LAW-US 52-15.03 AND VARIOUS
LAW County · est $1.1M
Bid dateThursday, February 1—
LAW County · est $1.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Miller Cable Company | R3Perram Electric INC | % of bid |
|---|---|---|---|---|---|
| 809E69100 STOP-BAR RADAR DETECTION | 23 EACH | $5,800 | $5,450 | $7,695 | 14% |
| 632E85321 COMBINATION STRAIN POLE, TYPE TC-81.10, DESIGN 13, | 10 EACH | $12,000 | $12,500 | $12,690 | 12% |
| 632E64000 STRAIN POLE FOUNDATION | 24 EACH | $4,800 | $6,800 | $5,205 | 12% |
| 809E69000 ADVANCE RADAR DETECTION | 12 EACH | $6,000 | $5,950 | $7,845 | 7% |
| 632E85201 COMBINATION STRAIN POLE, TYPE TC-81.10, DESIGN 12, | 10 EACH | $7,000 |
| Item | Quantity | R1Complete General Construction Company | R2Miller Cable Company | R3Perram Electric INC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $1,200 | $1,240 |
| 606E15050 GUARDRAIL, TYPE MGS | 62.5 FT | $43.20 | $43.20 | $45.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 1 EACH | $2,470 | $2,470 | $2,470 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $875 | $875 | $875 |
| 659E00300 TOPSOIL | 31 CY | $25.00 | $25.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $7,000 |
| $7,780 |
| 7% |
| 630E97700 SIGNING, MISC.:LED ENHANCED SIGN | 8 EACH | $8,500 | $3,950 | $5,320 | 7% |
| 633E65520 CABINET, TYPE 332 | 6 EACH | $8,600 | $6,100 | $6,685 | 5% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 66 EACH | $675 | $900 | $635 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $40,000 | 4% |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 6 EACH | $5,600 | $5,500 | $5,905 | 3% |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 6 EACH | $5,000 | $1,100 | $4,650 | 3% |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 3,198 FT | $9.00 | $15.00 | $10.75 | 3% |
| 625E18510 BRACKET ARM, 30' | 23 EACH | $1,250 | $875 | $795 | 3% |
| 632E30200 MESSENGER WIRE, 7 STRAND, 3/8" DIAMETER WITH ACCES | 3,198 FT | $8.00 | $15.00 | $10.80 | 3% |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 10,016 FT | $2.50 | $2.00 | $2.45 | 3% |
| 632E85101 COMBINATION STRAIN POLE, TYPE TC-81.10, DESIGN 11, | 4 EACH | $6,000 | $6,100 | $6,970 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 10 MNTH | $2,000 | $1,100 | $1,000 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $16,000 | $26,390 | $61,550 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $70.00 | $65.00 | $65.00 | 1% |
| 632E70001 POWER SERVICE, AS PER PLAN | 6 EACH | $2,225 | $1,200 | $1,880 | 1% |
| $40.00 |
| 659E10000 SEEDING AND MULCHING | 276 SY | $7.40 | $7.40 | $7.40 |
| 659E14000 REPAIR SEEDING AND MULCHING | 13.78 SY | $0.45 | $0.45 | $0.45 |
| 659E20000 COMMERCIAL FERTILIZER | 0.04 TON | $350 | $350 | $350 |
| 659E31000 LIME | 0.06 ACRE | $90.00 | $90.00 | $85.00 |
| 659E35000 WATER | 2 MGAL | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1 EACH | $1.00 | $1.00 | $1.00 |
| 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE | 4,594 FT | $2.50 | $2.00 | $2.75 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 1,127 FT | $1.25 | $1.50 | $1.15 |
| 625E25500 CONDUIT, 3", 725.04 | 70 FT | $23.00 | $27.00 | $29.35 |
| 625E25600 CONDUIT, 4", 725.04 | 160 FT | $32.00 | $30.00 | $35.70 |
| 625E26252 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), LED | 23 EACH | $500 | $450 | $445 |
| 625E29000 TRENCH | 150 FT | $14.00 | $25.00 | $11.35 |
| 625E30706 PULL BOX, 725.08, 24" | 6 EACH | $1,100 | $1,400 | $1,175 |
| 625E32000 GROUND ROD | 30 EACH | $180 | $335 | $205 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 25 FT | $19.00 | $16.00 | $15.40 |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 2 EACH | $445 | $275 | $163 |
| 630E80100 SIGN, FLAT SHEET | 26 SF | $35.00 | $22.00 | $19.90 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 6 EACH | $1,100 | $1,400 | $1,085 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 73 EACH | $45.00 | $30.00 | $10.00 |
| 632E68100 POWER CABLE, 1 CONDUCTOR, NO. 6 AWG | 368 FT | $2.25 | $2.00 | $1.40 |
| 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG | 1,190 FT | $5.00 | $2.00 | $2.55 |
| 633E67100 CABINET FOUNDATION | 6 EACH | $2,200 | $3,100 | $2,750 |
| 633E67200 CONTROLLER WORK PAD | 6 EACH | $650 | $600 | $410 |
| 633E68511 COMMUNICATIONS, AS PER PLAN | 4 EACH | $2,500 | $2,630 | $2,410 |
| 633E99000 CONTROLLER ITEM, MISC.:CONTROLLER UNIT INSTALLATIO | 6 EACH | $500 | $300 | $500 |
| 616E10000 WATER | 2 MGAL | $110 | $1.00 | $1.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,000 | $8,604 | $11,233 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,600 | $7,700 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 809E69100 STOP-BAR RADAR DETECTION | 23 EACH | $5,800 | $133k | 12% |
| 632E85321 COMBINATION STRAIN POLE, TYPE TC-81.10, DESIGN 13, | 10 EACH | $12,000 | $120k | 11% |
| 632E64000 STRAIN POLE FOUNDATION | 24 EACH | $4,800 | $115k | 11% |
| 809E69000 ADVANCE RADAR DETECTION | 12 EACH | $6,000 | $72k | 7% |
| 632E85201 COMBINATION STRAIN POLE, TYPE TC-81.10, DESIGN 12, | 10 EACH | $7,000 | $70k | 6% |
| 630E97700 SIGNING, MISC.:LED ENHANCED SIGN | 8 EACH | $8,500 | $68k | 6% |
| 633E65520 CABINET, TYPE 332 | 6 EACH | $8,600 | $52k | 5% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 66 EACH | $675 | $45k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 4% |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 6 EACH | $5,600 | $34k | 3% |