Ohio DOT · bid history
Showing the 300 most recent of 863 bids. Stats above reflect the full history.
| Result | Project | County | Let | Their bid | Winning bid |
|---|---|---|---|---|---|
| Rank 3of 5 | ROS-Tar Hollow SF PVPavement | ROS | Apr 2026 | $335k | $279k |
| Rank 2of 5 | POR-US 224-00.00Pavement | POR | Apr 2026 | $12.1M | $11.0M |
| Wonof 4 | FAI-SR 204-04.30Signals | FAI | Apr 2026 | $2.14M | $2.14M |
| Rank 2of 5 | SUM-SR 261-00.00/VARPavement | SUM | Apr 2026 | $3.78M | $3.56M |
| Wonof 3 | PER-TR 358-00.00 (THORN TWP)Safety | PER | Apr 2026 | $422k | $422k |
| Rank 2of 2 | COL-US 30-19.05Pavement | COL | Apr 2026 | $15.0M | $14.3M |
| Wonof 2 | LIC-SR 37-04.09Signals | LIC | Apr 2026 | $1.61M | $1.61M |
| Wonof 2 | PIC-US 23-16.94Pavement | PIC | Apr 2026 | $595k | $595k |
| Wonof 1 | SCI-US 52-21.80Pavement | SCI | Apr 2026 | $1.36M | $1.36M |
| Rank 3of 5 | STA-SR 241-14.58 (SRTS)Safety | STA | Mar 2026 | $480k | $395k |
| Wonof 2 | LAW-US 52-21.52Signals | LAW | Mar 2026 | $2.11M | $2.11M |
| Rank 2of 2 | WOO-SR 25-06.64 Resurface PortagePavement | WOO | Mar 2026 | $1.23M | $1.17M |
| Rank 3of 3 | MAH-IR 76/IR 80-08.50/00.00Pavement | MAH | Mar 2026 | $23.7M | $21.1M |
| Wonof 3 | LAW-SR 141/CR 7E-02.45Signals | LAW | Mar 2026 | $258k | $258k |
| Wonof 5 | STA-SR 93/VAR-19.26/VARPavement | STA | Mar 2026 | $2.80M | $2.80M |
| Rank 5of 5 | MAD-US 42-07.14,MAD-SR 38-12.40/31.74Pavement | MAD | Mar 2026 | $1.52M | $1.28M |
| Rank 2of 2 | SHE-PAVE-FY26Pavement | SHE | Mar 2026 | $6.09M | $5.00M |
| Rank 2of 3 | DEL-IR 71-SP-FY2026 (Priority)Pavement | DEL | Feb 2026 | $2.18M | $1.84M |
| Rank 7of 7 | CUY-SR 87-14.72Pavement | CUY | Feb 2026 | $872k | $669k |
| Wonof 3 | MEG-SR 124-09.20Pavement | MEG | Feb 2026 | $575k | $575k |
| Rank 4of 4 | HOL-SR 179-00.00Pavement | HOL | Feb 2026 | $3.84M | $3.06M |
| Rank 3of 5 | PIC-US 23-18.52Safety | PIC | Feb 2026 | $351k | $302k |
| Wonof 2 | PER-SR 669-00.00Pavement | PER | Feb 2026 | $821k | $821k |
| Rank 4of 5 | POR-SR 82/SR 306-02.37/00.00Pavement | POR | Feb 2026 | $2.15M | $1.79M |
| Wonof 2 | HAR-SR 235-02.39Pavement | HAR | Feb 2026 | $1.55M | $1.55M |
| Rank 4of 4 | MAH-IR 680-04.58 (PART 1 AND PART 2)Pavement | MAH | Feb 2026 | $73.6M | $55.8M |
| Rank 4of 4 | PIK-SR 32-09.27/09.96 (Safety)Signals | PIK | Jan 2026 | $2.56M | $2.23M |
| Rank 3of 3 | CHP-SR 55-15.02Pavement | CHP | Jan 2026 | $476k | $462k |
| Wonof 3 | CAR-SR 39-23.34Pavement | CAR | Jan 2026 | $5.39M | $5.39M |
| Rank 4of 8 | LAK-SR 174-00.00Pavement | LAK | Jan 2026 | $1.79M | $1.73M |
| Rank 6of 7 | LAK-SR 84/VAR-18.21/VARPavement | LAK | Jan 2026 | $1.77M | $1.13M |
| Rank 4of 5 | POR-SR 82/VAR-10.64/VARPavement | POR | Jan 2026 | $4.47M | $4.05M |
| Wonof 1 | LOG-PAVE-FY26Pavement | LOG | Jan 2026 | $5.37M | $5.37M |
| Wonof 1 | UNI-SR 31-15.55, UNI-SR 347-03.89Pavement | UNI | Jan 2026 | $2.91M | $2.91M |
| Rank 2of 3 | UNI-US 42-SP-FY2026 (GENERAL)Pavement | UNI | Jan 2026 | $550k | $528k |
| Wonof 1 | LAW-SR 775/SR 790-18.51/00.00Pavement | LAW | Jan 2026 | $1.34M | $1.34M |
| Wonof 2 | PAU-SR 49/SR 500/SR 613-VariesPavement | PAU | Jan 2026 | $1.60M | $1.60M |
| Wonof 3 | D07-CHIP-FY26 (B)Pavement | D07 | Dec 2025 | $1.91M | $1.91M |
| Rank 2of 5 | ROS-SR 138-00.26Pavement | ROS | Dec 2025 | $644k | $640k |
| Rank 3of 3 | CUY-IR 71-00.00Pavement | CUY | Dec 2025 | $5.60M | $4.72M |
| Rank 3of 3 | DEL-SR 229-00.12Pavement | DEL | Dec 2025 | $1.90M | $1.69M |
| Rank 2of 3 | ROS-US 50-04.00/25.27Pavement | ROS | Dec 2025 | $2.36M | $2.20M |
| Rank 7of 7 | LAK-SR 174-04.39Pavement | LAK | Dec 2025 | $1.14M | $747k |
| Rank 5of 6 | LAK-US 20-17.13Pavement | LAK | Dec 2025 | $1.12M | $901k |
| Rank 3of 4 | TRU-US 62-04.56Pavement | TRU | Dec 2025 | $4.67M | $4.11M |
| Rank 4of 4 | MAD-IR 70-00.00Pavement | MAD | Dec 2025 | $12.1M | $9.13M |
| Rank 3of 3 | WOO-IR 75/IR 475-24.85/00.00 Resurf (PART 1 AND PART 2)Pavement | WOO | Dec 2025 | $14.9M | $11.0M |
| Rank 2of 2 | PIC-SR-SR 188-02.56Pavement | PIC | Dec 2025 | $1.55M | $1.39M |
| Wonof 3 | MAH-US 224/SR 534-00.00/08.46Pavement | MAH | Dec 2025 | $4.60M | $4.60M |
| Rank 3of 7 | ROS-CR 550-17.12 (Safety)Signals | ROS | Dec 2025 | $585k | $497k |
| Rank 2of 2 | CLA-PAVE-FY26 (A)Pavement | CLA | Dec 2025 | $3.10M | $2.88M |
| Wonof 1 | GAL-SR 325-00.00Pavement | GAL | Nov 2025 | $4.29M | $4.29M |
| Rank 3of 3 | CLE-US CHIP FY2026Pavement | CLE | Nov 2025 | $764k | $624k |
| Rank 2of 2 | ALL-SR 66-02.38Pavement | ALL | Nov 2025 | $1.88M | $1.56M |
| Rank 3of 3 | STA-US 30/VAR-13.15/VAR (PART 1 AND PART 2)Pavement | STA | Nov 2025 | $14.1M | $12.9M |
| Rank 2of 2 | D07-CHIP-FY26 (A)Pavement | D07 | Nov 2025 | $2.06M | $1.92M |
| Rank 2of 3 | MUS-US 22/SR 83-26.63/00.00Pavement | MUS | Nov 2025 | $5.84M | $5.77M |
| Rank 2of 3 | KNO-US 62/SR 205-14.32/00.00Pavement | KNO | Nov 2025 | $4.54M | $3.94M |
| Wonof 7 | FRA-EXPO CENTER/OHC-FY2026Pavement | FRA | Oct 2025 | $1.02M | $1.02M |
| Wonof 3 | MUS-/LIC-IR 70-00.76/28.91Pavement | MUS | Oct 2025 | $6.00M | $6.00M |
| Wonof 4 | HAN-SR 37-06.47Pavement | HAN | Oct 2025 | $2.48M | $2.48M |
| Wonof 5 | WAR-SR 123-09.66Pavement | WAR | Oct 2025 | $499k | $499k |
| Wonof 2 | GUE-/GUE-SR 93/SR 541/SR 658 VARPavement | GUE | Oct 2025 | $1.57M | $1.57M |
| Rank 5of 5 | GEA-SR 88/US 422-02.05/15.52Pavement | GEA | Oct 2025 | $2.09M | $1.60M |
| Rank 2of 2 | DAR-PAVE-FY26Pavement | DAR | Oct 2025 | $4.91M | $4.26M |
| Wonof 3 | TUS-SR 39-02.96Pavement | TUS | Oct 2025 | $1.96M | $1.96M |
| Wonof 4 | WOO-/SAN-US 20/US 65-00.00/19.38 ResPavement | WOO | Oct 2025 | $4.39M | $4.39M |
| Wonof 2 | VAN-/PAU-US 127-12.34/00.00 (PART 1 AND PART 2)Pavement | VAN | Oct 2025 | $4.08M | $4.08M |
| Rank 3of 3 | WYA-SR 53-15.36Pavement | WYA | Oct 2025 | $1.71M | $1.47M |
| Wonof 1 | VAN-SR 116/SR 117/SR 697-Var.Pavement | VAN | Oct 2025 | $2.03M | $2.03M |
| Rank 3of 3 | HOL-/TUS-US 62/US 39-VARPavement | HOL | Oct 2025 | $5.97M | $5.09M |
| Wonof 1 | MER-/AUG-PAVE-FY26Pavement | MER | Oct 2025 | $9.39M | $9.39M |
| Wonof 1 | LAW-SR 141-00.98Pavement | LAW | Oct 2025 | $1.79M | $1.79M |
| Wonof 3 | CLA-PAVE-FY26 (B)Pavement | CLA | Sep 2025 | $4.77M | $4.77M |
| Rank 2of 3 | MUS-SR 60-08.03Pavement | MUS | Sep 2025 | $3.95M | $3.24M |
| Wonof 2 | ADA-SR 32-00.00Safety | ADA | Sep 2025 | $4.02M | $4.02M |
| Rank 2of 4 | COL-SR 39/SR 45-13.06/00.37Pavement | COL | Sep 2025 | $1.39M | $1.35M |
| Wonof 2 | D10-Chip Seal FY 2026 SouthPavement | D10 | Sep 2025 | $2.34M | $2.34M |
| Wonof 2 | LIC-SR 13-11.11Pavement | LIC | Sep 2025 | $4.81M | $4.81M |
| Rank 3of 4 | CLA-Clark Lake WLFPavement | CLA | Sep 2025 | $240k | $227k |
| Rank 2of 3 | STA-US 62-36.42/38.60Pavement | STA | Sep 2025 | $1.69M | $1.62M |
| Wonof 2 | SCI-US 52-00.00Pavement | SCI | Sep 2025 | $698k | $698k |
| Rank 3of 4 | TRU-SR 193-00.00Pavement | TRU | Aug 2025 | $1.31M | $1.05M |
| Rank 2of 2 | FAI-/LIC-SR 158-07.63/00.00Pavement | FAI | Aug 2025 | $2.82M | $2.75M |
| Wonof 2 | D10-Chip Seal FY 2026 NorthPavement | D10 | Aug 2025 | $1.72M | $1.72M |
| Rank 2of 3 | BRO-US 50-00.00Pavement | BRO | Aug 2025 | $1.33M | $1.18M |
| Rank 4of 4 | POR-IR 76-09.73Pavement | POR | Jul 2025 | $11.1M | $9.96M |
| Rank 2of 5 | FRA-US 33-28.61Signals | FRA | Jul 2025 | $256k | $256k |
| Wonof 2 | LAW-SR 522-00.00Pavement | LAW | Jul 2025 | $657k | $657k |
| Rank 3of 4 | TRU-SR 193-17.77Pavement | TRU | Jul 2025 | $1.69M | $1.51M |
| Rank 3of 3 | JAC-SR 93-04.67Pavement | JAC | Jul 2025 | $1.15M | $947k |
| Rank 2of 3 | MAH-IR 680-12.12Pavement | MAH | Jul 2025 | $4.31M | $4.23M |
| Wonof 5 | SCI-Shawnee State ODNR FY26Pavement | SCI | Jul 2025 | $389k | $389k |
| Rank 5of 8 | SUM-SR 21-19.57/VARPavement | SUM | Jul 2025 | $1000k | $812k |
| Wonof 1 | SCI-US 52-15.81Pavement | SCI | Jun 2025 | $2.85M | $2.85M |
| Rank 4of 4 | LAK-SR 84-01.00Pavement | LAK | Jun 2025 | $2.83M | $2.50M |
| Wonof 1 | PER-CR 22-00.00Pavement | PER | Jun 2025 | $1.39M | $1.39M |
| Rank 5of 5 | TRU-Elmwood Dr (Hubbard)Pavement | TRU | Jun 2025 | $535k | $443k |
| Rank 3of 3 | MED-SR 18/SR 57-15.05/17.807Pavement | MED | Jun 2025 | $2.70M | $2.38M |
| Wonof 6 | UNI-US 42-03.91Pavement | UNI | May 2025 | $7.96M | $7.96M |
| Wonof 3 | FRA-IR 70-15.52Pavement | FRA | May 2025 | $7.37M | $7.37M |
| Wonof 1 | SCI-SR 125/SR 772-06.25/00.00Pavement | SCI | May 2025 | $2.16M | $2.16M |
| Rank 3of 4 | TUS-US 250-12.79Pavement | TUS | May 2025 | $5.65M | $5.03M |
| Wonof 3 | D05-Spot Paving FY2026Pavement | D05 | May 2025 | $1.48M | $1.48M |
| Wonof 2 | STA-IR 77-00.00Pavement | STA | May 2025 | $4.33M | $4.33M |
| Wonof 3 | LAK-SR 2-14.38Pavement | LAK | May 2025 | $3.77M | $3.77M |
| Rank 4of 4 | SUM-SR 241-01.50/VARPavement | SUM | May 2025 | $3.32M | $2.67M |
| Rank 2of 4 | CUY-IR 90-06.69 Major RehabPavement | CUY | May 2025 | $173.4M | $168.3M |
| Rank 4of 4 | CAR-Magnolia SidewalksSafety | CAR | Apr 2025 | $611k | $520k |
| Rank 2of 3 | PIK-SR 772-19.00Pavement | PIK | Apr 2025 | $1.24M | $1.04M |
| Wonof 6 | DEL-SR 315-05.66 at Hyatts RdSignals | DEL | Apr 2025 | $2.76M | $2.76M |
| Rank 3of 3 | TRU-N River Rd Parking LotPavement | TRU | Apr 2025 | $322k | $204k |
| Rank 2of 2 | ROS-US 35-34.22Pavement | ROS | Apr 2025 | $2.61M | $2.19M |
| Wonof 5 | TUS-Heritage Drive SidewalksSafety | TUS | Mar 2025 | $675k | $675k |
| Rank 4of 4 | FAY-SR-SR 41/VAR-22.18/VARPavement | FAY | Mar 2025 | $1.55M | $1.20M |
| Rank 3of 5 | GEA-Punderson State ParkPavement | GEA | Mar 2025 | $882k | $828k |
| Rank 3of 3 | TUS-Gnadenhutten StreetscapeSafety | TUS | Mar 2025 | $1.28M | $1.26M |
| Rank 2of 6 | TUS-New Phila Paving Phase 2Pavement | TUS | Mar 2025 | $982k | $863k |
| Wonof 1 | D10-Chip Seal FY 2025 SouthPavement | D10 | Mar 2025 | $675k | $675k |
| Rank 2of 2 | CHP-US 68-06.93Pavement | CHP | Feb 2025 | $2.48M | $2.42M |
| Wonof 4 | ROS-Great Seal SP PVPavement | ROS | Feb 2025 | $158k | $158k |
| Rank 3of 4 | DAR-Shawnee Prairie Preserve PvgPavement | DAR | Feb 2025 | $72k | $34k |
| Rank 2of 2 | MAH-River/McGaffney/JacksonPavement | MAH | Feb 2025 | $1.68M | $1.47M |
| Rank 3of 10 | LIC-CR 134-02.06Pavement | LIC | Feb 2025 | $2.57M | $2.45M |
| Wonof 4 | MAH-SR 14/SR 165-00.00/01.67Pavement | MAH | Feb 2025 | $3.86M | $3.86M |
| Rank 3of 3 | WYA-East Wyandot Ave.Pavement | WYA | Feb 2025 | $876k | $825k |
| Rank 3of 3 | SUM-IR 77-24.12Pavement | SUM | Feb 2025 | $57.0M | $52.4M |
| Rank 3of 3 | GEA-SR 44-00.00Pavement | GEA | Feb 2025 | $840k | $800k |
| Wonof 4 | COL-ODNR GUILFORD LAKE STATE PARPavement | COL | Feb 2025 | $986k | $986k |
| Rank 3of 3 | SEN-US 23/SR 12-09.98/04.18 ResurfPavement | SEN | Feb 2025 | $4.57M | $4.13M |
| Wonof 3 | CLA-US 68-04.43Pavement | CLA | Feb 2025 | $7.09M | $7.09M |
| Rank 2of 2 | SHE-PAVE-FY25Pavement | SHE | Feb 2025 | $2.98M | $2.88M |
| Wonof 2 | CHP-PAVE-FY25Pavement | CHP | Feb 2025 | $1.06M | $1.06M |
| Wonof 5 | PIC-SR 762-11.18Pavement | PIC | Feb 2025 | $1.97M | $1.97M |
| Rank 3of 3 | MAH-US 422/SR 616-07.58/03.81Pavement | MAH | Feb 2025 | $2.74M | $2.07M |
| Wonof 2 | MUS-SR 208-00.00 (PART 1 AND PART 2)Pavement | MUS | Feb 2025 | $9.64M | $9.64M |
| Wonof 2 | COS-CR 621-00.00Safety | COS | Jan 2025 | $2.36M | $2.36M |
| Wonof 5 | FAI-SR 204-02.28Signals | FAI | Jan 2025 | $842k | $842k |
| Rank 2of 5 | ROS-Scioto Trail SF PVPavement | ROS | Jan 2025 | $255k | $249k |
| Wonof 4 | SUM-SR-SR 8-15.75Pavement | SUM | Jan 2025 | $6.72M | $6.72M |
| Rank 2of 5 | MAD-SR-SR 56-00.00Pavement | MAD | Jan 2025 | $1.33M | $1.24M |
| Wonof 3 | DEL-US-US 36-07.39Pavement | DEL | Jan 2025 | $1.69M | $1.69M |
| Wonof 4 | HOL-SR 515-00.00 (PART 1 AND PART 2)Pavement | HOL | Jan 2025 | $5.85M | $5.85M |
| Wonof 2 | PIK-US 23-00.00Pavement | PIK | Jan 2025 | $2.53M | $2.53M |
| Rank 2of 2 | DAR-SR 118/SR 705-01.85/00.00Pavement | DAR | Dec 2024 | $2.57M | $2.39M |
| Wonof 5 | D07-CHIP-FY25 (B)Pavement | D07 | Dec 2024 | $1.03M | $1.03M |
| Rank 2of 6 | FRA-US 33-06.15 (at Hayden Run Rd)Pavement | FRA | Dec 2024 | $1.63M | $1.56M |
| Rank 2of 4 | BUT-/PRE CHIP FY2025Pavement | BUT | Dec 2024 | $955k | $879k |
| Rank 4of 5 | TRU-SR 45-23.76Pavement | TRU | Dec 2024 | $1.34M | $1.15M |
| Wonof 3 | CUY-IR 271-09.28 Safety (PART 1 AND PART 2)Safety | CUY | Dec 2024 | $15.9M | $15.9M |
| Rank 2of 3 | MED-IR 71-15.79Pavement | MED | Dec 2024 | $12.5M | $11.7M |
| Wonof 1 | MEG-SR 7-18.62 ATH-SR 7-00.00Pavement | MEG | Dec 2024 | $4.20M | $4.20M |
| Rank 3of 4 | SUM-SR 8-02.91Pavement | SUM | Dec 2024 | $8.50M | $7.59M |
| Rank 3of 4 | ADA-SR 348-00.00Safety | ADA | Dec 2024 | $2.63M | $2.39M |
| Rank 2of 2 | LUC-SR 64-08.94Pavement | LUC | Dec 2024 | $3.79M | $3.58M |
| Rank 2of 5 | SUM-SR 82-00.14/08.04Pavement | SUM | Nov 2024 | $2.93M | $2.74M |
| Rank 3of 4 | HIG-SR 73/SR 785-10.72/00.00Pavement | HIG | Nov 2024 | $3.45M | $3.19M |
| Wonof 1 | D10-Chip Seal FY 2025 NorthPavement | D10 | Nov 2024 | $469k | $469k |
| Rank 3of 5 | COL-SR-SR 9/VAR-14.72/VARPavement | COL | Nov 2024 | $876k | $811k |
| Wonof 3 | LAW-SR 93-01.90-SafetySignals | LAW | Nov 2024 | $578k | $578k |
| Rank 4of 5 | MEG-SR 7-05.28Signals | MEG | Oct 2024 | $320k | $288k |
| Rank 3of 4 | TUS-US 39-15.45Pavement | TUS | Oct 2024 | $1.46M | $1.32M |
| Rank 3of 7 | HIG-US 50/US 62-Hillsboro SafetySafety | HIG | Oct 2024 | $371k | $248k |
| Rank 2of 2 | WYA-US 23-23.16Pavement | WYA | Oct 2024 | $1.29M | $1.06M |
| Wonof 1 | COS-/MUS-SR 16/SR 83-11.74/12.75Pavement | COS | Oct 2024 | $5.38M | $5.38M |
| Rank 5of 5 | TRU-SR 7/SR 7D-08.74/00.00Pavement | TRU | Oct 2024 | $1.76M | $1.50M |
| Rank 6of 9 | COS-CR 271-06.26Signals | COS | Oct 2024 | $502k | $429k |
| Rank 5of 7 | MED-IR 76-11.83Signals | MED | Oct 2024 | $415k | $295k |
| Wonof 1 | FAI-SR 159-00.00Pavement | FAI | Oct 2024 | $2.56M | $2.56M |
| Rank 2of 4 | WAY-US 30-19.469Pavement | WAY | Oct 2024 | $3.94M | $3.56M |
| Wonof 1 | ALL-IR 75/SR 117/SR 309-VAR.Pavement | ALL | Oct 2024 | $2.78M | $2.78M |
| Wonof 2 | AUG-SR 65-00.00Pavement | AUG | Oct 2024 | $1.24M | $1.24M |
| Rank 3of 3 | WYA-US-US 23/US 30-10.26/09.12Pavement | WYA | Oct 2024 | $8.23M | $6.81M |
| Wonof 1 | UNI-SR 38-00.30Pavement | UNI | Sep 2024 | $2.15M | $2.15M |
| Rank 2of 3 | COL-SR 46/VAR-00.00/VARPavement | COL | Sep 2024 | $3.33M | $3.32M |
| Rank 4of 4 | ADA-SR 125/SR 247-09.22/00.35Safety | ADA | Sep 2024 | $3.39M | $2.51M |
| Wonof 1 | LAW-SR 141-08.40Pavement | LAW | Sep 2024 | $2.28M | $2.28M |
| Wonof 2 | PAU-/DEF-SR 49-06.94/00.00Pavement | PAU | Sep 2024 | $3.01M | $3.01M |
| Wonof 2 | ALL-SR 65-00.00/03.94Pavement | ALL | Sep 2024 | $1.10M | $1.10M |
| Rank 3of 7 | MEG-Middleport Streetscape Ph 1Safety | MEG | Sep 2024 | $1.75M | $1.69M |
| Wonof 3 | WOO-SR 582-05.43/10.24 ResurfPavement | WOO | Sep 2024 | $2.50M | $2.50M |
| Rank 5of 6 | TUS-SR 516-03.70Pavement | TUS | Sep 2024 | $1.16M | $1.07M |
| Rank 3of 3 | TRU-SR 11-09.97Pavement | TRU | Aug 2024 | $3.40M | $2.73M |
| Rank 2of 2 | ROS-US 23-01.95Pavement | ROS | Aug 2024 | $2.64M | $2.44M |
| Wonof 1 | MER-SR 707-00.68Pavement | MER | Jul 2024 | $472k | $472k |
| Rank 4of 4 | COS-CR 12-09.26 Buggy LanePavement | COS | Jul 2024 | $289k | $192k |
| Rank 3of 4 | STA-SR 172-03.94Pavement | STA | Jul 2024 | $1.73M | $1.57M |
| Rank 2of 2 | STA-SR 21-17.35Pavement | STA | Jul 2024 | $3.76M | $3.50M |
| Rank 3of 3 | BRO-US 68-17.68Pavement | BRO | Jul 2024 | $1.53M | $1.12M |
| Rank 3of 3 | BRO-SR 505/SR 756-06.72/00.00Pavement | BRO | Jul 2024 | $1.35M | $964k |
| Rank 4of 5 | POR-SR 225-11.04Pavement | POR | Jul 2024 | $1.83M | $1.61M |
| Wonof 3 | LAK-SR 44-04.14Pavement | LAK | Jun 2024 | $3.19M | $3.19M |
| Rank 2of 2 | HOC-SR 374-00.00Pavement | HOC | Jun 2024 | $1.18M | $1.17M |
| Wonof 1 | MER-PAVE-FY25Pavement | MER | Jun 2024 | $8.05M | $8.05M |
| Wonof 1 | PER-CR 30/VAR-03.33/VAR (RESURF)Pavement | PER | Jun 2024 | $2.00M | $2.00M |
| Wonof 1 | GAL-SR 7-10.12Pavement | GAL | Jun 2024 | $4.29M | $4.29M |
| Rank 2of 3 | FRA-IR 70-00.71Pavement | FRA | Jun 2024 | $2.19M | $2.01M |
| Rank 2of 2 | STA-SR 43/SR 172-14.40/VARPavement | STA | Jun 2024 | $4.33M | $3.86M |
| Wonof 2 | D05-Spot Paving FY2025Pavement | D05 | Jun 2024 | $892k | $892k |
| Rank 3of 3 | SUM-IR 76/IR 277-05.90/00.00Pavement | SUM | Jun 2024 | $9.51M | $8.21M |
| Rank 4of 4 | TRU-SR 534-19.12Pavement | TRU | May 2024 | $1.87M | $1.50M |
| Wonof 1 | LAW-SR 7-02.44Pavement | LAW | May 2024 | $5.92M | $5.92M |
| Rank 2of 3 | D06-SP FY2024 GeneralPavement | D06 | May 2024 | $898k | $870k |
| Wonof 2 | FAI-ODNR Buckeye Lake State ParkPavement | FAI | May 2024 | $250k | $250k |
| Rank 3of 3 | D04-SP FY2024 (West)Pavement | D04 | May 2024 | $1.31M | $1.07M |
| Rank 4of 4 | MED-SR 94-07.64Pavement | MED | May 2024 | $620k | $467k |
| Wonof 6 | MEG-US 33-19.00Pavement | MEG | May 2024 | $3.47M | $3.47M |
| Wonof 4 | STA-Middle Branch TrailSafety | STA | May 2024 | $611k | $611k |
| Rank 2of 2 | ROS-US 50-19.35Pavement | ROS | Apr 2024 | $3.25M | $3.20M |
| Rank 3of 3 | TRU-SR 46/46D-15.08/00.00Pavement | TRU | Apr 2024 | $1.42M | $1.21M |
| Rank 4of 4 | D04-SP FY2024 (East)Pavement | D04 | Apr 2024 | $1.85M | $1.18M |
| Wonof 3 | CUY-Quigley Rd/West 3rd StPavement | CUY | Apr 2024 | $3.18M | $3.18M |
| Rank 2of 2 | LIC-SR 16-00.00Pavement | LIC | Apr 2024 | $7.61M | $7.53M |
| Wonof 2 | PIC-US 23-12.89 Part 1, 2 & 3Signals | PIC | Mar 2024 | $5.58M | $5.58M |
| Wonof 3 | CUY-/LAK-IR 271X-07.42/00.00Pavement | CUY | Mar 2024 | $6.25M | $6.25M |
| Wonof 2 | WOO-SR 18/SR 235-05.55/00.00 ResurfPavement | WOO | Mar 2024 | $1.14M | $1.14M |
| Wonof 3 | COL-SR 39-02.61Pavement | COL | Mar 2024 | $8.21M | $8.21M |
| Rank 6of 6 | LAK-US 6-00.44Pavement | LAK | Mar 2024 | $1.33M | $1.14M |
| Rank 4of 4 | SCI-Shawnee SF LodgePavement | SCI | Mar 2024 | $908k | $737k |
| Rank 3of 4 | TRU-SR 46/SR 169-03.73/04.58Pavement | TRU | Mar 2024 | $1.75M | $1.58M |
| Wonof 3 | STA-US 62/SR 183-38.97/16.33Pavement | STA | Mar 2024 | $1.98M | $1.98M |
| Rank 2of 4 | COL-SR 170-00.13Signals | COL | Mar 2024 | $666k | $640k |
| Rank 2of 4 | TRU-US 422/SR 5-02.05/06.43Pavement | TRU | Feb 2024 | $5.52M | $5.34M |
| Rank 2of 3 | LAK-SR 640-00.00Pavement | LAK | Feb 2024 | $4.26M | $3.50M |
| Wonof 3 | SAN-US 6-00.00 ResurfPavement | SAN | Feb 2024 | $3.99M | $3.99M |
| Wonof 2 | PIC-SR 56-19.61Pavement | PIC | Feb 2024 | $995k | $995k |
| Rank 4of 5 | LIC-TR 171-01.34 (Multiuse Path)Safety | LIC | Feb 2024 | $1.21M | $864k |
| Rank 2of 6 | LIC-SR 661-01.64Signals | LIC | Feb 2024 | $2.16M | $2.14M |
| Wonof 2 | WOO-/OTT-SR 795-02.35/00.00 ResurfPavement | WOO | Feb 2024 | $6.59M | $6.59M |
| Rank 3of 3 | UNI-US 33-08.72Pavement | UNI | Feb 2024 | $6.49M | $4.37M |
| Wonof 1 | MER-SR 119/SR 219-08.53/14.01Pavement | MER | Feb 2024 | $3.62M | $3.62M |
| Wonof 2 | ROS-US 23-18.35Pavement | ROS | Feb 2024 | $2.14M | $2.14M |
| Rank 2of 2 | UNI-SR 37-06.34Pavement | UNI | Feb 2024 | $1.19M | $1.06M |
| Rank 2of 7 | WAY-US 30-11.64Pavement | WAY | Feb 2024 | $1.23M | $1.14M |
| Rank 6of 6 | WYA-US 23-Rest AreasPavement | WYA | Jan 2024 | $5.65M | $5.24M |
| Rank 5of 6 | LAK-Liberty StreetPavement | LAK | Jan 2024 | $1.42M | $970k |
| Wonof 3 | COL-SR 7-03.56Pavement | COL | Jan 2024 | $1.79M | $1.79M |
| Rank 7of 7 | CUY-US 6-26.65Pavement | CUY | Jan 2024 | $2.11M | $1.60M |
| Rank 2of 2 | ROS-SR 28/SR 207/SR 372/SR 772/SR 104-06.00/01.00Pavement | ROS | Jan 2024 | $5.30M | $5.04M |
| Wonof 1 | VAN-US 127/SR 49-00.00/05.42Pavement | VAN | Jan 2024 | $2.53M | $2.53M |
| Rank 2of 4 | SCI-Shawnee SF HQPavement | SCI | Jan 2024 | $823k | $768k |
| Rank 2of 3 | MED-IR 271-00.00Pavement | MED | Jan 2024 | $7.88M | $7.63M |
| Wonof 1 | VAN-CR 418-02.84Pavement | VAN | Jan 2024 | $2.25M | $2.25M |
| Wonof 3 | JEF-SR 152-06.45Pavement | JEF | Jan 2024 | $764k | $764k |
| Rank 2of 2 | PIK-SR 220-08.28Pavement | PIK | Jan 2024 | $1.34M | $1.18M |
| Wonof 1 | LOG-PAVE-FY24Pavement | LOG | Jan 2024 | $2.93M | $2.93M |
| Wonof 5 | LIC-SR 13-00.42Signals | LIC | Jan 2024 | $738k | $738k |
| Rank 4of 5 | MED-/WAY-SR 83/SR 585-00.91/11.98Pavement | MED | Jan 2024 | $1.59M | $1.29M |
| Rank 4of 4 | PER-CR 99-00.00 SRTSSafety | PER | Jan 2024 | $342k | $304k |
| Rank 7of 7 | SUM-SR 18-01.01Pavement | SUM | Jan 2024 | $2.52M | $1.90M |
| Wonof 1 | AUG-SR 196/SR 197/SR 198-VARPavement | AUG | Jan 2024 | $2.44M | $2.44M |
| Wonof 2 | SHE-SR 29-00.00Pavement | SHE | Jan 2024 | $1.38M | $1.38M |
| Rank 5of 8 | POR-Frost Rd Ph 2 (Streetsboro)Pavement | POR | Dec 2023 | $598k | $497k |
| Rank 3of 3 | ADA-/BRO-SR 41-07.46/00.00Safety | ADA | Dec 2023 | $7.14M | $5.36M |
| Wonof 1 | PER-SR 93-00.00Pavement | PER | Dec 2023 | $10.3M | $10.3M |
| Wonof 4 | CUY-SR 17-12.58Pavement | CUY | Dec 2023 | $2.26M | $2.26M |
| Rank 2of 3 | COL-US 30-12.79, COL-SR 11-10.82Pavement | COL | Nov 2023 | $2.69M | $2.66M |
| Wonof 2 | PUT-/ALL/HAN-SR 12/SR 115/SR 613-00.00Pavement | PUT | Nov 2023 | $3.95M | $3.95M |
| Wonof 3 | CUY-IR 71/IR 90-14.66/14.94Pavement | CUY | Nov 2023 | $9.83M | $9.83M |
| Wonof 1 | UNI-SR 245/SR 161-00.03/00.64Pavement | UNI | Nov 2023 | $4.21M | $4.21M |
| Rank 3of 5 | D07-CHIP-FY24 (A)Pavement | D07 | Nov 2023 | $1.09M | $1.03M |
| Rank 4of 4 | CUY-Antenucci BoulevardPavement | CUY | Nov 2023 | $1.40M | $1.06M |
| Rank 3of 3 | STA-US 62/SR 93-00.93/08.82Pavement | STA | Nov 2023 | $1.67M | $1.49M |
| Rank 2of 4 | D07-CHIP-FY24 (B)Pavement | D07 | Nov 2023 | $1.81M | $1.71M |
| Rank 2of 3 | HAN-/WYA-US 30-12.22/00.00Pavement | HAN | Nov 2023 | $5.56M | $5.55M |
| Rank 3of 7 | ROS-US 23-06.63 (Trego Creek Safety)Safety | ROS | Nov 2023 | $1.54M | $1.40M |
| Rank 4of 4 | SEN-SR 18-02.45/08.94 ResurfPavement | SEN | Nov 2023 | $5.18M | $4.13M |
| Wonof 3 | BEL-SR 145-00.00Pavement | BEL | Nov 2023 | $559k | $559k |
| Wonof 2 | D10-Chip Seal FY 2024 NorthPavement | D10 | Oct 2023 | $3.65M | $3.65M |
| Wonof 2 | D10-Chip Seal FY2024 SouthPavement | D10 | Oct 2023 | $1.05M | $1.05M |
| Wonof 3 | FAY-/MAD-SR 41-24.45/00.00Pavement | FAY | Oct 2023 | $2.34M | $2.34M |
| Rank 2of 2 | WOO-/LUC-IR 280-06.2/00.00 ResurfPavement | WOO | Oct 2023 | $14.3M | $13.9M |
| Wonof 1 | SCI-US 23/SR 728-02.67/00.00Pavement | SCI | Oct 2023 | $4.82M | $4.82M |
| Wonof 2 | LIC-IR 70/SR 37-09.55/24.42Pavement | LIC | Oct 2023 | $13.4M | $13.4M |
| Rank 2of 5 | TRU-SR 5-14.36Pavement | TRU | Oct 2023 | $1.62M | $1.51M |
| Wonof 2 | VAN-US 224-16.08Pavement | VAN | Oct 2023 | $2.38M | $2.38M |
| Wonof 2 | HOC-SR 664-15.88Pavement | HOC | Oct 2023 | $2.36M | $2.36M |
| Wonof 3 | CUY-IR 480-10.38Pavement | CUY | Sep 2023 | $4.13M | $4.13M |
| Rank 2of 2 | JAC-SR 93-00.00Pavement | JAC | Sep 2023 | $1.45M | $1.29M |
| Rank 2of 3 | CAR-SR 39-10.23, CAR-SR 43-16.31Pavement | CAR | Sep 2023 | $3.19M | $3.19M |
| Rank 4of 4 | LAW-US 52-13.59 (Safety)Signals | LAW | Sep 2023 | $538k | $497k |
| Rank 2of 2 | PIK-US 23-13.42Pavement | PIK | Sep 2023 | $2.69M | $2.50M |
| Rank 3of 3 | CUY-IR 271-06.13Pavement | CUY | Sep 2023 | $6.60M | $6.23M |
| Wonof 3 | COL-SR 164/SR 644-15.72/03.96Pavement | COL | Sep 2023 | $2.75M | $2.75M |
| Wonof 2 | LIC-SR 16/SR 79-20.26/12.46Pavement | LIC | Sep 2023 | $6.39M | $6.39M |
| Rank 3of 5 | SUM-IR 77-28.75Pavement | SUM | Aug 2023 | $59.5M | $54.6M |
| Rank 2of 3 | BRO-SR 131/SR 251-03.89/00.00Pavement | BRO | Aug 2023 | $527k | $501k |
| Rank 3of 5 | SUM-SR 59-07.95Pavement | SUM | Aug 2023 | $3.72M | $3.55M |
| Rank 4of 6 | COS-VAR Signal UpgradesSignals | COS | Aug 2023 | $657k | $592k |
| Wonof 4 | POR-SR 59-(06.05)(06.80)Pavement | POR | Aug 2023 | $2.77M | $2.77M |
| Wonof 1 | MER-US 33-10.42Pavement | MER | Aug 2023 | $2.53M | $2.53M |
| Rank 2of 2 | LAW-/SCI-SR 93/SR 217/SR 218/SR 348-21.52/05.70Pavement | LAW | Jul 2023 | $1.46M | $1.41M |
| Rank 2of 2 | MAH-IR 680-07.37Pavement | MAH | Jul 2023 | $11.9M | $9.75M |
| Wonof 1 | MEG-CR 24/VAR-00.00/VARPavement | MEG | Jul 2023 | $2.44M | $2.44M |
| Rank 2of 2 | LUC-SR 295-21.54 ResurfacingPavement | LUC | Jul 2023 | $1.39M | $1.28M |
| Wonof 3 | HIG-US 50-00.00Pavement | HIG | Jul 2023 | $1.75M | $1.75M |
| Rank 2of 2 | PIK-SR 32-00.00/09.92Pavement | PIK | Jul 2023 | $4.53M | $4.38M |
| Rank 3of 3 | WOO-IR 75-26.02 ResurfPavement | WOO | Jul 2023 | $6.79M | $6.25M |
| Rank 2of 4 | COS-/LIC-SR 79/SR 657-00.00/00.00Pavement | COS | Jun 2023 | $1.50M | $1.45M |
| Rank 3of 3 | SUM-Hopocan/Norton/Snyder AvePavement | SUM | Jun 2023 | $3.60M | $2.38M |
Source: public.bid_results, ODOT bid tabs. Bidder strings are normalized to upper-case but not yet entity-resolved, so related firms (e.g. "Shelly Company" vs "Shelly & Sands") are shown separately.