SUM-SP FY2018 (West)
SUM County · est $1.2M
Bid dateThursday, March 22—
SUM County · est $1.2M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 25 more items below.
| Item | Quantity | R1Barbicas Construction Company INC | R2Chagrin Valley Paving INC | R3Shelly & Sands INC | R4Karvo Companies INC | % of bid |
|---|---|---|---|---|---|---|
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 27,335 SY | $22.00 | $23.75 | $30.50 | $29.00 | 47% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 557 CY | $150 | $130 | $140 | $160 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $75,000 | $195,000 | $128,000 | $170,000 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $75,000 | $57,250 | $40,000 | $100,000 |
| Item | Quantity | R1Barbicas Construction Company INC | R2Chagrin Valley Paving INC | R3Shelly & Sands INC | R4Karvo Companies INC |
|---|---|---|---|---|---|
| 203E10000 EXCAVATION | 34 CY | $20.00 | $45.00 | $30.00 | $25.00 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 900 FT | $2.50 | $2.00 | $4.00 | $3.00 |
| 304E20000 AGGREGATE BASE | 34 CY | $45.00 | $75.00 | $60.00 | $55.00 |
| 407E20000 NON-TRACKING TACK COAT | 900 GAL | $3.65 | $2.00 | $3.00 | $2.75 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $55,000 | $10,000 | $6,000 | $25,000 | 4% |
| 255E10500 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 200 SY | $200 | $295 | $421 | $335 | 3% |
| 842E10000 CORRECTING ELEVATION OF CONCRETE APPROACH SLABS WI | 7,528 LB | $4.50 | $4.50 | $5.00 | $4.50 | 3% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 110 CY | $270 | $250 | $213 | $224 | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 82 CY | $350 | $250 | $380 | $260 | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 110 CY | $250 | $250 | $213 | $225 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=2") | 10,000 SY | $2.50 | $2.00 | $3.00 | $3.00 | 2% |
| 842E10000 CORRECTING ELEVATION OF CONCRETE APPROACH SLABS WI | 8,232 LB | $3.00 | $4.50 | $5.00 | $4.50 | 2% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 20 SNMT | $1,200 | $1,250 | $1,300 | $1,250 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T= 1 1/2") | 2,634 SY | $9.00 | $5.00 | $5.00 | $5.00 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T= 1 1/2") | 2,634 SY | $9.00 | $5.00 | $5.00 | $5.00 | 2% |
| 842E10000 CORRECTING ELEVATION OF CONCRETE APPROACH SLABS WI | 7,478 LB | $3.00 | $4.50 | $5.00 | $4.50 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T= 1 1/2") | 1,956 SY | $10.00 | $5.00 | $13.00 | $6.55 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 300 HOUR | $65.00 | $75.00 | $70.00 | $65.00 | 2% |
| 642E00094 EDGE LINE, 6" | 3 MILE | $6,465 | $3,665 | $3,890 | $3,665 | 2% |
| 642E00194 LANE LINE, 6" | 3 MILE | $6,350 | $3,360 | $3,550 | $3,360 | 1% |
| 10 EACH |
| $5.00 |
| $25.00 |
| $10.00 |
| $3.50 |
| 642E00290 CENTER LINE | 0.5 MILE | $6,600 | $3,800 | $4,025 | $3,800 |
| 642E00390 CHANNELIZING LINE, 8" | 100 FT | $1.00 | $3.50 | $2.65 | $2.50 |
| 642E00394 CHANNELIZING LINE, 12" | 100 FT | $1.25 | $3.50 | $3.75 | $3.50 |
| 642E00490 STOP LINE | 50 FT | $5.00 | $5.00 | $5.25 | $5.00 |
| 646E10010 EDGE LINE, 6" | 1.04 MILE | $11,740 | $9,000 | $9,550 | $9,000 |
| 646E10200 CENTER LINE | 0.4 MILE | $13,060 | $9,300 | $9,850 | $9,300 |
| 646E10300 CHANNELIZING LINE, 8" | 430 FT | $2.50 | $1.70 | $2.00 | $1.70 |
| 646E10400 STOP LINE | 56 FT | $18.00 | $11.00 | $12.00 | $11.00 |
| 646E20300 LANE ARROW | 6 EACH | $250 | $169 | $180 | $169 |
| 614E12420 DETOUR SIGNING | 1 LS | $10,000 | $8,000 | $8,000 | $8,000 |
| 614E12460 WORK ZONE MARKING SIGN | 50 EACH | $85.00 | $115 | $170 | $115 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $150 | $100 | $220 | $165 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.4 MILE | $3,465 | $1,800 | $1,900 | $1,800 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 1.04 MILE | $3,320 | $900 | $950 | $900 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 430 FT | $0.55 | $1.00 | $1.00 | $1.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 56 FT | $2.50 | $3.00 | $3.25 | $3.00 |
| 407E20000 NON-TRACKING TACK COAT | 176 GAL | $3.65 | $2.00 | $3.00 | $2.75 |
| 407E20000 NON-TRACKING TACK COAT | 237 GAL | $3.65 | $2.00 | $3.00 | $2.75 |
| 407E20000 NON-TRACKING TACK COAT | 237 GAL | $3.65 | $2.00 | $3.00 | $2.75 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 27,335 SY | $22 | $601k | 45% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 557 CY | $150 | $84k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $75,000 | $75k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $75,000 | $75k | 6% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $55,000 | $55k | 4% |
| 255E10500 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 200 SY | $200 | $40k | 3% |
| 842E10000 CORRECTING ELEVATION OF CONCRETE APPROACH SLABS WI | 7,528 LB | $4.5 | $34k | 3% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 110 CY | $270 | $30k | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 82 CY | $350 | $29k | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 110 CY | $250 | $28k | 2% |