Ohio DOT · bid history
| Result | Project | County | Let | Their bid | Winning bid |
|---|---|---|---|---|---|
| Rank 4of 4 | GEA-SR 528-14.52Pavement | GEA | Mar 2026 | $509k | $400k |
| Rank 5of 7 | CUY-SR 87-14.72Pavement | CUY | Feb 2026 | $803k | $669k |
| Rank 7of 8 | LAK-SR 174-00.00Pavement | LAK | Jan 2026 | $2.00M | $1.73M |
| Rank 7of 7 | LAK-SR 84/VAR-18.21/VARPavement | LAK | Jan 2026 | $1.77M | $1.13M |
| Rank 4of 7 | LAK-SR 174-04.39Pavement | LAK | Dec 2025 | $980k | $747k |
| Rank 6of 6 | LAK-US 20-17.13Pavement | LAK | Dec 2025 | $1.20M | $901k |
| Rank 6of 6 | GEA-SR 87-02.73Pavement | GEA | Sep 2025 | $1.91M | $1.36M |
| Rank 4of 4 | COL-SR 39/SR 45-13.06/00.37Pavement | COL | Sep 2025 | $1.55M | $1.35M |
| Rank 3of 3 | STA-US 62-36.42/38.60Pavement | STA | Sep 2025 | $1.82M | $1.62M |
| Rank 4of 4 | TRU-SR 193-00.00Pavement | TRU | Aug 2025 | $1.33M | $1.05M |
| Rank 8of 8 | SUM-SR 21-19.57/VARPavement | SUM | Jul 2025 | $1.33M | $812k |
| Rank 2of 2 | TRU-SR 46-08.01Pavement | TRU | Jun 2025 | $1.65M | $1.43M |
| Wonof 1 | STA-SR 44-00.00Pavement | STA | Jun 2025 | $2.51M | $2.51M |
| Rank 2of 4 | LAK-SR 84-01.00Pavement | LAK | Jun 2025 | $2.56M | $2.50M |
| Rank 2of 5 | TRU-Elmwood Dr (Hubbard)Pavement | TRU | Jun 2025 | $519k | $443k |
| Wonof 2 | D04-SP FY2025 (West)Pavement | D04 | May 2025 | $1.27M | $1.27M |
| Rank 2of 3 | TRU-N River Rd Parking LotPavement | TRU | Apr 2025 | $219k | $204k |
| Wonof 5 | GEA-Punderson State ParkPavement | GEA | Mar 2025 | $828k | $828k |
| Rank 4of 6 | TUS-New Phila Paving Phase 2Pavement | TUS | Mar 2025 | $1.12M | $863k |
| Rank 2of 4 | COL-ODNR GUILFORD LAKE STATE PARPavement | COL | Feb 2025 | $1.10M | $986k |
| Rank 3of 3 | WAY-SR 94/US 30A-06.70/00.00Pavement | WAY | Feb 2025 | $1.45M | $1.45M |
| Rank 2of 2 | GEA-US 422-01.46/VAR DrainageDrainage | GEA | Feb 2025 | $907k | $640k |
| Rank 5of 5 | TRU-SR 45-23.76Pavement | TRU | Dec 2024 | $1.57M | $1.15M |
| Rank 5of 5 | COL-SR-SR 9/VAR-14.72/VARPavement | COL | Nov 2024 | $932k | $811k |
| Rank 3of 5 | SUM-SR 82-00.14/08.04Pavement | SUM | Nov 2024 | $2.96M | $2.74M |
| Rank 4of 4 | TUS-US 39-15.45Pavement | TUS | Oct 2024 | $1.58M | $1.32M |
| Rank 4of 4 | TRU-SR 46-11.20Bridge | TRU | Oct 2024 | $1.06M | $778k |
| Rank 4of 6 | TUS-SR 516-03.70Pavement | TUS | Sep 2024 | $1.13M | $1.07M |
| Rank 2of 2 | TRU-SR 534-00.75Pavement | TRU | Aug 2024 | $1.47M | $1.36M |
| Rank 2of 4 | MED-SR 94-07.64Pavement | MED | May 2024 | $543k | $467k |
| Rank 2of 3 | D04-SP FY2024 (West)Pavement | D04 | May 2024 | $1.09M | $1.07M |
| Rank 4of 4 | STA-Middle Branch TrailSafety | STA | May 2024 | $696k | $611k |
| Rank 2of 2 | CAR-SR 332-10.40Safety | CAR | May 2024 | $1.39M | $1.04M |
| Rank 2of 2 | JEF-SR 7 Brilliant Park-N-RidePavement | JEF | May 2024 | $308k | $257k |
| Rank 2of 4 | D04-SP FY2024 (East)Pavement | D04 | Apr 2024 | $1.56M | $1.18M |
| Rank 3of 3 | CUY-Quigley Rd/West 3rd StPavement | CUY | Apr 2024 | $3.36M | $3.18M |
| Rank 5of 6 | LAK-US 6-00.44Pavement | LAK | Mar 2024 | $1.31M | $1.14M |
| Rank 4of 4 | TRU-SR 46/SR 169-03.73/04.58Pavement | TRU | Mar 2024 | $1.98M | $1.58M |
| Rank 3of 3 | LOR-/MED-SR 162Pavement | LOR | Mar 2024 | $4.20M | $3.81M |
| Rank 5of 6 | GEA-SR 608-00.00/05.22Pavement | GEA | Feb 2024 | $827k | $672k |
| Rank 5of 6 | CUY-SR 237-03.75Pavement | CUY | Feb 2024 | $1.39M | $1.23M |
| Rank 5of 7 | CUY-US 6-26.65Pavement | CUY | Jan 2024 | $1.97M | $1.60M |
| Wonof 2 | MAH-SR 165-21.76Pavement | MAH | Jan 2024 | $1.41M | $1.41M |
| Rank 2of 6 | LAK-Liberty StreetPavement | LAK | Jan 2024 | $1.07M | $970k |
| Rank 6of 7 | SUM-SR 18-01.01Pavement | SUM | Jan 2024 | $2.45M | $1.90M |
| Rank 3of 8 | POR-Frost Rd Ph 2 (Streetsboro)Pavement | POR | Dec 2023 | $518k | $497k |
| Rank 5of 5 | SUM-SR 59-07.95Pavement | SUM | Aug 2023 | $4.60M | $3.55M |
| Rank 2of 4 | GEA-LaDue Boat Launch PavementPavement | GEA | Jun 2023 | $83k | $76k |
| Rank 4of 4 | GEA-SR 88-03.40Pavement | GEA | Jun 2023 | $1.30M | $1.04M |
| Rank 3of 3 | D04-SP FY2023 (East)Pavement | D04 | May 2023 | $2.38M | $1.63M |
| Rank 3of 4 | SUM-CR 662-00.00 (4th St)Pavement | SUM | Apr 2023 | $770k | $665k |
| Wonof 5 | SUM-/POR-CR 10/45-00.00/03.33Pavement | SUM | Apr 2023 | $793k | $793k |
| Rank 4of 5 | SUM-Valley View Rd (Macedonia)Pavement | SUM | Apr 2023 | $313k | $295k |
| Rank 3of 6 | TRU-Ellsworth-Bailey RdPavement | TRU | Mar 2023 | $361k | $356k |
| Rank 8of 8 | CUY-York RoadPavement | CUY | Mar 2023 | $1.05M | $848k |
| Wonof 1 | CUY-SRTS FY2022 Maple HtsSafety | CUY | Feb 2023 | $236k | $236k |
| Rank 2of 4 | STA-SR 43/VAR-12.70/VARPavement | STA | Jan 2023 | $3.01M | $2.98M |
| Rank 6of 6 | GEA-SR 87-07.70Pavement | GEA | Jan 2023 | $1.87M | $1.33M |
| Rank 3of 4 | CAR-/HAS-SR 212-VARPavement | CAR | Dec 2022 | $2.43M | $2.08M |
| Rank 2of 3 | STA-SR 687-01.40Pavement | STA | Dec 2022 | $2.57M | $2.39M |
| Rank 2of 3 | LAK-Kirtland RoadPavement | LAK | Dec 2022 | $311k | $300k |
| Rank 5of 5 | STA-SR 297/SR 627-00.66/00.37Pavement | STA | Nov 2022 | $1.44M | $1.09M |
| Rank 3of 3 | STA-SR 44/SR 153-12.16/05.99Pavement | STA | Nov 2022 | $1.38M | $946k |
| Rank 4of 4 | STA-SR 183-06.47Pavement | STA | Oct 2022 | $2.97M | $2.01M |
| Rank 4of 4 | POR-SR 88-13.71Pavement | POR | Aug 2022 | $1.12M | $879k |
| Rank 2of 5 | SUM-CR 17-01.36 (Cleve-Mass)Pavement | SUM | Aug 2022 | $972k | $810k |
| Rank 5of 6 | SUM-SR 176/SR 303-00.23/00.00Pavement | SUM | Aug 2022 | $3.11M | $2.38M |
| Rank 3of 3 | HOL-SR 514-04.51Pavement | HOL | Jul 2022 | $355k | $262k |
| Wonof 7 | SUM-Gilchrist Rd Ph1 (Mogadore)Pavement | SUM | Jun 2022 | $699k | $699k |
| Rank 3of 3 | TUS-IR 77-31.54Pavement | TUS | Jun 2022 | $930k | $556k |
| Rank 3of 4 | COL-SR 170-11.42Pavement | COL | Jun 2022 | $1.38M | $1.06M |
| Rank 2of 3 | D04-SP FY2022 (West)Pavement | D04 | May 2022 | $2.76M | $1.89M |
| Rank 4of 6 | SUM-CR 17-23.27 Brecksville RdPavement | SUM | May 2022 | $1.14M | $1.08M |
| Rank 4of 5 | LOR-US 6-12.36Pavement | LOR | Apr 2022 | $1.44M | $1.22M |
| Rank 7of 7 | POR-CR 197-01.03 (Frost Rd)Pavement | POR | Mar 2022 | $812k | $690k |
| Wonof 4 | SUM-Munroe Falls AvePavement | SUM | Mar 2022 | $344k | $344k |
| Rank 4of 4 | TUS-SR 211-00.21Pavement | TUS | Mar 2022 | $443k | $371k |
| Rank 4of 4 | D12-PPM FY2022Pavement | D12 | Mar 2022 | $2.91M | $1.97M |
| Rank 2of 5 | SUM-SR 93/SR 162-09.10/07.26Pavement | SUM | Mar 2022 | $2.69M | $2.48M |
| Rank 5of 5 | CUY-SR 91-10.63Pavement | CUY | Mar 2022 | $1.05M | $848k |
| Rank 2of 5 | CUY-SR 17-20.44Pavement | CUY | Feb 2022 | $906k | $865k |
| Rank 5of 5 | TRU-Hallock-Young RdPavement | TRU | Jan 2022 | $1.89M | $1.62M |
| Wonof 5 | SUM-North River RoadPavement | SUM | May 2021 | $631k | $631k |
| Rank 4of 4 | D04-SP FY2021 (West)Pavement | D04 | May 2021 | $1.69M | $1.12M |
| Rank 5of 5 | D04-SP FY2021 (East)Pavement | D04 | May 2021 | $699k | $498k |
| Rank 4of 6 | SUM-2nd St/Wooster Rd/Norton RdPavement | SUM | Apr 2021 | $1.21M | $1.08M |
| Wonof 4 | D11-SP FY2021Pavement | D11 | Apr 2021 | $1.20M | $1.20M |
| Rank 7of 7 | CUY-SR 14-06.09Pavement | CUY | Feb 2021 | $1.76M | $1.38M |
| Rank 4of 9 | COL-SR 164-04.53Pavement | COL | Feb 2021 | $947k | $766k |
| Rank 4of 5 | LAK-US 20-28.14Pavement | LAK | Jan 2021 | $1.35M | $1.14M |
| Rank 5of 6 | CAR-SR 43-24.05Pavement | CAR | Jan 2021 | $733k | $562k |
| Rank 7of 7 | CUY-SR 17-00.00Pavement | CUY | Jan 2021 | $2.61M | $2.18M |
| Rank 8of 8 | CUY-West 14th StreetPavement | CUY | Dec 2020 | $1.79M | $1.23M |
| Rank 2of 8 | LAK-SR 283-06.82Pavement | LAK | Dec 2020 | $527k | $498k |
| Rank 6of 6 | MAH-SR 7-00.00 (PART 1 AND PART 2)Pavement | MAH | Dec 2020 | $1.14M | $894k |
| Rank 8of 9 | TUS-SR 516-00.00Pavement | TUS | Dec 2020 | $880k | $725k |
| Rank 8of 8 | STA-SR 225-00.78Pavement | STA | Nov 2020 | $1.54M | $1.30M |
| Rank 2of 2 | POR-/TRU-SR 305/SR 534-05.65/VARPavement | POR | Oct 2020 | $1.29M | $1.11M |
| Rank 4of 5 | LAK-SR 84-03.61Pavement | LAK | Oct 2020 | $1.73M | $1.39M |
| Wonof 3 | ATB-SR 534-17.04/21.21Pavement | ATB | Aug 2020 | $842k | $842k |
| Rank 5of 7 | SUM-SR 18-04.91/07.98Pavement | SUM | Jul 2020 | $2.19M | $1.93M |
| Rank 4of 5 | SUM-IR 76-06.40Pavement | SUM | Jun 2020 | $395k | $315k |
| Rank 2of 7 | SUM-S Van Buren/W WaterlooPavement | SUM | Jun 2020 | $549k | $540k |
| Rank 5of 5 | ASD-RM FY2020Pavement | ASD | Jun 2020 | $1.00M | $467k |
| Rank 8of 8 | POR-US 224/US 224D-13.51/00.00Pavement | POR | May 2020 | $1.55M | $1.17M |
| Rank 3of 3 | CUY-SRTS FY2020 EuclidSafety | CUY | May 2020 | $137k | $109k |
| Rank 4of 4 | GUE-Salt Fork Resurfacing FY20Pavement | GUE | May 2020 | $2.61M | $2.20M |
| Rank 4of 4 | ASD-US 250-12.22Pavement | ASD | May 2020 | $1.35M | $1.13M |
| Rank 4of 4 | D11-SP-FY2020Pavement | D11 | Apr 2020 | $1.03M | $952k |
| Rank 6of 6 | GEA-SR 700-00.00Pavement | GEA | Apr 2020 | $946k | $738k |
| Rank 5of 5 | CUY-US 6/US 20-20.74/22.94Pavement | CUY | Apr 2020 | $3.89M | $3.44M |
| Rank 3of 4 | D04-SP FY2020 (West)Pavement | D04 | Apr 2020 | $1.25M | $1.18M |
| Rank 4of 6 | D04-SP FY2020 (East)Pavement | D04 | Mar 2020 | $783k | $672k |
| Wonof 3 | D12-PPM FY2020Pavement | D12 | Mar 2020 | $1.26M | $1.26M |
| Rank 3of 3 | FRA-IR 270-52.14 Spot PavePavement | FRA | Mar 2020 | $1.64M | $990k |
| Rank 3of 4 | LAK-SR 535-00.62Pavement | LAK | Mar 2020 | $837k | $819k |
| Rank 5of 6 | TUS-SR 39-10.24Pavement | TUS | Mar 2020 | $1.05M | $885k |
| Rank 2of 5 | LOR-Findley State Park Main RdPavement | LOR | Mar 2020 | $559k | $522k |
| Rank 3of 6 | POR-SR 43D/SR 59-00.53/00.00Pavement | POR | Feb 2020 | $1.15M | $1.07M |
| Rank 5of 6 | CUY-East 55th StreetPavement | CUY | Feb 2020 | $1.59M | $1.47M |
| Rank 3of 3 | TUS-IR 77-20.16/TUS-US 250-18.90Bridge | TUS | Feb 2020 | $1.88M | $1.60M |
| Rank 3of 3 | HAS-US 250-22.03Pavement | HAS | Dec 2018 | $3.11M | $2.28M |
| Rank 4of 5 | COL-SR 46-01.37Pavement | COL | Nov 2018 | $1.19M | $1.04M |
| Rank 3of 3 | BEL-SR 149-00.28Pavement | BEL | Nov 2018 | $774k | $505k |
| Rank 2of 6 | COL-US 30-17.80Pavement | COL | Oct 2018 | $316k | $295k |
| Rank 3of 7 | COL-SR 518-0.00/4.80Pavement | COL | Sep 2018 | $996k | $923k |
| Rank 5of 6 | TRU-SR 534-13.26Pavement | TRU | Jun 2018 | $1.41M | $1.12M |
| Rank 3of 4 | CAR-SR 183-00.00Pavement | CAR | Jun 2018 | $579k | $494k |
| Wonof 5 | D11-SP-FY2019(A)Pavement | D11 | Jun 2018 | $848k | $848k |
| Rank 2of 6 | ATB-SP FY2018 (East)Maintenance | ATB | Jun 2018 | $690k | $593k |
| Rank 7of 7 | WAY-SR 3-19.62Pavement | WAY | May 2018 | $1.26M | $1.01M |
| Wonof 6 | TUS-SR 259-00.55Pavement | TUS | May 2018 | $328k | $328k |
| Wonof 4 | MED-RM-FY2018Maintenance | MED | May 2018 | $245k | $245k |
| Rank 2of 3 | HAS-SP-FY2018(C)Maintenance | HAS | May 2018 | $398k | $389k |
| Rank 3of 6 | LOR-SR 10-06.53Pavement | LOR | May 2018 | $524k | $494k |
| Rank 4of 7 | CUY-Prospect AvePavement | CUY | May 2018 | $1.76M | $1.53M |
| Rank 3of 4 | CAR-SR 9-14.61Maintenance | CAR | May 2018 | $2.02M | $1.82M |
| Rank 6of 7 | MED-SR 57-00.00Pavement | MED | Apr 2018 | $1.61M | $1.45M |
| Rank 5of 6 | LAK-SR 283/SR 535-16.19/00.00Pavement | LAK | Apr 2018 | $1.05M | $931k |
| Rank 4of 6 | CAR-SR 39-00.00Pavement | CAR | Apr 2018 | $2.03M | $1.71M |
| Rank 3of 7 | SUM-US 224/SR 532-14.84/00.00Pavement | SUM | Apr 2018 | $1.19M | $1.09M |
| Rank 5of 5 | CUY-US 322-03.82/04.90Pavement | CUY | Apr 2018 | $1.93M | $1.64M |
| Rank 6of 6 | LAK-SR 528-00.00/04.21Pavement | LAK | Apr 2018 | $1.23M | $970k |
| Rank 3of 5 | WAY-SR 83-14.64Pavement | WAY | Apr 2018 | $784k | $758k |
| Rank 6of 6 | STA-US 30-21.55Maintenance | STA | Apr 2018 | $784k | $676k |
| Wonof 4 | SUM-SP FY2018 (West)Maintenance | SUM | Mar 2018 | $1.33M | $1.33M |
| Rank 5of 5 | WAY-SR 21-01.80Pavement | WAY | Mar 2018 | $2.07M | $1.67M |
| Rank 4of 7 | CUY-SR 91-07.73Pavement | CUY | Mar 2018 | $948k | $884k |
| Rank 6of 6 | GEA-SR 528-16.48Pavement | GEA | Mar 2018 | $2.48M | $2.03M |
| Rank 2of 4 | SUM-SR 91-VARMaintenance | SUM | Mar 2018 | $1.13M | $1.09M |
| Rank 6of 6 | GEA-SR 166-00.00/VARPavement | GEA | Mar 2018 | $938k | $698k |
| Rank 5of 5 | TUS-SR 416-09.85Pavement | TUS | Feb 2018 | $1.49M | $1.06M |
| Rank 9of 10 | COL-SR 45-23.70Signals | COL | Feb 2018 | $1.20M | $945k |
| Rank 10of 10 | SUM-Olde Eight Rd Phase 1Pavement | SUM | Feb 2018 | $750k | $616k |
| Wonof 7 | POR-SR 303-02.71Pavement | POR | Feb 2018 | $449k | $449k |
| Rank 6of 6 | GEA-US 6-00.00Pavement | GEA | Feb 2018 | $885k | $661k |
| Rank 8of 8 | TRU-SR 5-00.00Pavement | TRU | Feb 2018 | $3.38M | $2.97M |
| Rank 5of 5 | STA-SR 153/SR 172-07.47/19.51Pavement | STA | Feb 2018 | $1.48M | $1.25M |
| Rank 5of 7 | GEA-SR-SR 306-00.00Pavement | GEA | Jan 2018 | $1.27M | $948k |
| Rank 5of 5 | CAR-SR 164-07.27Pavement | CAR | Jan 2018 | $3.01M | $2.25M |
| Rank 6of 7 | POR-SR 305/SR 700-0.00/VARPavement | POR | Jan 2018 | $1.76M | $1.38M |
| Rank 4of 6 | GEA-SR-SR 700-02.71Pavement | GEA | Jan 2018 | $730k | $562k |
| Rank 5of 5 | LAK-SR-SR 86-05.49Maintenance | LAK | Jan 2018 | $677k | $497k |
| Rank 2of 5 | ASD-Mohican SP FY2018Maintenance | ASD | Jan 2018 | $1.36M | $1.34M |
| Rank 4of 5 | LOR-SR 58-00.00Pavement | LOR | Jan 2018 | $1.82M | $1.74M |
Source: public.bid_results, ODOT bid tabs. Bidder strings are normalized to upper-case but not yet entity-resolved, so related firms (e.g. "Shelly Company" vs "Shelly & Sands") are shown separately.