Culvert Replacement
Hamilton County · plans pulled by 2 GCs
Hamilton County · plans pulled by 2 GCs
1 prime + 1 sub pulled plans · Bcc Ohio INC wins 56% of OH drainage bids it enters
If your number lands…historical win odds, OH
Share of OH bids over the last 5 years that landed there vs the official estimate and won (n=9,410 bids) — historical frequency, not a forecast. ODOT's estimate stays sealed until bids open.
Pulled plans1 prime · 1 sub
Likely also biddingOH drainage regulars · 8
Confirmed = pulled plans on this letting (revealed interest, from the agency portal). Likely = firms that bid OH drainagework in the last 3 years, ranked by where and how recently they bid it — firms most active in this project’s county and ODOT district rank first. Win rate is historical — the share of bids that firm entered and won, not a prediction of this letting.
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
Bid form · ODOT
42 advertised pay items from the ODOT bid form. Open a category to see its items — unit prices appear here once bids open.
| 201E11000 | CLEARING AND GRUBBING (HAM-126-2231) | Lump sum |
| 201E11000 | CLEARING AND GRUBBING (HAM-275-3781) | Lump sum |
| 201E11000 | CLEARING AND GRUBBING (HAM-52-3663) | Lump sum |
| 201E11000 | CLEARING AND GRUBBING (HAM-74-1548) | Lump sum |
| 201E11000 | CLEARING AND GRUBBING (HAM-74-1591) | Lump sum |
| 202E20010 | HEADWALL REMOVED | 3 EACH |
| 202E35100 | PIPE REMOVED, 24" DIAMETER AND UNDER | 118 FT |
| 202E35200 | PIPE REMOVED, OVER 24" DIAMETER | 20 FT |
| 202E70130 | SPECIAL - PIPE CLEANOUT OVER 48" | 569 FT |
| 203E20000 | EMBANKMENT | 175 CY |
| 503E11100 | COFFERDAMS AND EXCAVATION BRACING (HAM-275-3781) | Lump sum |
| 503E11101 | COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN (HAM-126-2231) | Lump sum |
| 503E11101 | COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN (HAM-52-3663) | Lump sum |
| 503E11101 | COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN (HAM-74-1548) | Lump sum |
| 503E11101 | COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN (HAM-74-1591) | Lump sum |
| 601E32100 | ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 29.2 CY |
| 601E32200 | ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 1 CY |
| 659E00300 | TOPSOIL | 1,232 CY |
| 659E10000 | SEEDING AND MULCHING | 11,100 SY |
| 659E20000 | COMMERCIAL FERTILIZER | 1.5 TON |
| 659E31000 | LIME | 2.29 ACRE |
| 659E35000 | WATER | 60 MGAL |
| 671E15040 | EROSION CONTROL MAT, TYPE E | 222 SY |
| 832E30000 | EROSION CONTROL | 6,000 EACH |
| 602E20000 | CONCRETE MASONRY | 15.25 CY |
| 611E06700 | 15" CONDUIT, TYPE F, 707.05 TYPE C, 707.21, OR 707.33 | 118 FT |
| 611E23800 | 60" CONDUIT, TYPE B, 706.02 | 30 FT |
| 611E96550 | FIELD PAVING OF EXISTING PIPE, 60" CMP | 492 FT |
| 611E96550 | FIELD PAVING OF EXISTING PIPE, 66" CMP | 436 FT |
| 611E96550 | FIELD PAVING OF EXISTING PIPE, 84" CMP | 133 FT |
| 611E99574 | MANHOLE, NO. 3 | 1 EACH |
| 614E11110 | LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSISTANCE | 200 HOUR |
| 614E12390 | WORK ZONE IMPACT ATTENUATOR, OVER 24" AND LESS THAN 36" WIDE HAZARDS, (UNIDIRECTIONAL) | 4 EACH |
| 614E13310 | BARRIER REFLECTOR, TYPE 1 ONE-WAY | 24 EACH |
| 614E13350 | OBJECT MARKER, ONE WAY | 24 EACH |
| 614E18601 | PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 1 SNMT |
| 614E24402 | WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I | 600 FT |
| 622E41100 | PORTABLE BARRIER, UNANCHORED | 1,200 FT |
| 103E05000 | PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYMENT BOND | Lump sum |
| 614E11000 | MAINTAINING TRAFFIC | Lump sum |
| 623E10000 | CONSTRUCTION LAYOUT STAKES AND SURVEYING | Lump sum |
| 624E10000 | MOBILIZATION | Lump sum |