Sidewalk
Allen County · plans pulled by 3 GCs
Allen County · plans pulled by 3 GCs
1 prime + 2 subs pulled plans · W L Markers INC wins 50% of OH safety bids it enters
If your number lands…historical win odds, OH
Share of OH bids over the last 5 years that landed there vs the official estimate and won (n=9,410 bids) — historical frequency, not a forecast. ODOT's estimate stays sealed until bids open.
Pulled plans1 prime · 2 subs
Likely also biddingOH safety regulars · 7
Confirmed = pulled plans on this letting (revealed interest, from the agency portal). Likely = firms that bid OH safetywork in the last 3 years, ranked by where and how recently they bid it — firms most active in this project’s county and ODOT district rank first. Win rate is historical — the share of bids that firm entered and won, not a prediction of this letting.
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
Bid form · ODOT
70 advertised pay items from the ODOT bid form. Open a category to see its items — unit prices appear here once bids open.
| 611E00400 | 4" CONDUIT, TYPE E | 40 FT |
| 625E00451 | CONNECTION, FUSED PULL APART, AS PER PLAN | 30 EACH |
| 625E00460 | CONNECTION, UNFUSED PULL APART | 10 EACH |
| 625E10481 | LIGHT POLE, AESTHETIC, AS PER PLAN, HOLOPHANE POST-TOP | 9 EACH |
| 625E14000 | LIGHT POLE FOUNDATION, 24" X 6' DEEP | 10 EACH |
| 625E23000 | NO. 4 AWG 600 VOLT DISTRIBUTION CABLE | 3,495 FT |
| 625E23304 | NO. 8 AWG 600 VOLT DISTRIBUTION CABLE | 3,495 FT |
| 625E23400 | NO. 10 AWG POLE AND BRACKET CABLE | 1,440 FT |
| 625E25408 | CONDUIT, 2", 725.051 | 825 FT |
| 625E25504 | CONDUIT, 3", 725.051 | 47 FT |
| 625E25909 | CONDUIT, JACKED OR DRILLED, 725.052, AS PER PLAN, 3" | 51 FT |
| 625E27520 | REMOVAL OF LUMINAIRE AND REERECTION | 1 EACH |
| 625E27551 | LUMINAIRE, DECORATIVE, AS PER PLAN, HOLOPHANE POST-TOP | 9 EACH |
| 625E29000 | TRENCH | 872 FT |
| 625E30520 | PULL BOX, 725.06, SIZE 7 | 2 EACH |
| 625E32000 | GROUND ROD | 11 EACH |
| 625E34001 | POWER SERVICE, AS PER PLAN | 1 EACH |
| 625E36010 | UNDERGROUND WARNING MARKING TAPE | 872 FT |
| 625E60010 | LIGHT POLE REMOVED FOR REERECTION | 1 EACH |
| 625E75500 | LIGHT POLE FOUNDATION REMOVED | 1 EACH |
| 625E76000 | ARC FLASH CALCULATIONS AND LABEL, (LIGHTING POWER SERVICE) NR) | 1 EACH |
| 632E69320 | POWER CABLE, 3 CONDUCTOR, NO. 2 AWG | 81 FT |
| 630E03100 | GROUND MOUNTED SUPPORT, NO. 3 POST | 28 FT |
| 630E08600 | SIGN POST REFLECTOR: RED | 2 EACH |
| 630E08600 | SIGN POST REFLECTOR: YELLOW | 1 EACH |
| 630E80100 | SIGN, FLAT SHEET | 14 SF |
| 630E80500 | SIGN, DOUBLE FACED, STREET NAME | 2 EACH |
| 630E84900 | REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 5 EACH |
| 630E85100 | REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH |
| 630E86002 | REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSAL | 3 EACH |
| 644E00500 | STOP LINE | 14 FT |
| 644E00620 | CROSSWALK LINE, 12" | 73 FT |
| 644E19000 | SHARED LANE MARKING | 4 EACH |
| 201E11001 | CLEARING AND GRUBBING, AS PER PLAN | Lump sum |
| 202E30000 | WALK REMOVED | 3,200 SF |
| 203E10000 | EXCAVATION | 590 CY |
| 203E20000 | EMBANKMENT | 7 CY |
| 204E10000 | SUBGRADE COMPACTION | 1,380 SY |
| 608E10000 | 4" CONCRETE WALK | 459 SF |
| 608E52000 | CURB RAMP | 237 SF |
| 623E50000 | PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND REPORT NR) | Lump sum |
| 623E51000 | POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND REPORT | Lump sum |
| 659E00300 | TOPSOIL | 368 CY |
| 659E00500 | SEEDING AND MULCHING, CLASS 1 | 2,653 SY |
| 659E14000 | REPAIR SEEDING AND MULCHING | 120 SY |
| 659E15000 | INTER-SEEDING | 120 SY |
| 659E20000 | COMMERCIAL FERTILIZER | 0.5 TON |
| 659E31000 | LIME | 0.48 ACRE |
| 659E35000 | WATER | 12.9 MGAL |
| 832E30000 | EROSION CONTROL | 5,500 EACH |
| 202E23000 | PAVEMENT REMOVED | 446 SY |
| 304E20000 | AGGREGATE BASE | 238 CY |
| 407E20000 | NON-TRACKING TACK COAT, 0.06 GAL/S.Y. | 57 GAL |
| 441E70000 | ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG64-22 | 37 CY |
| 441E70300 | ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (449) | 68 CY |
| 441E70500 | ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), (DRIVEWAYS) | 2 CY |
| 441E70700 | ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (449), (DRIVEWAYS) | 4 CY |
| 452E10011 | 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, AS PER PLAN | 456 SY |
| 611E00900 | 6" CONDUIT, TYPE B | 25 FT |
| 611E97400 | CONDUIT, MISC.: TYPE B FOR DRAINAGE DISCHARGE | 10 FT |
| 611E97400 | CONDUIT, MISC.: TYPE C FOR DRAINAGE DISCHARGE | 10 FT |
| 611E97400 | CONDUIT, MISC.: TYPE E FOR DRAINAGE DISCHARGE | 10 FT |
| 611E97400 | CONDUIT, MISC.: TYPE F FOR DRAINAGE DISCHARGE | 10 FT |
| 103E05000 | PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYMENT BOND | Lump sum |
| 614E11000 | MAINTAINING TRAFFIC | Lump sum |
| 623E10001 | CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER PLAN | Lump sum |
| 624E10000 | MOBILIZATION | Lump sum |
| 611E99654 | MANHOLE ADJUSTED TO GRADE | 2 EACH |
| 611E99660 | MANHOLE RECONSTRUCTED TO GRADE | 3 EACH |
| 638E10900 | SERVICE BOX ADJUSTED TO GRADE | 2 EACH |