Ohio DOT · bid history
Showing the 300 most recent of 747 bids. Stats above reflect the full history.
| Result | Project | County | Let | Their bid | Winning bid |
|---|---|---|---|---|---|
| Rank 2of 3 | MAR-SR 746-09.05Bridge | MAR | Apr 2026 | $1.37M | $1.34M |
| Rank 6of 6 | ROS-SR 180-02.11Drainage | ROS | Apr 2026 | $1.52M | $1.19M |
| Rank 2of 2 | MOT-MCD South River WalkMaintenance | MOT | Apr 2026 | $675k | $562k |
| Rank 3of 4 | FAI-SR 204-04.30Signals | FAI | Apr 2026 | $2.26M | $2.14M |
| Wonof 2 | FRA-IR 71-17.22 RampPavement | FRA | Apr 2026 | $5.25M | $5.25M |
| Rank 2of 2 | ROS-US 23/SR 159 Interchange TPPavement | ROS | Apr 2026 | $3.57M | $3.40M |
| Rank 2of 4 | MOT-CR 74-08.40Signals | MOT | Apr 2026 | $840k | $819k |
| Wonof 3 | DEL-SR 229-00.45 AND VARIOUSBridge | DEL | Apr 2026 | $5.63M | $5.63M |
| Rank 2of 2 | LIC-SR 37-04.09Signals | LIC | Apr 2026 | $1.75M | $1.61M |
| Wonof 3 | FRA-IR 270-32.92 at Easton WayPavement | FRA | Mar 2026 | $5.19M | $5.19M |
| Wonof 3 | D08-Noise Walls FY2026Safety | D08 | Mar 2026 | $3.19M | $3.19M |
| Rank 5of 5 | LOG-US 33-09.58Signals | LOG | Mar 2026 | $5.34M | $4.00M |
| Rank 3of 3 | LIC-CR 803-00.88 (PART 1 AND PART 2)Safety | LIC | Mar 2026 | $3.13M | $2.70M |
| Rank 2of 6 | MOT-SR 725/Jamaica TSGSignals | MOT | Mar 2026 | $200k | $199k |
| Rank 4of 5 | AUG-US 33/Willipie St Infield TPPavement | AUG | Mar 2026 | $2.58M | $2.41M |
| Rank 4of 5 | NOB-TR 392-00.02Bridge | NOB | Mar 2026 | $869k | $588k |
| Wonof 7 | SCI-SR 125-06.26Bridge | SCI | Mar 2026 | $1.97M | $1.97M |
| Rank 9of 10 | WYA-US 30 Rest Areas TPPavement | WYA | Mar 2026 | $4.19M | $3.39M |
| Rank 3of 4 | ROS-US 35/US 50 Interchange TPPavement | ROS | Mar 2026 | $3.55M | $3.08M |
| Rank 2of 2 | LIC-SR 16/SR 37-14.24/15.47Pavement | LIC | Feb 2026 | $43.3M | $42.7M |
| Rank 6of 8 | JAC-SR 788-00.87Bridge | JAC | Feb 2026 | $1.11M | $985k |
| Rank 5of 5 | MOT-Trotwood Olive Rd Walks SA22Safety | MOT | Feb 2026 | $1.16M | $829k |
| Rank 4of 4 | CLI-SR 133-02.11Bridge | CLI | Feb 2026 | $1.42M | $1.17M |
| Rank 2of 4 | D01-BM FY26Bridge | D01 | Feb 2026 | $873k | $815k |
| Wonof 4 | BRO-CR 62-00.42Bridge | BRO | Feb 2026 | $1.71M | $1.71M |
| Rank 4of 4 | WAS-IR 77-09.58Maintenance | WAS | Jan 2026 | $2.91M | $2.21M |
| Rank 2of 2 | WAS-SR 7-52.79Bridge | WAS | Jan 2026 | $1.95M | $1.89M |
| Rank 7of 7 | PER-MR 56-00.13 (Buckeye Street)Bridge | PER | Jan 2026 | $749k | $560k |
| Wonof 5 | CLE-SR 132-12.64Bridge | CLE | Jan 2026 | $569k | $569k |
| Rank 4of 5 | LIC-IR 70-01.95Safety | LIC | Jan 2026 | $119k | $75k |
| Rank 6of 6 | PRE-MR 112-00.99 N Maple Ph 2Pavement | PRE | Jan 2026 | $3.96M | $2.44M |
| Rank 3of 3 | MOT-/MIA-NW-FY26Safety | MOT | Jan 2026 | $1.72M | $1.15M |
| Rank 4of 4 | HIG-SR 73-21.04Bridge | HIG | Jan 2026 | $2.46M | $2.24M |
| Rank 4of 4 | LAW-SR 378-04.84Bridge | LAW | Jan 2026 | $1.80M | $1.57M |
| Rank 5of 5 | JAC-SR 327/SR 32-13.58/17.51Drainage | JAC | Jan 2026 | $660k | $536k |
| Rank 6of 7 | MIA-SR 571-IMP 06.38Safety | MIA | Dec 2025 | $1.93M | $1.49M |
| Rank 4of 5 | FAY-US 22-06.21Signals | FAY | Dec 2025 | $2.25M | $2.25M |
| Rank 2of 4 | HAM-CR 14-03.49 Dry Fork RdPavement | HAM | Dec 2025 | $8.56M | $8.26M |
| Rank 4of 6 | MOE-TR 1004-02.27Bridge | MOE | Dec 2025 | $1.57M | $1.21M |
| Rank 2of 5 | D01-OL FY26Bridge | D01 | Dec 2025 | $3.06M | $2.93M |
| Wonof 5 | HOC-SR 664-12.74Signals | HOC | Dec 2025 | $2.05M | $2.05M |
| Rank 3of 3 | MER-SR 219-13.80Bridge | MER | Dec 2025 | $2.03M | $1.45M |
| Rank 3of 5 | MAR-SR 95-17.90 (at Jamesway)Pavement | MAR | Dec 2025 | $3.05M | $2.69M |
| Wonof 7 | ROS-CR 550-17.12 (Safety)Signals | ROS | Dec 2025 | $497k | $497k |
| Rank 5of 8 | HIG-SR 73-00.26Bridge | HIG | Nov 2025 | $2.19M | $1.74M |
| Rank 4of 7 | LOG-US 33-17.82Bridge | LOG | Nov 2025 | $671k | $493k |
| Rank 5of 7 | ROS-SR 138-17.28Bridge | ROS | Nov 2025 | $2.88M | $2.46M |
| Rank 7of 7 | NOB-SR 78-01.08 / NOB-SR 83-00.02Bridge | NOB | Nov 2025 | $2.01M | $1.66M |
| Rank 4of 7 | FAI-SR 158-04.20Signals | FAI | Nov 2025 | $2.75M | $2.32M |
| Rank 4of 4 | MRG-SR 555-23.05Bridge | MRG | Oct 2025 | $1.75M | $1.38M |
| Rank 4of 4 | D03-BH FY2026(A)Bridge | D03 | Oct 2025 | $471k | $354k |
| Rank 4of 4 | CRA-US 30-08.42Bridge | CRA | Oct 2025 | $8.85M | $7.64M |
| Rank 4of 6 | D03-TSG FY2026 (M)Signals | D03 | Oct 2025 | $363k | $296k |
| Wonof 3 | VIN-Moonville Trail 144/48 & 70Bridge | VIN | Oct 2025 | $1.53M | $1.53M |
| Rank 2of 5 | HIG-SR 753-13.03Bridge | HIG | Oct 2025 | $2.08M | $2.06M |
| Rank 3of 4 | MAR-SR 37-08.44Bridge | MAR | Oct 2025 | $3.03M | $2.57M |
| Rank 5of 5 | AUG-SR 219-09.27Bridge | AUG | Oct 2025 | $1.26M | $950k |
| Rank 2of 7 | ROS-US 35-23.67Earthwork | ROS | Oct 2025 | $712k | $590k |
| Rank 2of 4 | D06-ELEC FY26Signals | D06 | Oct 2025 | $583k | $489k |
| Wonof 4 | UNI-SR 38-03.21Bridge | UNI | Sep 2025 | $4.33M | $4.33M |
| Rank 3of 6 | DEL-SR 315-05.00/06.40/08.10Earthwork | DEL | Sep 2025 | $4.17M | $3.33M |
| Rank 4of 6 | D03-TSG Radar FY2026Signals | D03 | Sep 2025 | $266k | $210k |
| Rank 4of 6 | MIA-SR 41-11.32Signals | MIA | Sep 2025 | $3.91M | $3.33M |
| Rank 5of 6 | BRO-SR 131-00.07Drainage | BRO | Sep 2025 | $920k | $765k |
| Wonof 1 | BRO-US 52-12.43Bridge | BRO | Sep 2025 | $5.11M | $5.11M |
| Wonof 2 | D08-Bridge Maintenance FY2026Bridge | D08 | Sep 2025 | $2.79M | $2.79M |
| Rank 3of 4 | MAR-SR 231-03.42Bridge | MAR | Sep 2025 | $556k | $481k |
| Rank 3of 9 | CLA-SR 235/SR 571-04.36/01.05Signals | CLA | Sep 2025 | $71k | $68k |
| Rank 2of 3 | HIG-US 62-17.10Bridge | HIG | Sep 2025 | $305k | $222k |
| Rank 2of 10 | PIC-SR 56-20.77Earthwork | PIC | Sep 2025 | $487k | $469k |
| Rank 4of 5 | DEL-SR 750-02.57Safety | DEL | Aug 2025 | $239k | $187k |
| Rank 3of 4 | CLI-SR 134-02.25Bridge | CLI | Aug 2025 | $1.83M | $1.59M |
| Rank 7of 8 | ROS-SR 772-07.64Bridge | ROS | Aug 2025 | $1.91M | $1.65M |
| Rank 3of 3 | MAR-US 23/SR 529-07.86 & 10.06/02.80Bridge | MAR | Aug 2025 | $7.82M | $7.29M |
| Rank 7of 8 | WAS-Beverly SidewalkSafety | WAS | Aug 2025 | $605k | $326k |
| Rank 2of 3 | CLE-SR 48/SR 132-06.62/17.76Bridge | CLE | Aug 2025 | $1.17M | $1.14M |
| Rank 2of 6 | D06-Bridge Pier EncasementsBridge | D06 | Jul 2025 | $1.77M | $1.60M |
| Rank 5of 5 | FRA-US 33-28.61Signals | FRA | Jul 2025 | $284k | $256k |
| Rank 2of 3 | CLA-/MOT CR/BH FY26Drainage | CLA | Jul 2025 | $657k | $366k |
| Rank 4of 4 | MAD-US 42/CR 40/West Ave-SidewalksSafety | MAD | Jul 2025 | $532k | $366k |
| Rank 3of 7 | D06-ITS MAINT-FY2026Signals | D06 | Jul 2025 | $1.42M | $1.20M |
| Rank 4of 4 | CLI-SR 28-16.91Bridge | CLI | Jul 2025 | $703k | $463k |
| Rank 3of 3 | D11-LG-FY2026Signals | D11 | Jun 2025 | $1.76M | $1.20M |
| Rank 2of 2 | D05-FY2026 Bridge Rehab WestBridge | D05 | Jun 2025 | $2.08M | $1.13M |
| Rank 2of 2 | D05-FY2026 Bridge Rehab EastBridge | D05 | Jun 2025 | $2.76M | $1.97M |
| Rank 6of 6 | ROS-SR 772-10.40Earthwork | ROS | May 2025 | $6.12M | $4.08M |
| Rank 5of 6 | UNI-US 42-03.91Pavement | UNI | May 2025 | $8.49M | $7.96M |
| Wonof 2 | HAM-/WAR-US 22-16.04/00.00 PedSafety | HAM | May 2025 | $864k | $864k |
| Rank 4of 4 | FAI-US 33-02.64Pavement | FAI | May 2025 | $54.8M | $51.3M |
| Rank 4of 5 | PER-TR 1180-00.605Bridge | PER | May 2025 | $851k | $655k |
| Rank 3of 3 | LIC-SR 16-05.38Maintenance | LIC | May 2025 | $456k | $392k |
| Rank 2of 3 | CLE-IR 275-00.43Bridge | CLE | May 2025 | $3.09M | $3.03M |
| Rank 3of 3 | FRA-Wynne Ridge CourtBridge | FRA | May 2025 | $1.73M | $1.60M |
| Rank 5of 6 | DEL-IR 71-08.91 (Ph A)Pavement | DEL | May 2025 | $36.9M | $32.3M |
| Rank 2of 3 | D08-TSG-FY2025/FY2026Signals | D08 | Apr 2025 | $2.00M | $1.97M |
| Rank 3of 3 | MUS-US 40-08.35Signals | MUS | Apr 2025 | $291k | $269k |
| Rank 2of 2 | MAD-Maple Street BridgeBridge | MAD | Apr 2025 | $979k | $798k |
| Rank 6of 6 | DEL-SR 315-05.66 at Hyatts RdSignals | DEL | Apr 2025 | $3.65M | $2.76M |
| Wonof 4 | FRA-IR 71/IR 270-28.27/25.99APavement | FRA | Apr 2025 | $41.4M | $41.4M |
| Rank 4of 5 | BUT-SR 126-02.92Earthwork | BUT | Apr 2025 | $5.53M | $5.16M |
| Rank 5of 6 | NOB-Mill St.-00.07Bridge | NOB | Apr 2025 | $1.12M | $774k |
| Wonof 3 | GUE-SR 658-10.14/10.98Bridge | GUE | Apr 2025 | $2.13M | $2.13M |
| Wonof 2 | MOT-IR 75-18.32 Bridge HitBridge | MOT | Apr 2025 | $1.00M | $1.00M |
| Rank 3of 4 | UNI-SR 37-12.24Bridge | UNI | Mar 2025 | $2.25M | $2.01M |
| Rank 3of 5 | D02-TSG FY2025Signals | D02 | Mar 2025 | $469k | $404k |
| Rank 4of 6 | D08-LG LED FY25Signals | D08 | Mar 2025 | $756k | $441k |
| Rank 2of 4 | UNI-US 33-09.10/11.50 (PART 1, 2, 3)Bridge | UNI | Mar 2025 | $21.1M | $20.8M |
| Wonof 1 | GAL-CR 40-02.35Bridge | GAL | Mar 2025 | $1.67M | $1.67M |
| Rank 4of 9 | PER-MR 280-00.10 (Scotch Hill)Other | PER | Mar 2025 | $180k | $135k |
| Rank 2of 3 | WAR-S River & S Main NSSignals | WAR | Feb 2025 | $696k | $624k |
| Rank 4of 5 | WAR-US 42-20.23Signals | WAR | Feb 2025 | $1.42M | $1.29M |
| Rank 10of 10 | LIC-CR 804-00.96 (Church St)Pavement | LIC | Feb 2025 | $2.97M | $2.14M |
| Rank 10of 10 | LIC-CR 134-02.06Pavement | LIC | Feb 2025 | $3.11M | $2.45M |
| Rank 6of 6 | HOC-SR 56-05.69/HOC-SR 180-02.33Bridge | HOC | Feb 2025 | $2.52M | $1.69M |
| Wonof 3 | ROS-SR 159-00.41Pavement | ROS | Feb 2025 | $19.3M | $19.3M |
| Rank 7of 7 | MOT-Sycamore Creek Bridge ReplacBridge | MOT | Feb 2025 | $673k | $474k |
| Rank 6of 6 | VIN-CR 25-00.20Bridge | VIN | Feb 2025 | $942k | $726k |
| Rank 2of 4 | GRE-IR 71/SR 72-01.50/00.29Bridge | GRE | Jan 2025 | $2.84M | $2.79M |
| Wonof 2 | LIC-SR 661-00.60Signals | LIC | Jan 2025 | $1.89M | $1.89M |
| Rank 4of 4 | FRA-IR 70-00.00Pavement | FRA | Jan 2025 | $65.7M | $54.4M |
| Rank 7of 7 | MOT-Woodman Dr ReconstructionPavement | MOT | Jan 2025 | $6.41M | $4.75M |
| Rank 3of 3 | ROS-CR 222-04.02Bridge | ROS | Jan 2025 | $7.20M | $6.57M |
| Rank 2of 3 | D08-Bridge Maintenance FY2025Bridge | D08 | Jan 2025 | $1.77M | $1.57M |
| Rank 2of 5 | D07-ITS Maint-FY 2025Signals | D07 | Jan 2025 | $881k | $809k |
| Rank 2of 2 | HAM-IR 71-04.27Bridge | HAM | Jan 2025 | $3.99M | $3.88M |
| Wonof 3 | LIC-SR 37-19.18 (PART 1)Bridge | LIC | Jan 2025 | $4.92M | $4.92M |
| Rank 6of 7 | DEL-SR 521-10.32 and VariousBridge | DEL | Jan 2025 | $3.10M | $2.57M |
| Rank 4of 4 | HAM-IR 71-01.81Bridge | HAM | Jan 2025 | $15.4M | $12.9M |
| Rank 3of 5 | D01-OL FY25Bridge | D01 | Dec 2024 | $2.23M | $2.09M |
| Rank 5of 6 | FRA-US 33-06.15 (at Hayden Run Rd)Pavement | FRA | Dec 2024 | $1.79M | $1.56M |
| Rank 2of 2 | CLE-LMST Crossing SignalSignals | CLE | Dec 2024 | $340k | $316k |
| Rank 6of 7 | PIK-CR 9-05.29Bridge | PIK | Dec 2024 | $1.91M | $1.47M |
| Rank 2of 4 | HAM-VAR Sharonville SignalsSignals | HAM | Dec 2024 | $836k | $831k |
| Rank 4of 7 | WAR-SR 350-08.73Bridge | WAR | Dec 2024 | $4.48M | $4.04M |
| Rank 6of 6 | D07-BH-FY25 (D)Bridge | D07 | Dec 2024 | $2.67M | $2.07M |
| Rank 3of 3 | ATH-CR 33/CR 178-01.94/00.00Pavement | ATH | Dec 2024 | $2.88M | $2.51M |
| Rank 2of 2 | ROS-US 23-10.97Pavement | ROS | Dec 2024 | $15.3M | $14.4M |
| Rank 2of 4 | HOC-Main Street Sidewalk Phase 2Safety | HOC | Dec 2024 | $1.31M | $1.29M |
| Wonof 3 | FRA-IR 70-07.38Drainage | FRA | Nov 2024 | $710k | $710k |
| Rank 2of 7 | HOC-US 33-10.12Drainage | HOC | Nov 2024 | $437k | $394k |
| Rank 3of 3 | LOG-SR 273-00.02Bridge | LOG | Nov 2024 | $1.26M | $1.11M |
| Rank 4of 5 | FAI-US 33-12.53Signals | FAI | Nov 2024 | $896k | $756k |
| Rank 5of 7 | HIG-US 50/US 62-Hillsboro SafetySafety | HIG | Oct 2024 | $429k | $248k |
| Rank 8of 9 | ATH-SR 682-06.07 RoundaboutSignals | ATH | Oct 2024 | $5.87M | $4.75M |
| Rank 2of 6 | D06-Wrong Way DetectionSignals | D06 | Oct 2024 | $2.76M | $2.75M |
| Rank 8of 9 | ROS-SR 772-08.76Earthwork | ROS | Oct 2024 | $379k | $218k |
| Rank 2of 2 | SHE-IR 75-06.14 L/RBridge | SHE | Oct 2024 | $9.43M | $8.27M |
| Rank 4of 4 | D06-ELEC FY25Signals | D06 | Oct 2024 | $631k | $546k |
| Rank 2of 2 | BEL-SR 7-22.23Bridge | BEL | Oct 2024 | $3.49M | $3.05M |
| Rank 4of 9 | COS-CR 271-06.26Signals | COS | Oct 2024 | $475k | $429k |
| Rank 3of 3 | HAN-SR 568-02.88/03.63Bridge | HAN | Sep 2024 | $2.40M | $1.96M |
| Rank 2of 4 | D07-BH-FY25 (C)Bridge | D07 | Sep 2024 | $1.13M | $1.01M |
| Rank 9of 10 | COS-TR 252-00.00Bridge | COS | Sep 2024 | $842k | $553k |
| Rank 3of 4 | GRE-SR 72-07.71Bridge | GRE | Sep 2024 | $3.25M | $2.47M |
| Rank 2of 6 | FRA-SR 161-15.80 Noise AbatementSafety | FRA | Sep 2024 | $8.56M | $7.94M |
| Rank 2of 3 | PIC-Ashville-Ped ImproveMaintenance | PIC | Sep 2024 | $60k | $59k |
| Rank 4of 5 | HAM-IR 74-13.35Bridge | HAM | Aug 2024 | $5.98M | $5.39M |
| Rank 3of 4 | TUS-SR 259-00.10Bridge | TUS | Aug 2024 | $2.34M | $2.04M |
| Rank 2of 7 | SCI-SR 335-10.31Bridge | SCI | Aug 2024 | $2.06M | $1.95M |
| Wonof 3 | LAW-SR 93-00.00Bridge | LAW | Jul 2024 | $814k | $814k |
| Rank 2of 2 | FRA-IR 670-00.03Bridge | FRA | Jul 2024 | $14.9M | $12.9M |
| Wonof 2 | FRA-IR 270-43.18Pavement | FRA | Jul 2024 | $37.5M | $37.5M |
| Rank 3of 3 | HAM-US 52-35.89Bridge | HAM | Jun 2024 | $1.60M | $1.46M |
| Rank 3of 3 | DEL-SR 257-01.25Bridge | DEL | Jun 2024 | $646k | $185k |
| Rank 4of 4 | MRG-/WAS-SR 266/SR 339-04.13/20.12Signals | MRG | Jun 2024 | $147k | $106k |
| Wonof 4 | FRA-IR 270-00.96/01.52Bridge | FRA | May 2024 | $6.02M | $6.02M |
| Rank 2of 2 | D08-TSG-SIGNALS W R/WSignals | D08 | May 2024 | $1.67M | $1.57M |
| Rank 5of 7 | UNI-SR 736-04.06 Part 1 & 2Bridge | UNI | May 2024 | $3.96M | $3.65M |
| Rank 7of 7 | LIC-MR 297-00.03 (Loop Rd.)Other | LIC | Apr 2024 | $1.55M | $798k |
| Rank 2of 2 | BUT-SR 4-23.17Bridge | BUT | Apr 2024 | $2.69M | $1.80M |
| Rank 2of 3 | FRA-SR 161-08.66 Olentangy River RdSignals | FRA | Apr 2024 | $326k | $305k |
| Rank 4of 4 | D08-Bridge/Wall RepairsBridge | D08 | Apr 2024 | $1.74M | $1.04M |
| Rank 7of 7 | JAC-SR 279-04.06Drainage | JAC | Apr 2024 | $592k | $332k |
| Rank 3of 3 | MUS-SR 16-12.99Bridge | MUS | Apr 2024 | $1.59M | $1.42M |
| Wonof 1 | GRE-US 35-00.08 L/RBridge | GRE | Apr 2024 | $2.40M | $2.40M |
| Rank 5of 6 | ATH-Chauncey BikewayBridge | ATH | Apr 2024 | $3.74M | $3.01M |
| Rank 3of 3 | NOB-CR 40-02.41Bridge | NOB | Apr 2024 | $1.73M | $1.68M |
| Rank 2of 2 | MOT-SR 4-17.45Safety | MOT | Mar 2024 | $1.08M | $791k |
| Wonof 2 | HAM-IR 275-34.18Bridge | HAM | Mar 2024 | $1.81M | $1.81M |
| Wonof 2 | D08-Bridge Maintenance FY2024Bridge | D08 | Mar 2024 | $3.16M | $3.16M |
| Wonof 3 | TUS-SR 800-28.44Bridge | TUS | Mar 2024 | $2.64M | $2.64M |
| Rank 6of 6 | GRE-US 68-13.51Signals | GRE | Mar 2024 | $2.57M | $2.29M |
| Rank 2of 2 | FRA-IR 270-36.94Bridge | FRA | Mar 2024 | $16.1M | $15.9M |
| Rank 5of 6 | LIC-SR 661-01.64Signals | LIC | Feb 2024 | $2.35M | $2.14M |
| Rank 3of 3 | D06-Noisewall Repair FY24Safety | D06 | Feb 2024 | $872k | $821k |
| Rank 3of 4 | NOB-SR 513-09.17Bridge | NOB | Feb 2024 | $1.53M | $1.38M |
| Rank 3of 3 | HAM-US 50-29.00Bridge | HAM | Feb 2024 | $16.1M | $14.8M |
| Rank 3of 3 | LIC-IR 70-10.77 AND VARIOUSBridge | LIC | Feb 2024 | $2.54M | $2.33M |
| Rank 2of 3 | ATH-US 50-04.75Signals | ATH | Feb 2024 | $635k | $556k |
| Rank 3of 3 | PER-SR 93-04.96 AND VARBridge | PER | Feb 2024 | $2.50M | $2.15M |
| Rank 3of 3 | FRA-SR 16-06.87 (at S-Hamilton)Signals | FRA | Feb 2024 | $6.95M | $6.68M |
| Wonof 1 | MOT-SR 4/SR 444-21.99/00.23LBridge | MOT | Jan 2024 | $2.52M | $2.52M |
| Rank 7of 7 | PIK-SR 772-14.10 Slide RepairEarthwork | PIK | Jan 2024 | $1.13M | $847k |
| Rank 5of 5 | BRO-US 68-44.16Bridge | BRO | Jan 2024 | $2.78M | $2.55M |
| Wonof 5 | HOC-SR 664-15.15Signals | HOC | Jan 2024 | $289k | $289k |
| Rank 5of 5 | MER-SR 29-07.80Bridge | MER | Jan 2024 | $1.62M | $1.31M |
| Wonof 2 | D07-BH-FY24 (C)Bridge | D07 | Jan 2024 | $957k | $957k |
| Rank 2of 5 | UNI-/DEL-US 33/VAR-17.95/VARBridge | UNI | Jan 2024 | $2.54M | $2.36M |
| Rank 8of 8 | NOB-SR 513/SR 564-07.03/00.26Drainage | NOB | Jan 2024 | $1.24M | $868k |
| Rank 2of 3 | COS-SR 60-01.34Bridge | COS | Dec 2023 | $261k | $232k |
| Rank 5of 5 | MIA-CR 16A-00.00 (Peterson Rd Brd)Bridge | MIA | Dec 2023 | $6.16M | $4.45M |
| Rank 4of 5 | D10-Lighting FY2024Signals | D10 | Dec 2023 | $1.34M | $1.17M |
| Rank 9of 9 | NOB-SR 146-01.95Drainage | NOB | Nov 2023 | $520k | $336k |
| Rank 3of 4 | GUE-IR 70-01.26Bridge | GUE | Nov 2023 | $1.58M | $1.42M |
| Rank 6of 7 | ROS-US 23-06.63 (Trego Creek Safety)Safety | ROS | Nov 2023 | $1.74M | $1.40M |
| Rank 5of 5 | CLI-US 68-17.97/18.08Drainage | CLI | Nov 2023 | $923k | $719k |
| Wonof 3 | HIG-SR 138-27.24Bridge | HIG | Nov 2023 | $3.08M | $3.08M |
| Rank 4of 5 | LAW-SR 243-10.84Bridge | LAW | Oct 2023 | $2.11M | $1.84M |
| Rank 4of 4 | PIK-SR 104-06.14Bridge | PIK | Oct 2023 | $3.68M | $3.13M |
| Rank 2of 3 | AUG-IR 75-07.54Bridge | AUG | Oct 2023 | $12.3M | $11.3M |
| Rank 2of 3 | D06-ELEC FY24Signals | D06 | Oct 2023 | $481k | $437k |
| Rank 5of 5 | PIK-CR 8-05.75Bridge | PIK | Oct 2023 | $951k | $676k |
| Rank 3of 3 | CLE-SR 32-02.33 (PART 1)Pavement | CLE | Oct 2023 | $31.7M | $30.0M |
| Wonof 4 | ROS-US 50-19.39 (Safety)Signals | ROS | Oct 2023 | $73k | $73k |
| Rank 3of 3 | MOT-IR 70-06.03Bridge | MOT | Oct 2023 | $2.45M | $2.40M |
| Rank 3of 3 | SHE-SR 47-03.97Bridge | SHE | Oct 2023 | $1.85M | $1.65M |
| Rank 5of 9 | PIK-CR 50-02.55 OH18-01Earthwork | PIK | Sep 2023 | $1.42M | $1.13M |
| Rank 2of 4 | D07-BH-FY23 (A)Bridge | D07 | Sep 2023 | $788k | $771k |
| Rank 6of 8 | RIC-SR 96-16.58Bridge | RIC | Sep 2023 | $2.64M | $2.35M |
| Rank 3of 3 | PRE-SR 121-00.98/02.07Bridge | PRE | Sep 2023 | $2.42M | $2.30M |
| Rank 4of 4 | HAM-SR 4-07.00 SidewalkSafety | HAM | Sep 2023 | $868k | $512k |
| Rank 2of 4 | GRE-US 42-02.63/20.21Bridge | GRE | Sep 2023 | $3.37M | $3.27M |
| Rank 2of 5 | MEG-SR 7-05.80Bridge | MEG | Sep 2023 | $1.13M | $969k |
| Wonof 2 | FRA-IR 70-16.76Bridge | FRA | Sep 2023 | $2.61M | $2.61M |
| Rank 2of 6 | MOT-BH-FY24Bridge | MOT | Sep 2023 | $2.84M | $2.59M |
| Rank 3of 5 | FRA-IR 70-20.29 (Courtright Rd.)Bridge | FRA | Sep 2023 | $2.91M | $2.54M |
| Wonof 4 | HOC-US 33-13.13/14.01Bridge | HOC | Aug 2023 | $1.81M | $1.81M |
| Rank 3of 6 | COS-VAR Signal UpgradesSignals | COS | Aug 2023 | $631k | $592k |
| Rank 6of 6 | HAM-IR 71-08.65Pavement | HAM | Aug 2023 | $5.49M | $4.77M |
| Rank 5of 5 | MRG-CR 52-03.82Bridge | MRG | Aug 2023 | $1.26M | $869k |
| Rank 4of 5 | WAR-SR 73-14.58/14.62Bridge | WAR | Aug 2023 | $4.56M | $4.10M |
| Rank 2of 2 | DEL-US 23-08.96Drainage | DEL | Aug 2023 | $3.05M | $2.88M |
| Rank 2of 2 | PRE-US 35-01.76Bridge | PRE | Aug 2023 | $2.93M | $2.90M |
| Rank 4of 4 | HAN-US 224-17.67 SignalSignals | HAN | Aug 2023 | $289k | $252k |
| Rank 3of 3 | JEF-SR 7-13.69Bridge | JEF | Jul 2023 | $4.60M | $3.83M |
| Rank 2of 2 | BUT-Augspurger Rd NSSignals | BUT | Jul 2023 | $428k | $401k |
| Wonof 3 | ROS-US 35-24.19Bridge | ROS | Jul 2023 | $870k | $870k |
| Rank 3of 3 | D01-TSG-FY2024Signals | D01 | Jul 2023 | $849k | $772k |
| Rank 3of 3 | GRE-Yellow Spgs Multi-Modal FY23Safety | GRE | Jul 2023 | $1.68M | $963k |
| Rank 3of 3 | D10-Signal FY 2024Signals | D10 | Jun 2023 | $442k | $404k |
| Rank 3of 3 | KNO-SR 95-05.19 (Fredericktown)Pavement | KNO | Jun 2023 | $2.00M | $1.60M |
| Rank 5of 6 | MOT-IR 75-22.92Signals | MOT | Jun 2023 | $305k | $288k |
| Rank 2of 2 | HAM-SR 562-00.54Bridge | HAM | Jun 2023 | $27.4M | $21.4M |
| Rank 3of 3 | LIC-SR 161/TR 88-00.33/02.74Pavement | LIC | May 2023 | $1.08M | $897k |
| Wonof 2 | D06-ITS Maintenance FY 23Signals | D06 | May 2023 | $665k | $665k |
| Rank 2of 3 | D05-/D06 ITS Expansion FY23Signals | D05 | May 2023 | $2.07M | $2.05M |
| Rank 2of 2 | VIN-CR 7-03.00Bridge | VIN | May 2023 | $712k | $548k |
| Rank 2of 2 | LIC-SR 16/SR 79-VARBridge | LIC | May 2023 | $3.91M | $2.33M |
| Rank 2of 2 | FRA-IR 270-51.50/FRA-US 23-4.19 (PART 1 AND PART 2)Pavement | FRA | May 2023 | $33.6M | $31.8M |
| Rank 2of 2 | ROS-US 23-13.06Signals | ROS | May 2023 | $787k | $647k |
| Rank 4of 4 | FRA-US 40-07.00Pavement | FRA | Apr 2023 | $10.4M | $8.42M |
| Rank 5of 5 | CLI-IR 71-11.21 Weigh StationPavement | CLI | Apr 2023 | $1.93M | $1.57M |
| Rank 3of 3 | D09-BH-FY2023Bridge | D09 | Apr 2023 | $1.68M | $1.42M |
| Rank 5of 5 | DEL-US 36-18.79 (at Galena)Signals | DEL | Apr 2023 | $3.42M | $2.80M |
| Wonof 2 | FRA-SR 315-02.78Bridge | FRA | Apr 2023 | $10.6M | $10.6M |
| Rank 2of 3 | LIC-CR 813/MR 491-01.03/00.43Drainage | LIC | Apr 2023 | $1.23M | $1.11M |
| Rank 2of 3 | DEL-US 36-17.95 over IR 71Bridge | DEL | Apr 2023 | $7.21M | $6.72M |
| Wonof 4 | PIC-SR 56-20.41Earthwork | PIC | Apr 2023 | $252k | $252k |
| Wonof 3 | NOB-CR 47-03.49Bridge | NOB | Apr 2023 | $2.18M | $2.18M |
| Rank 3of 4 | WAR-IR 71-01.69/11.04/13.71Bridge | WAR | Apr 2023 | $4.88M | $4.21M |
| Rank 2of 2 | CHP-SR 29-15.69Bridge | CHP | Apr 2023 | $238k | $71k |
| Rank 2of 2 | HAM-CR 23-01.42Bridge | HAM | Mar 2023 | $3.14M | $2.67M |
| Rank 5of 6 | BUT-US 27-00.80Bridge | BUT | Mar 2023 | $3.24M | $2.58M |
| Rank 2of 3 | D08-Bridge Maintenance FY2023Bridge | D08 | Mar 2023 | $2.50M | $2.34M |
| Rank 4of 5 | GRE-SR 725-01.91Bridge | GRE | Mar 2023 | $1.13M | $950k |
| Rank 4of 4 | MOE-TR 307-00.72Bridge | MOE | Mar 2023 | $867k | $705k |
| Rank 3of 4 | D05-FY 2023 School FlasherSignals | D05 | Mar 2023 | $326k | $303k |
| Rank 2of 5 | LIC-Thornwood CrossingOther | LIC | Mar 2023 | $15.9M | $15.4M |
| Rank 3of 4 | LIC-CR 804-01.73Bridge | LIC | Feb 2023 | $4.36M | $4.07M |
| Wonof 1 | MOT-SR 4-17.79/18.03Bridge | MOT | Feb 2023 | $6.66M | $6.66M |
| Rank 3of 4 | BEL-SR 800-14.97Bridge | BEL | Feb 2023 | $1.55M | $1.37M |
| Wonof 3 | PRE-US 127-19.11Bridge | PRE | Feb 2023 | $4.99M | $4.99M |
| Rank 2of 3 | FRA-SR 315-11.66Bridge | FRA | Feb 2023 | $2.07M | $1.67M |
| Rank 7of 7 | JAC-SR 327-03.82Bridge | JAC | Feb 2023 | $726k | $591k |
| Rank 3of 3 | DEL-US 36-11.03Bridge | DEL | Jan 2023 | $36.9M | $31.1M |
| Wonof 2 | PIC-US 22-17.12Pavement | PIC | Jan 2023 | $3.12M | $3.12M |
| Rank 10of 10 | PIK-CR 77-02.07 OBPPBridge | PIK | Jan 2023 | $708k | $497k |
| Wonof 5 | FAI-SR 37-27.41Earthwork | FAI | Jan 2023 | $569k | $569k |
| Rank 3of 3 | MEG-SR 124-55.89Bridge | MEG | Jan 2023 | $1.99M | $1.83M |
| Rank 2of 6 | BUT-US 127-07.28/11.98Bridge | BUT | Jan 2023 | $827k | $801k |
| Rank 3of 5 | GRE-US 35-05.63Pavement | GRE | Jan 2023 | $46.2M | $40.1M |
| Rank 2of 2 | FRA-IR 70-21.33Pavement | FRA | Jan 2023 | $5.38M | $5.18M |
| Rank 8of 8 | JAC-SR 139-10.44Drainage | JAC | Jan 2023 | $790k | $584k |
| Rank 4of 4 | LIC-SR 16-(15.58)(15.91)Bridge | LIC | Jan 2023 | $11.8M | $10.4M |
| Rank 5of 5 | HIG-SR 72-05.79Bridge | HIG | Jan 2023 | $1.27M | $1.13M |
| Rank 2of 2 | MAR-SR 423-07.40 (at Barks Rd W)Signals | MAR | Jan 2023 | $1.31M | $1.17M |
| Rank 4of 6 | FRA-/FAI-US 33-31.04/00.00 Noise WallSafety | FRA | Dec 2022 | $1.33M | $1.14M |
| Rank 2of 3 | MOT-US 35-19.80Pavement | MOT | Dec 2022 | $11.3M | $10.3M |
| Rank 7of 7 | SCI-SR 125-02.90Drainage | SCI | Dec 2022 | $1.47M | $855k |
| Rank 3of 4 | CLE-SR 32-01.40Pavement | CLE | Dec 2022 | $5.60M | $4.38M |
| Rank 2of 6 | CLI-SR 73-02.66Signals | CLI | Dec 2022 | $3.13M | $2.85M |
| Rank 5of 5 | D03-TSG FY2023Signals | D03 | Dec 2022 | $231k | $195k |
| Rank 5of 5 | CLE-CR 171 (Old SR74)Pavement | CLE | Dec 2022 | $6.76M | $5.73M |
| Rank 3of 3 | MEG-SR 7-07.61Bridge | MEG | Dec 2022 | $533k | $505k |
| Rank 5of 5 | D11-TSG-FY2023Signals | D11 | Dec 2022 | $1.30M | $1.14M |
| Rank 5of 6 | MOT-Olentangy Drive Bridge ReplBridge | MOT | Dec 2022 | $743k | $480k |
| Rank 3of 3 | HAM-IR 71-14.40/18.58Bridge | HAM | Nov 2022 | $4.32M | $3.51M |
| Rank 5of 7 | MOE-CR 28-00.54Bridge | MOE | Nov 2022 | $853k | $752k |
| Rank 8of 9 | HIG-TR 239-00.88Bridge | HIG | Nov 2022 | $873k | $735k |
| Rank 2of 5 | MAR-SR 95-22.64Bridge | MAR | Nov 2022 | $1.73M | $1.49M |
Source: public.bid_results, ODOT bid tabs. Bidder strings are normalized to upper-case but not yet entity-resolved, so related firms (e.g. "Shelly Company" vs "Shelly & Sands") are shown separately.