (A) (PART 1 AND PART 2)Drainage | CLE | Mar 2020 | $1.76M | $1.64M |
| Rank 5of 8 | ROS-US 23-02.50 OH17-01Earthwork | ROS | Mar 2020 | $803k | $676k |
| Rank 3of 9 | BRO-/ROS-SR 32/US 35-07.43/09.28Drainage | BRO | Mar 2020 | $291k | $250k |
| Rank 7of 8 | GRE-SR 444-04.60Pavement | GRE | Feb 2020 | $1.65M | $1.46M |
| Wonof 6 | CLE-/WAR Culverts FY20 (B)Drainage | CLE | Feb 2020 | $194k | $194k |
| Rank 4of 4 | BUT-IR 75-05.35Bridge | BUT | Feb 2020 | $2.70M | $2.01M |
| Rank 6of 6 | LIC-SR 37/SR 661-16.59/00.00Pavement | LIC | Feb 2020 | $9.84M | $8.78M |
| Rank 4of 8 | HAM-IR 71-08.03Maintenance | HAM | Nov 2018 | $484k | $359k |
| Rank 7of 10 | ROS-US 23-16.12Other | ROS | Nov 2018 | $372k | $263k |
| Rank 3of 5 | MIA-IR 75-14.15/14.57Bridge | MIA | Nov 2018 | $11.0M | $9.57M |
| Rank 7of 7 | HOC-US 33-09.22 L&RBridge | HOC | Nov 2018 | $1.14M | $895k |
| Rank 4of 4 | DEL-US 36-22.83Bridge | DEL | Oct 2018 | $356k | $257k |
| Rank 5of 5 | MOT-US 35-15.13 SBridge | MOT | Oct 2018 | $1.74M | $1.56M |
| Rank 3of 7 | HAM-Culverts FY19Drainage | HAM | Oct 2018 | $982k | $568k |
| Rank 7of 9 | BRO-CR 13-03.30Bridge | BRO | Oct 2018 | $2.16M | $1.83M |
| Rank 2of 5 | MOT-SR 201-09.90Maintenance | MOT | Sep 2018 | $26k | $23k |
| Rank 8of 9 | D09-CR-FY2019Drainage | D09 | Sep 2018 | $727k | $401k |
| Rank 2of 5 | BUT-/HAM Culverts FY19Drainage | BUT | Sep 2018 | $716k | $658k |
| Rank 6of 7 | PIK-TR 655-00.24Bridge | PIK | Aug 2018 | $813k | $738k |
| Wonof 3 | BUT-/WAR-IR 75-09.00/06.10Maintenance | BUT | Aug 2018 | $341k | $341k |
| Rank 3of 8 | PIK-SR 772-07.89Drainage | PIK | Aug 2018 | $238k | $197k |
| Rank 6of 6 | MAD-US 40-06.64Bridge | MAD | Jul 2018 | $1.98M | $1.71M |
| Rank 3of 4 | MOT-Grant Park Nature NookPavement | MOT | Jun 2018 | $95k | $69k |
| Rank 3of 5 | SCI-SR 140-01.64Maintenance | SCI | Jun 2018 | $356k | $318k |
| Rank 5of 6 | ADA-SR 348-01.52Safety | ADA | May 2018 | $416k | $387k |
Source: public.bid_results, ODOT bid tabs. Bidder strings are normalized to upper-case but not yet entity-resolved, so related firms (e.g. "Shelly Company" vs "Shelly & Sands") are shown separately.