| Result | Project | County | Let | Their bid | Winning bid |
|---|---|---|---|---|---|
| Rank 2of 4 | SUM-CR 662-00.00 (4th St)Pavement | SUM | Apr 2023 | $697k | $665k |
| Rank 2of 5 | SUM-/POR-CR 10/45-00.00/03.33Pavement | SUM | Apr 2023 | $807k | $793k |
| Wonof 5 | SUM-Valley View Rd (Macedonia)Pavement | SUM | Apr 2023 | $295k | $295k |
| Rank 3of 3 | TRU-SR 7-12.64Pavement | TRU | Apr 2023 | $1.14M | $855k |
| Rank 3of 4 | CUY-SR 14-10.05Pavement | CUY | Mar 2023 | $3.54M | $3.05M |
| Rank 4of 6 | TRU-Ellsworth-Bailey RdPavement | TRU | Mar 2023 | $387k | $356k |
| Wonof 8 | CUY-York RoadPavement | CUY | Mar 2023 | $848k | $848k |
| Rank 3of 3 | MED-SR 94/SR 162-05.36/12.90Pavement | MED | Feb 2023 | $2.89M | $2.58M |
| Rank 5of 6 | CUY-Bennett Road Path TLCISafety | CUY | Jan 2023 | $432k | $278k |
| Rank 3of 5 | LAK-SR 86-01.68Pavement | LAK | Jan 2023 | $1.22M | $1.08M |
| Rank 4of 5 | POR-SR 14-06.43Pavement | POR | Jan 2023 | $1.70M | $1.33M |
| Rank 4of 4 | MAH-SR 165/SR 534-05.46/03.02Pavement | MAH | Jan 2023 | $4.31M | $3.00M |
| Rank 4of 6 | GEA-SR 87-07.70Pavement | GEA | Jan 2023 | $1.70M | $1.33M |
| Wonof 4 | STA-SR 43/VAR-12.70/VARPavement | STA | Jan 2023 | $2.98M | $2.98M |
| Rank 3of 3 | LAK-Kirtland RoadPavement | LAK | Dec 2022 | $322k | $300k |
| Rank 2of 3 | D12-BH FY2022 OverlayBridge | D12 | Dec 2022 | $4.10M | $3.93M |
| Rank 3of 3 | WAY-SR 94-08.18Pavement | WAY | Dec 2022 | $3.23M | $2.16M |
| Rank 3of 5 | STA-SR 297/SR 627-00.66/00.37Pavement | STA | Nov 2022 | $1.30M | $1.09M |
| Rank 2of 3 | LOR-US 20-19.83Pavement | LOR | Nov 2022 | $1.89M | $1.70M |
| Rank 3of 3 | LOR-US 6-15.87Pavement | LOR | Nov 2022 | $3.28M | $2.62M |
| Rank 6of 6 | POR-SR 5/VAR-05.09/VARPavement | POR | Nov 2022 | $6.76M | $4.92M |
| Rank 3of 4 | STA-SR 183-06.47Pavement | STA | Oct 2022 | $2.57M | $2.01M |
| Rank 4of 4 | MAH-SR 170-13.19Pavement | MAH | Sep 2022 | $1.59M | $1.23M |
| Wonof 2 | GEA-SR 306-04.45Pavement | GEA | Sep 2022 | $2.28M | $2.28M |
| Rank 3of 4 | POR-SR 88-13.71Pavement | POR | Aug 2022 | $992k | $879k |
| Rank 4of 6 | POR-SR 43/43D-11.87/00.00Pavement | POR | Aug 2022 | $2.19M | $1.97M |
| Wonof 5 | ATB-SR 307-07.64/19.87Bridge | ATB | Aug 2022 | $524k | $524k |
| Rank 6of 6 | SUM-SR 176/SR 303-00.23/00.00Pavement | SUM | Aug 2022 | $3.24M | $2.38M |
| Rank 3of 5 | SUM-CR 17-01.36 (Cleve-Mass)Pavement | SUM | Aug 2022 | $977k | $810k |
| Rank 3of 3 | TRU-SR 169-01.78Pavement | TRU | Jul 2022 | $595k | $469k |
| Rank 4of 4 | ATB-US 20/SR 84-11.02/14.13Pavement | ATB | Jul 2022 | $1.33M | $1.26M |
| Rank 2of 2 | MED-SR 162/SR 301-00.00/06.91Pavement | MED | Jul 2022 | $2.68M | $2.05M |
| Rank 3of 7 | SUM-Gilchrist Rd Ph1 (Mogadore)Pavement | SUM | Jun 2022 | $798k | $699k |
| Rank 4of 4 | COL-SR 170-11.42Pavement | COL | Jun 2022 | $1.56M | $1.06M |
| Rank 3of 3 | D04-SP FY2022 (East)Pavement | D04 | May 2022 | $2.47M | $1.32M |
| Rank 3of 3 | D04-SP FY2022 (West)Pavement | D04 | May 2022 | $2.98M | $1.89M |
| Rank 6of 6 | SUM-CR 17-23.27 Brecksville RdPavement | SUM | May 2022 | $1.49M | $1.08M |
| Rank 6of 6 | POR-CR 256-00.00 E Mennonite RdPavement | POR | Apr 2022 | $678k | $512k |
| Rank 5of 5 | LOR-US 6-12.36Pavement | LOR | Apr 2022 | $1.69M | $1.22M |
| Rank 3of 7 | POR-CR 197-01.03 (Frost Rd)Pavement | POR | Mar 2022 | $776k | $690k |
| Wonof 4 | CUY-US 6/US 20-24.44/27.78Pavement | CUY | Mar 2022 | $5.20M | $5.20M |
| Rank 3of 4 | CUY-Cedar RoadPavement | CUY | Mar 2022 | $2.44M | $2.40M |
| Wonof 4 | D12-PPM FY2022Pavement | D12 | Mar 2022 | $1.97M | $1.97M |
| Rank 4of 5 | SUM-SR 93/SR 162-09.10/07.26Pavement | SUM | Mar 2022 | $3.19M | $2.48M |
| Rank 2of 4 | SUM-Munroe Falls AvePavement | SUM | Mar 2022 | $376k | $344k |
| Rank 3of 5 | LOR-CR 78-00.00 (Moore Rd)Pavement | LOR | Mar 2022 | $490k | $477k |
| Wonof 5 | GEA-SR 87-15.93Pavement | GEA | Mar 2022 | $1.65M | $1.65M |
| Rank 2of 5 | CUY-SR 91-10.63Pavement | CUY | Mar 2022 | $869k | $848k |
| Wonof 5 | CUY-SR 17-20.44Pavement | CUY | Feb 2022 | $865k | $865k |
| Rank 2of 5 | LAK-US 6-02.60Pavement | LAK | Jan 2022 | $1.54M | $1.52M |
| Rank 2of 6 | CUY-US 6-03.85Pavement | CUY | Jan 2022 | $1.38M | $1.32M |
| Rank 3of 5 | TRU-Hallock-Young RdPavement | TRU | Jan 2022 | $1.80M | $1.62M |
| Rank 2of 4 | GEA-SR 87-12.51/VARPavement | GEA | Jan 2022 | $655k | $611k |
| Rank 4of 4 | D03-RM FY2022Pavement | D03 | Jan 2022 | $1.22M | $750k |
| Rank 4of 4 | LOR-SR 83-04.17Pavement | LOR | Jan 2022 | $2.76M | $2.53M |
| Rank 3of 4 | STA-US 62/SR 153-25.32/03.00Pavement | STA | Dec 2021 | $3.86M | $3.09M |
| Wonof 5 | CUY-SR 3-02.72Pavement | CUY | Dec 2021 | $1.67M | $1.67M |
| Rank 6of 6 | POR-SR 44/VAR-16.48/VAR (PART 1, 2, 3)Pavement | POR | Dec 2021 | $7.08M | $5.29M |
| Rank 3of 4 | LOR-SR 57-04.96Pavement | LOR | Dec 2021 | $2.48M | $2.42M |
| Rank 4of 4 | GEA-US 322-14.47Pavement | GEA | Dec 2021 | $1.15M | $944k |
| Rank 6of 8 | POR-SR 14-12.96Bridge | POR | Oct 2021 | $3.37M | $3.00M |
| Wonof 6 | CUY-SR 21-09.09 DeckBridge | CUY | Oct 2021 | $4.55M | $4.55M |
| Rank 8of 8 | POR-IR 76-16.58/21.18Bridge | POR | Oct 2021 | $3.18M | $2.70M |
| Rank 4of 4 | GEA-US 6-08.86Pavement | GEA | Oct 2021 | $1.67M | $1.44M |
| Rank 4of 4 | MAH-IR 680-00.00Pavement | MAH | Oct 2021 | $1.85M | $1.10M |
| Rank 4of 5 | GEA-SR 168-00.21Pavement | GEA | Oct 2021 | $492k | $420k |
| Rank 4of 5 | MAH-US 62/SR 7-13.16/11.26Pavement | MAH | Sep 2021 | $1.49M | $1.29M |
| Rank 4of 6 | STA-SR 93/SR 236-11.71/00.00Pavement | STA | Sep 2021 | $2.22M | $1.95M |
| Rank 5of 6 | CUY-US 42-11.01Pavement | CUY | Jul 2021 | $2.53M | $2.20M |
| Rank 3of 5 | TRU-SR 87-02.26Pavement | TRU | Jul 2021 | $1.98M | $1.85M |
| Wonof 4 | CUY-BH FY2021(B) MiscBridge | CUY | Jul 2021 | $8.67M | $8.67M |
| Rank 3of 4 | LOR-SR 254-06.39Pavement | LOR | Jun 2021 | $627k | $604k |
| Rank 2of 5 | SUM-North River RoadPavement | SUM | May 2021 | $641k | $631k |
| Wonof 2 | LOR-/MED RM FY2021Pavement | LOR | May 2021 | $622k | $622k |
| Rank 2of 4 | D04-SP FY2021 (West)Pavement | D04 | May 2021 | $1.23M | $1.12M |
| Rank 4of 5 | D04-SP FY2021 (East)Pavement | D04 | May 2021 | $644k | $498k |
| Rank 3of 3 | CUY-Lake AvenuePavement | CUY | May 2021 | $3.26M | $2.55M |
| Rank 2of 6 | CUY-SR 175-07.97Pavement | CUY | May 2021 | $677k | $584k |
| Rank 2of 6 | SUM-2nd St/Wooster Rd/Norton RdPavement | SUM | Apr 2021 | $1.12M | $1.08M |
| Wonof 3 | CUY-BH FY2021(A) Misc (PART 1 AND PART 2)Bridge | CUY | Apr 2021 | $4.34M | $4.34M |
| Rank 2of 3 | CUY-SR 175-08.59 SafetySignals | CUY | Apr 2021 | $452k | $434k |
| Wonof 2 | D12-PPM FY2021Pavement | D12 | Apr 2021 | $1.30M | $1.30M |
| Rank 2of 4 | LAK-SR 608-00.00Pavement | LAK | Mar 2021 | $611k | $609k |
| Rank 2of 6 | GEA-SR 44-08.88Pavement | GEA | Mar 2021 | $1.37M | $1.31M |
| Rank 3of 7 | LOR-SR 58-24.66Pavement | LOR | Mar 2021 | $1.34M | $1.32M |
| Rank 7of 10 | CUY-IR 480-22.41 SubdeckBridge | CUY | Mar 2021 | $231k | $164k |
| Rank 3of 5 | D03-BH FY2021 (A)Bridge | D03 | Feb 2021 | $507k | $385k |
| Wonof 2 | CUY-IR 90-07.58 RepairBridge | CUY | Feb 2021 | $676k | $676k |
| Wonof 7 | CUY-SR 14-06.09Pavement | CUY | Feb 2021 | $1.38M | $1.38M |
| Wonof 5 | CUY-IR 90-14.52 DeckBridge | CUY | Feb 2021 | $3.00M | $3.00M |
| Rank 8of 9 | COL-SR 164-04.53Pavement | COL | Feb 2021 | $989k | $766k |
| Rank 3of 5 | LAK-US 20-28.14Pavement | LAK | Jan 2021 | $1.34M | $1.14M |
| Rank 4of 6 | CUY-Union AvenuePavement | CUY | Jan 2021 | $4.34M | $4.07M |
| Rank 3of 4 | GEA-SR 608-07.53Pavement | GEA | Jan 2021 | $724k | $627k |
| Wonof 5 | HAM-IR 71-01.34Maintenance | HAM | Jan 2021 | $425k | $425k |
| Rank 3of 8 | GEA-US 422-12.26 DeckBridge | GEA | Jan 2021 | $2.59M | $2.47M |
| Wonof 8 | MOT-IR 70-16.25Maintenance | MOT | Jan 2021 | $771k | $771k |
| Rank 9of 10 | ASD-SR 302-09.34Bridge | ASD | Jan 2021 | $805k | $709k |
| Rank 8of 9 | MER-SR 716-05.02Bridge | MER | Jan 2021 | $400k | $341k |
| Rank 2of 6 | DEF-SR 2-09.01Bridge | DEF | Jan 2021 | $941k | $936k |
| Rank 3of 6 | DAR-US 127-21.59Bridge | DAR | Jan 2021 | $251k | $214k |
| Rank 2of 7 | CUY-SR 17-00.00Pavement | CUY | Jan 2021 | $2.19M | $2.18M |
| Rank 4of 8 | CUY-West 14th StreetPavement | CUY | Dec 2020 | $1.28M | $1.23M |
| Rank 4of 5 | MED-SR 18-00.00Pavement | MED | Dec 2020 | $2.38M | $2.14M |
| Rank 5of 8 | LUC-IR 475-Deck Sealing FY21Bridge | LUC | Dec 2020 | $737k | $610k |
| Rank 4of 8 | LAK-SR 283-06.82Pavement | LAK | Dec 2020 | $538k | $498k |
| Rank 2of 9 | CUY-IR 480-07.27 DeckBridge | CUY | Dec 2020 | $3.55M | $3.41M |
| Rank 2of 6 | MAH-SR 7-00.00 (PART 1 AND PART 2)Pavement | MAH | Dec 2020 | $979k | $894k |
| Rank 4of 8 | STA-SR 225-00.78Pavement | STA | Nov 2020 | $1.39M | $1.30M |
| Rank 4of 5 | MAH-SR 170-00.78/VARPavement | MAH | Nov 2020 | $1.92M | $1.81M |
| Rank 3of 6 | MED-SR 3-03.80Pavement | MED | Nov 2020 | $2.23M | $2.17M |
| Rank 2of 4 | LOR-IR 480-00.97Pavement | LOR | Nov 2020 | $3.08M | $3.05M |
| Rank 2of 7 | STA-SR 44/SR 153-08.84/VARPavement | STA | Oct 2020 | $1.57M | $1.53M |
| Wonof 5 | LAK-SR 84-03.61Pavement | LAK | Oct 2020 | $1.39M | $1.39M |
| Wonof 4 | LAK-SR 2-13.40Pavement | LAK | Oct 2020 | $699k | $699k |
| Rank 7of 7 | SUM-SR 18-04.91/07.98Pavement | SUM | Jul 2020 | $2.50M | $1.93M |
| Rank 5of 5 | SUM-IR 76-06.40Pavement | SUM | Jun 2020 | $495k | $315k |
| Rank 7of 7 | SUM-S Van Buren/W WaterlooPavement | SUM | Jun 2020 | $672k | $540k |
| Rank 7of 8 | POR-US 224/US 224D-13.51/00.00Pavement | POR | May 2020 | $1.43M | $1.17M |
| Rank 3of 4 | LOR-SR 83-10.50Pavement | LOR | Apr 2020 | $1.07M | $944k |
| Rank 2of 5 | CUY-US 6/US 20-20.74/22.94Pavement | CUY | Apr 2020 | $3.57M | $3.44M |
| Rank 4of 4 | D04-SP FY2020 (West)Pavement | D04 | Apr 2020 | $1.33M | $1.18M |
| Rank 2of 4 | GEA-SR 306-07.96Pavement | GEA | Apr 2020 | $836k | $782k |
| Rank 3of 6 | GEA-SR 700-00.00Pavement | GEA | Apr 2020 | $808k | $738k |
| Rank 2of 3 | D12-PPM FY2020Pavement | D12 | Mar 2020 | $1.35M | $1.26M |
| Rank 3of 6 | D04-SP FY2020 (East)Pavement | D04 | Mar 2020 | $759k | $672k |
| Wonof 5 | LOR-Findley State Park Main RdPavement | LOR | Mar 2020 | $522k | $522k |
| Rank 3of 4 | MAH-/TRU-US 62/VAR-19.36/VARPavement | MAH | Mar 2020 | $2.69M | $2.51M |
| Rank 2of 8 | LAK-CS Stevens BoulevardPavement | LAK | Mar 2020 | $3.19M | $3.07M |
| Rank 2of 4 | LAK-SR 535-00.62Pavement | LAK | Mar 2020 | $822k | $819k |
| Rank 2of 4 | GEA-SR 306-12.08Pavement | GEA | Feb 2020 | $879k | $800k |
| Wonof 6 | POR-SR 43D/SR 59-00.53/00.00Pavement | POR | Feb 2020 | $1.07M | $1.07M |
| Rank 4of 4 | WAY-SR 83-16.31Pavement | WAY | Feb 2020 | $6.53M | $5.87M |
| Rank 2of 4 | MAH-US 62/VAR-09.67/VARPavement | MAH | Feb 2020 | $3.54M | $3.53M |
| Rank 2of 4 | GEA-SR 608-02.45/04.58Pavement | GEA | Feb 2020 | $311k | $284k |
| Rank 2of 6 | CUY-East 55th StreetPavement | CUY | Feb 2020 | $1.49M | $1.47M |
| Rank 5of 5 | COL-SR 46-01.37Pavement | COL | Nov 2018 | $1.34M | $1.04M |
| Rank 5of 5 | MED-IR 76-00.73Pavement | MED | Nov 2018 | $5.23M | $3.57M |
| Rank 3of 3 | ATB-US 20/SR 84-06.35/14.23Pavement | ATB | Nov 2018 | $2.26M | $1.86M |
| Rank 3of 3 | TRU-IR 80-04.71Pavement | TRU | Oct 2018 | $2.15M | $1.52M |
| Rank 5of 5 | WAY-SR 83-00.00Pavement | WAY | Oct 2018 | $4.84M | $3.55M |
| Rank 4of 4 | LOR-SR 18-00.00Pavement | LOR | Sep 2018 | $3.78M | $3.37M |
| Rank 5of 5 | MED-SMOOTH FY2019 (B)Pavement | MED | Aug 2018 | $3.91M | $3.36M |
| Rank 4of 4 | STA-SR 44/SR 153/SR 173-14.67/06.25/00.00Pavement | STA | Jul 2018 | $3.47M | $2.96M |
| Rank 6of 6 | TRU-SR 534-13.26Pavement | TRU | Jun 2018 | $1.47M | $1.12M |
| Rank 4of 6 | ATB-SP FY2018 (East)Maintenance | ATB | Jun 2018 | $841k | $593k |
| Rank 2of 4 | WAY-SR 57-02.20Pavement | WAY | May 2018 | $1.96M | $1.91M |
| Rank 3of 4 | MED-RM-FY2018Maintenance | MED | May 2018 | $293k | $245k |
| Rank 2of 3 | CUY-/LAK PPM FY2018Maintenance | CUY | May 2018 | $1.69M | $1.69M |
| Rank 6of 7 | WAY-SR 3-19.62Pavement | WAY | May 2018 | $1.19M | $1.01M |
| Wonof 6 | LOR-SR 10-06.53Pavement | LOR | May 2018 | $494k | $494k |
| Rank 5of 7 | CUY-Prospect AvePavement | CUY | May 2018 | $1.77M | $1.53M |
| Wonof 6 | LAK-SR 283/SR 535-16.19/00.00Pavement | LAK | Apr 2018 | $931k | $931k |
| Rank 3of 7 | MED-SR 57-00.00Pavement | MED | Apr 2018 | $1.55M | $1.45M |
| Rank 4of 7 | SUM-US 224/SR 532-14.84/00.00Pavement | SUM | Apr 2018 | $1.19M | $1.09M |
| Rank 3of 5 | CUY-US 322-03.82/04.90Pavement | CUY | Apr 2018 | $1.77M | $1.64M |
| Rank 4of 4 | WAY-US 250-14.60Pavement | WAY | Apr 2018 | $5.17M | $4.36M |
| Rank 5of 7 | ATB-SR 11/SR 45-13.94/24.07Pavement | ATB | Apr 2018 | $4.34M | $3.82M |
| Rank 2of 5 | WAY-SR 83-14.64Pavement | WAY | Apr 2018 | $764k | $758k |
| Rank 2of 6 | LAK-SR 528-00.00/04.21Pavement | LAK | Apr 2018 | $997k | $970k |
| Rank 2of 4 | SUM-SP FY2018 (West)Maintenance | SUM | Mar 2018 | $1.39M | $1.33M |
| Wonof 7 | CUY-SR 91-07.73Pavement | CUY | Mar 2018 | $884k | $884k |
| Wonof 5 | WAY-SR 21-01.80Pavement | WAY | Mar 2018 | $1.67M | $1.67M |
| Rank 3of 6 | GEA-SR 528-16.48Pavement | GEA | Mar 2018 | $2.08M | $2.03M |
| Rank 2of 6 | GEA-SR 166-00.00/VARPavement | GEA | Mar 2018 | $705k | $698k |
| Rank 3of 4 | SUM-SR 91-VARMaintenance | SUM | Mar 2018 | $1.30M | $1.09M |
| Rank 3of 6 | SUM-IR 271-06.62Pavement | SUM | Feb 2018 | $1.94M | $1.70M |
| Rank 5of 5 | CUY-IR 480-19.21Pavement | CUY | Feb 2018 | $4.71M | $3.73M |
| Rank 7of 8 | TRU-SR 5-00.00Pavement | TRU | Feb 2018 | $3.37M | $2.97M |
| Rank 6of 10 | SUM-Olde Eight Rd Phase 1Pavement | SUM | Feb 2018 | $691k | $616k |
| Rank 5of 7 | POR-SR 303-02.71Pavement | POR | Feb 2018 | $510k | $449k |
| Rank 4of 6 | GEA-US 6-00.00Pavement | GEA | Feb 2018 | $724k | $661k |
| Rank 5of 7 | ATB-SR 45-01.87Pavement | ATB | Jan 2018 | $2.40M | $2.09M |
| Wonof 7 | GEA-SR-SR 306-00.00Pavement | GEA | Jan 2018 | $948k | $948k |
| Rank 3of 7 | POR-SR 305/SR 700-0.00/VARPavement | POR | Jan 2018 | $1.48M | $1.38M |
| Rank 3of 4 | ATB-SR 531-06.86Pavement | ATB | Jan 2018 | $1.52M | $1.35M |
| Wonof 3 | CUY-SR 176-12.83Pavement | CUY | Jan 2018 | $1.24M | $1.24M |
| Rank 3of 6 | GEA-SR-SR 700-02.71Pavement | GEA | Jan 2018 | $640k | $562k |
| Wonof 5 | LAK-SR-SR 86-05.49Maintenance | LAK | Jan 2018 | $497k | $497k |
| Rank 2of 3 | SUM-/POR-IR 480/SR 14-0.00/VARPavement | SUM | Jan 2018 | $3.05M | $2.79M |
| Rank 5of 5 | LOR-SR 58-00.00Pavement | LOR | Jan 2018 | $1.84M | $1.74M |
Source: public.bid_results, ODOT bid tabs. Bidder strings are normalized to upper-case but not yet entity-resolved, so related firms (e.g. "Shelly Company" vs "Shelly & Sands") are shown separately.