Ohio DOT · bid history
| Result | Project | County | Let | Their bid | Winning bid |
|---|---|---|---|---|---|
| Rank 4of 4 | MEG-SR 681-03.07Earthwork | MEG | Apr 2026 | $12.9M | $9.94M |
| Rank 3of 3 | DEL-SR 229-00.45 AND VARIOUSBridge | DEL | Apr 2026 | $7.12M | $5.63M |
| Wonof 3 | D12-LG FY2026Signals | D12 | Mar 2026 | $1.40M | $1.40M |
| Wonof 5 | STA-SR 241-14.58 (SRTS)Safety | STA | Mar 2026 | $395k | $395k |
| Rank 3of 3 | FRA-IR 270-32.92 at Easton WayPavement | FRA | Mar 2026 | $6.20M | $5.19M |
| Wonof 3 | ERI-/HUR TSG FY2026Signals | ERI | Mar 2026 | $723k | $723k |
| Rank 5of 6 | LAK-IR 90 Vacant Rest Areas TPPavement | LAK | Mar 2026 | $6.89M | $6.19M |
| Rank 2of 4 | SUM-IR 277-03.73Bridge | SUM | Feb 2026 | $15.6M | $15.4M |
| Rank 3of 4 | MAH-IR 680-04.58 (PART 1 AND PART 2)Pavement | MAH | Feb 2026 | $68.3M | $55.8M |
| Wonof 3 | CUY-IR 71-10.07 SW ReplaceBridge | CUY | Jan 2026 | $11.0M | $11.0M |
| Rank 2of 2 | MRW-/MRW-IR 71/SR 288-17.013 R/0.073Bridge | MRW | Jan 2026 | $2.15M | $1.84M |
| Rank 6of 7 | TRU-IR 80-11.32 Truck ParkingPavement | TRU | Jan 2026 | $5.41M | $4.72M |
| Rank 7of 9 | CUY-IR 480-13.04 RampsPavement | CUY | Jan 2026 | $2.48M | $1.87M |
| Rank 3of 5 | NOB-CEVSD Campus ConnectivitySafety | NOB | Dec 2025 | $2.14M | $2.04M |
| Rank 2of 5 | CUY-IR 77-15.46/VAR DecksBridge | CUY | Dec 2025 | $26.6M | $25.3M |
| Rank 2of 3 | LAK-US 6-02.06 SuperBridge | LAK | Oct 2025 | $7.44M | $7.00M |
| Rank 3of 5 | CUY-US 6-14.56 Tower BBridge | CUY | Sep 2025 | $1.39M | $1.11M |
| Rank 3of 3 | CUY-Eastland Rd/SR 237 SignalSignals | CUY | Sep 2025 | $135k | $108k |
| Rank 2of 3 | LAK-IR 90-11.51 DeckBridge | LAK | Sep 2025 | $2.58M | $2.49M |
| Rank 8of 8 | ROS-SR 772-07.64Bridge | ROS | Aug 2025 | $2.55M | $1.65M |
| Rank 2of 3 | MAR-US 23/SR 529-07.86 & 10.06/02.80Bridge | MAR | Aug 2025 | $7.62M | $7.29M |
| Rank 2of 5 | LAK-SR 283-14.34 DeckBridge | LAK | Aug 2025 | $4.98M | $4.71M |
| Wonof 1 | LOR-US 6-09.67 Span LocksBridge | LOR | Jul 2025 | $389k | $389k |
| Rank 5of 6 | D06-Bridge Pier EncasementsBridge | D06 | Jul 2025 | $2.81M | $1.60M |
| Rank 3of 4 | ATB-LG FY2026Signals | ATB | Jul 2025 | $577k | $467k |
| Rank 4of 7 | D06-ITS MAINT-FY2026Signals | D06 | Jul 2025 | $1.44M | $1.20M |
| Rank 2of 4 | CUY-Mayfield Hts SignalsSignals | CUY | Jul 2025 | $2.48M | $2.25M |
| Rank 3of 4 | MED-US 42-03.10 L Reconstr.Bridge | MED | Jun 2025 | $1.02M | $875k |
| Rank 3of 3 | D12-TSG FY2025Signals | D12 | May 2025 | $247k | $175k |
| Rank 2of 4 | FAI-US 33-02.64Pavement | FAI | May 2025 | $52.5M | $51.3M |
| Rank 3of 6 | DEL-IR 71-08.91 (Ph A)Pavement | DEL | May 2025 | $34.4M | $32.3M |
| Rank 2of 4 | FRA-IR 71/IR 270-28.27/25.99APavement | FRA | Apr 2025 | $41.7M | $41.4M |
| Rank 2of 2 | CUY-SR 14-06.93 ReplaceBridge | CUY | Mar 2025 | $57.1M | $48.4M |
| Wonof 1 | LOR-SR 301-12.41Bridge | LOR | Feb 2025 | $151k | $151k |
| Wonof 2 | LUC-SR 2-21.24 Heat StraightenBridge | LUC | Feb 2025 | $158k | $158k |
| Rank 5of 6 | CUY-IR 90-19.77/VAR RampsPavement | CUY | Feb 2025 | $3.88M | $2.59M |
| Rank 7of 7 | DEL-SR 521-10.32 and VariousBridge | DEL | Jan 2025 | $3.62M | $2.57M |
| Rank 2of 2 | CLE-SR 32-06.84Bridge | CLE | Dec 2024 | $295k | $247k |
| Wonof 2 | CUY-SR 237-06.95 SuperBridge | CUY | Dec 2024 | $6.78M | $6.78M |
| Rank 4of 4 | GEA-US 322-19.41 ReplaceBridge | GEA | Nov 2024 | $3.09M | $2.07M |
| Rank 5of 5 | GEA-SR 87-12.13 ReplaceBridge | GEA | Nov 2024 | $2.37M | $1.51M |
| Rank 3of 3 | LOR-SR 83-10.79Bridge | LOR | Oct 2024 | $4.46M | $4.16M |
| Rank 2of 2 | CUY-IR 480-17.87WN/17.90ES DecksBridge | CUY | Oct 2024 | $9.33M | $9.23M |
| Wonof 6 | D06-Wrong Way DetectionSignals | D06 | Oct 2024 | $2.75M | $2.75M |
| Rank 3of 7 | MED-IR 76-11.83Signals | MED | Oct 2024 | $377k | $295k |
| Rank 2of 3 | GRE-US 68-12.65Safety | GRE | Oct 2024 | $12.1M | $8.94M |
| Rank 5of 6 | FRA-SR 161-15.80 Noise AbatementSafety | FRA | Sep 2024 | $8.92M | $7.94M |
| Rank 4of 5 | SUM-IR 77-09.75Safety | SUM | Sep 2024 | $8.22M | $6.83M |
| Rank 3of 5 | CUY-IR 77-04.79/Wallings RoadPavement | CUY | Sep 2024 | $8.38M | $8.04M |
| Rank 2of 6 | D03-LG FY2025(A)Signals | D03 | Sep 2024 | $113k | $96k |
| Rank 6of 7 | MAH-IR 680-09.30 Noise WallsSafety | MAH | Sep 2024 | $5.00M | $3.98M |
| Wonof 5 | LAK-US 6-04.61 SuperBridge | LAK | Aug 2024 | $4.08M | $4.08M |
| Wonof 4 | RIC-US 30-08.79 Bridge HitBridge | RIC | Aug 2024 | $100k | $100k |
| Wonof 2 | VAN-US 30-14.02/22.07 Bridge HitBridge | VAN | Aug 2024 | $1.08M | $1.08M |
| Rank 3of 6 | ERI-SR 4-00.45 GSMEarthwork | ERI | Jul 2024 | $632k | $529k |
| Rank 2of 2 | CUY-IR 271-08.45 BarrierSafety | CUY | Jul 2024 | $1.28M | $1.06M |
| Rank 2of 5 | TRU-LG FY2025Signals | TRU | Jun 2024 | $1.52M | $1.38M |
| Wonof 4 | LAK-SR 91-04.23/04.49Bridge | LAK | May 2024 | $15.5M | $15.5M |
| Rank 5of 5 | D12-D4/D12 ITS Camera AdditionsSignals | D12 | May 2024 | $5.71M | $4.25M |
| Rank 3of 3 | D04-TSG FY2024Signals | D04 | May 2024 | $505k | $400k |
| Rank 2of 3 | CUY-Eagle Avenue BridgeBridge | CUY | May 2024 | $4.22M | $2.47M |
| Rank 2of 3 | CUY-/LAK LG FY2024Signals | CUY | Apr 2024 | $1.25M | $1.16M |
| Rank 2of 3 | DEF-US 24-04.73Earthwork | DEF | Mar 2024 | $1.09M | $858k |
| Rank 2of 2 | RIC-SR 309-08.73Bridge | RIC | Feb 2024 | $315k | $232k |
| Wonof 5 | UNI-/DEL-US 33/VAR-17.95/VARBridge | UNI | Jan 2024 | $2.36M | $2.36M |
| Rank 5of 6 | LOR-SR 2-01.51Signals | LOR | Nov 2023 | $385k | $312k |
| Rank 7of 7 | LOR-/MED-TSG FY2024Signals | LOR | Nov 2023 | $224k | $168k |
| Rank 8of 8 | RIC-SR 96-16.58Bridge | RIC | Sep 2023 | $3.29M | $2.35M |
| Rank 3of 4 | MAH-LG FY2024Signals | MAH | Sep 2023 | $1.83M | $1.35M |
| Wonof 5 | FRA-IR 70-20.29 (Courtright Rd.)Bridge | FRA | Sep 2023 | $2.54M | $2.54M |
| Wonof 5 | SUM-IR 271-01.51Bridge | SUM | Sep 2023 | $1.73M | $1.73M |
| Rank 5of 6 | COS-VAR Signal UpgradesSignals | COS | Aug 2023 | $674k | $592k |
| Rank 4of 5 | MED-SR 18-01.72/01.93/02.42Bridge | MED | Aug 2023 | $4.67M | $4.02M |
| Wonof 3 | LOR-SR 2-06.49Bridge | LOR | Aug 2023 | $197k | $197k |
| Rank 2of 2 | LAK-SR 306-04.33 ReplaceBridge | LAK | Aug 2023 | $3.72M | $2.82M |
| Rank 2of 3 | CUY-IR 71/IR 90 Wrong Way SignsSafety | CUY | May 2023 | $3.48M | $3.21M |
| Rank 7of 7 | ATB-SR 531-13.50/15.85Earthwork | ATB | May 2023 | $6.39M | $4.95M |
| Rank 2of 3 | CUY-LG FY2023Signals | CUY | May 2023 | $929k | $866k |
| Rank 4of 4 | LIC-CR 804-01.73Bridge | LIC | Feb 2023 | $4.85M | $4.07M |
| Wonof 3 | LAK-SR 44-06.05/VAR SlopeEarthwork | LAK | Feb 2023 | $447k | $447k |
| Rank 2of 3 | DEL-US 36-11.03Bridge | DEL | Jan 2023 | $34.5M | $31.1M |
| Rank 3of 4 | MAH-IR 76-06.04Pavement | MAH | Jan 2023 | $1.68M | $1.22M |
| Wonof 2 | D12-BH FY2023 Steel RepairBridge | D12 | Dec 2022 | $1.57M | $1.57M |
| Rank 3of 7 | SUM-IR 77-22.30Bridge | SUM | Dec 2022 | $15.6M | $13.4M |
| Rank 4of 5 | D03-TSG FY2023Signals | D03 | Dec 2022 | $223k | $195k |
| Rank 3of 5 | LIC-SR 79-13.30Bridge | LIC | Nov 2022 | $2.96M | $2.59M |
| Wonof 4 | MAH-LG FY2023 (Systematic)Signals | MAH | Nov 2022 | $1.07M | $1.07M |
| Wonof 3 | LOR-/RIC-TSG FY2023(A)Signals | LOR | Nov 2022 | $739k | $739k |
| Rank 2of 4 | LAK-SR 615-04.03 DeckBridge | LAK | Nov 2022 | $7.62M | $6.91M |
| Rank 2of 5 | MED-SR 252-03.95Bridge | MED | Oct 2022 | $2.47M | $2.12M |
| Rank 5of 7 | CUY-IR 77-00.42 Interchange (PART 1 AND PART 2)Pavement | CUY | Oct 2022 | $34.5M | $31.6M |
| Rank 2of 3 | WAS-Marietta Signals/Fiber Ph. 2Signals | WAS | Sep 2022 | $855k | $778k |
| Rank 3of 5 | D12-Lighting Optimization NE OhioSignals | D12 | Aug 2022 | $2.87M | $2.61M |
| Rank 2of 3 | FRA-IR 670-03.31Signals | FRA | Jul 2022 | $3.00M | $2.96M |
| Rank 2of 4 | CUY-IR 480-22.41 DeckBridge | CUY | Jul 2022 | $10.3M | $10.2M |
| Wonof 3 | FRA-IR 670-03.12 Bridge RetrofitBridge | FRA | Jun 2022 | $290k | $290k |
| Rank 3of 4 | MOT-IR 75-VARSignals | MOT | Jun 2022 | $2.37M | $1.90M |
| Rank 4of 9 | D05-Statewide Lighting Optimization SE OhioSignals | D05 | May 2022 | $6.33M | $5.10M |
| Wonof 2 | HAM-SR 264-16.36RBridge | HAM | May 2022 | $214k | $214k |
| Rank 2of 6 | CAR-SR 542-05.61Bridge | CAR | May 2022 | $1.64M | $1.49M |
| Wonof 5 | CAR-SR 43-23.12Bridge | CAR | May 2022 | $1.81M | $1.81M |
| Wonof 3 | CUY-IR 480-21.38 SlopeEarthwork | CUY | May 2022 | $134k | $134k |
| Wonof 3 | GUE-SR 209-08.56Bridge | GUE | May 2022 | $13.4M | $13.4M |
| Rank 2of 5 | FRA-IR 70-22.61 (FEF 1A)Signals | FRA | Apr 2022 | $77.3M | $76.7M |
| Rank 6of 6 | HAS-SR 151-24.96Earthwork | HAS | Apr 2022 | $1.95M | $1.24M |
| Rank 2of 3 | MUS-CR 66A-00.00Bridge | MUS | Apr 2022 | $7.04M | $6.86M |
| Wonof 4 | CUY-LG FY2022Signals | CUY | Apr 2022 | $847k | $847k |
| Wonof 3 | CUY-IR 480-12.07 WB SlideEarthwork | CUY | Mar 2022 | $188k | $188k |
| Rank 5of 6 | CUY-IR 71-05.71 BarrierSafety | CUY | Mar 2022 | $9.60M | $8.53M |
| Wonof 6 | HAS-SR 151-04.85Bridge | HAS | Mar 2022 | $6.84M | $6.84M |
| Wonof 2 | CUY-IR 90-03.56 WB InterchangePavement | CUY | Feb 2022 | $4.34M | $4.34M |
| Wonof 5 | FRA-US 270-06.17Bridge | FRA | Jan 2022 | $1.74M | $1.74M |
| Rank 2of 8 | POR-SR 14-12.96Bridge | POR | Oct 2021 | $3.05M | $3.00M |
| Rank 5of 6 | STA-US 62T/SR 225-01.37/00.59 (PART 1, 2, 3)Bridge | STA | Oct 2021 | $9.10M | $8.20M |
| Rank 3of 6 | CUY-SR 21-09.09 DeckBridge | CUY | Oct 2021 | $4.96M | $4.55M |
| Rank 5of 6 | DEF-US 24-03.20Earthwork | DEF | Oct 2021 | $911k | $711k |
| Rank 2of 6 | FRA-SR 104-05.63Bridge | FRA | Oct 2021 | $2.01M | $1.99M |
| Rank 5of 6 | HAM-IR 71-06.75/07.31Bridge | HAM | Sep 2021 | $901k | $679k |
| Wonof 2 | LUC-IR 475-10.32 Bridge HitBridge | LUC | Sep 2021 | $169k | $169k |
| Rank 2of 4 | CUY-East 75th St BridgeBridge | CUY | Aug 2021 | $6.21M | $6.18M |
| Rank 2of 8 | MOT-IR 75-23.71Other | MOT | Aug 2021 | $375k | $368k |
| Rank 4of 6 | PER-SR 669-09.11Earthwork | PER | Aug 2021 | $118k | $68k |
| Rank 3of 4 | CUY-BH FY2021(B) MiscBridge | CUY | Jul 2021 | $9.88M | $8.67M |
| Rank 2of 4 | CLA-US 68-13.66Bridge | CLA | Jun 2021 | $118k | $86k |
| Wonof 2 | COL-US 30-35.64Bridge | COL | May 2021 | $737k | $737k |
| Rank 2of 3 | MUS-IR 70-10.49Pavement | MUS | May 2021 | $90.5M | $87.6M |
| Wonof 4 | GEA-US 422-00.03 SlideEarthwork | GEA | Apr 2021 | $212k | $212k |
| Rank 2of 5 | LAK-SR 306-05.18 DeckBridge | LAK | Apr 2021 | $4.39M | $4.22M |
| Rank 2of 3 | CUY-BH FY2021(A) Misc (PART 1 AND PART 2)Bridge | CUY | Apr 2021 | $4.87M | $4.34M |
| Rank 2of 3 | RIC-US 30-16.42Bridge | RIC | Apr 2021 | $175k | $145k |
| Wonof 6 | TUS-US 250-20.33Bridge | TUS | Apr 2021 | $1.30M | $1.30M |
| Rank 5of 6 | ALL-US 30-14.93Bridge | ALL | Mar 2021 | $603k | $495k |
| Wonof 3 | CUY-Center Street Swing BridgeBridge | CUY | Mar 2021 | $4.82M | $4.82M |
| Rank 3of 10 | CUY-IR 480-22.41 SubdeckBridge | CUY | Mar 2021 | $191k | $164k |
| Rank 7of 7 | LAW-SR 775-(15.45)(15.70)Bridge | LAW | Mar 2021 | $1.91M | $1.61M |
| Rank 5of 5 | LAW-SR 243-12.76Bridge | LAW | Mar 2021 | $1.58M | $1.27M |
| Rank 2of 7 | BEL-SR 7-11.48Bridge | BEL | Feb 2021 | $9.44M | $7.70M |
| Rank 3of 5 | CUY-IR 90-14.52 DeckBridge | CUY | Feb 2021 | $3.19M | $3.00M |
| Rank 6of 10 | POR-D04 POR IR-76 RA Parking LotsSafety | POR | Jan 2021 | $3.64M | $3.23M |
| Wonof 8 | GEA-US 422-12.26 DeckBridge | GEA | Jan 2021 | $2.47M | $2.47M |
| Rank 2of 4 | LAK-SR 2-01.05 L&RBridge | LAK | Jan 2021 | $9.87M | $9.79M |
| Rank 2of 9 | LOR-IR 90-17.85Bridge | LOR | Jan 2021 | $9.40M | $9.15M |
| Rank 3of 9 | CUY-IR 480-07.27 DeckBridge | CUY | Dec 2020 | $3.56M | $3.41M |
| Rank 3of 10 | MAD-US 62-02.79Bridge | MAD | Dec 2020 | $2.45M | $2.38M |
| Rank 2of 7 | LAK-IR 271-01.27 DeckBridge | LAK | Dec 2020 | $2.24M | $2.01M |
| Rank 3of 8 | MOT-SR 235-00.22LBridge | MOT | Nov 2020 | $3.37M | $3.05M |
| Wonof 3 | LAW-US 52-06.82 & VAR.Bridge | LAW | Nov 2020 | $2.20M | $2.20M |
| Rank 3of 6 | BUT-SR 122D-00.59LBridge | BUT | Oct 2020 | $747k | $622k |
| Rank 3of 9 | MAR-US 23-01.85/02.04Bridge | MAR | Oct 2020 | $5.72M | $5.64M |
| Rank 3of 9 | MAD-SR 29-10.61Bridge | MAD | Oct 2020 | $2.72M | $2.60M |
| Rank 4of 10 | TUS-SR 416-14.81Bridge | TUS | Aug 2020 | $1.64M | $1.32M |
| Rank 4of 4 | CUY-SR 176-10.13 Major RehabPavement | CUY | Jul 2020 | $17.9M | $14.9M |
| Wonof 7 | MOT-IR 75-10.44/10.78Bridge | MOT | Jul 2020 | $17.7M | $17.7M |
| Wonof 8 | MAD-SR 142-13.41 over IR 70Bridge | MAD | Jun 2020 | $2.98M | $2.98M |
| Rank 3of 5 | CUY-IR 480N-00.00 BarrierSafety | CUY | Jun 2020 | $1.40M | $1.22M |
| Wonof 3 | BUT-SR 129-21.39Bridge | BUT | May 2020 | $295k | $295k |
| Rank 6of 7 | MED-SR 162-11.70Drainage | MED | May 2020 | $278k | $198k |
| Rank 2of 3 | CUY-IR 90-13.45 SuperstructureBridge | CUY | May 2020 | $4.38M | $4.36M |
| Rank 2of 4 | RIC-US 30-09.26Pavement | RIC | Apr 2020 | $67.1M | $61.9M |
| Rank 3of 4 | STA-SR 21-21.30Bridge | STA | Apr 2020 | $1.35M | $1.19M |
| Rank 10of 10 | MED-SR 303-13.90/14.96Bridge | MED | Feb 2020 | $2.16M | $1.39M |
| Rank 5of 6 | LIC-SR 37/SR 661-16.59/00.00Pavement | LIC | Feb 2020 | $9.50M | $8.78M |
| Rank 2of 2 | D07-BH FY20 (B)Bridge | D07 | Feb 2020 | $1.26M | $1.01M |
| Rank 2of 7 | SUM-Cleveland Mass. Phase 2/3 (PART 1, PART 2, PART 3)Pavement | SUM | Nov 2018 | $8.46M | $7.98M |
| Rank 3of 7 | MAR-US 23-07.66Bridge | MAR | Nov 2018 | $3.11M | $2.83M |
| Rank 2of 7 | TUS-IR 77-05.27Bridge | TUS | Oct 2018 | $6.62M | $6.17M |
| Wonof 6 | CUY-IR 77-12.12Bridge | CUY | Sep 2018 | $6.07M | $6.07M |
| Rank 5of 5 | SUM-SR 8-07.60 (PART ONE AND PART TWO AND PART THREE)Pavement | SUM | Jul 2018 | $64.5M | $58.7M |
| Rank 8of 8 | MAR-SR 309-19.59Bridge | MAR | May 2018 | $7.84M | $6.33M |
| Rank 10of 10 | MRW-CR 15-05.01Bridge | MRW | Feb 2018 | $1.22M | $1.03M |
| Rank 5of 7 | COS-SR 16/SR 541-08.99/19.10Pavement | COS | Jan 2018 | $19.8M | $18.9M |
Source: public.bid_results, ODOT bid tabs. Bidder strings are normalized to upper-case but not yet entity-resolved, so related firms (e.g. "Shelly Company" vs "Shelly & Sands") are shown separately.