BEL-US 40-20.50
BEL County · est $0.4M
Bid dateThursday, April 19—
BEL County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1Cornerstone Electric INC | R2Complete General Construction Company | R3Miller Cable Company | R4Asplundh Construction LLC | % of bid |
|---|---|---|---|---|---|---|
| 809E69000 ADVANCE RADAR DETECTION | 6 EACH | $7,500 | $5,800 | $7,600 | $6,500 | 15% |
| 809E69100 STOP-BAR RADAR DETECTION | 5 EACH | $7,000 | $6,000 | $7,100 | $6,100 | 12% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 6 EACH | $3,500 | $4,500 | $6,765 | $3,200 | 7% |
| 633E65522 CABINET, TYPE 332L | 3 EACH | $6,800 | $8,000 | $8,000 | $7,840 |
| Item | Quantity | R1Cornerstone Electric INC | R2Complete General Construction Company | R3Miller Cable Company | R4Asplundh Construction LLC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $3,000 | $250 | $3,500 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 13 FT | $10.00 | $20.00 | $12.20 | $23.00 |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 1 EACH | $150 | $300 | $365 | $195 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 7% |
| 632E80302 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 3 | 4 EACH | $4,600 | $6,500 | $4,500 | $4,600 | 6% |
| 632E85201 COMBINATION STRAIN POLE, TYPE TC-81.10, DESIGN 12, | 2 EACH | $8,600 | $11,500 | $8,900 | $11,100 | 6% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 18 EACH | $900 | $850 | $1,100 | $780 | 6% |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 3 EACH | $5,300 | $4,000 | $5,800 | $5,400 | 5% |
| 632E64000 STRAIN POLE FOUNDATION | 4 EACH | $3,500 | $6,000 | $7,350 | $3,860 | 5% |
| 632E83100 STRAIN POLE, TYPE TC-81.10, DESIGN 11 | 2 EACH | $6,500 | $7,500 | $5,500 | $5,800 | 4% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $65.00 | $70.00 | $75.00 | $68.00 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $2,000 | $8,120 | $40,000 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10,000 | $10,000 | $20,000 | 3% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, (3") | 277 FT | $35.00 | $45.00 | $40.00 | $60.00 | 3% |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 5 EACH | $1,500 | $1,300 | $1,500 | $1,270 | 3% |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 409 FT | $15.00 | $17.00 | $18.00 | $16.00 | 2% |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 2,000 FT | $3.00 | $3.75 | $3.00 | $2.85 | 2% |
| 632E75012 SIGNAL SUPPORT, TYPE TC-81.21 DESIGN 3 POLE, WITH | 1 EACH | $5,500 | $8,000 | $6,000 | $5,400 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $1,000 | $700 | $6,000 | 2% |
| 632E70001 POWER SERVICE, AS PER PLAN | 3 EACH | $1,500 | $2,000 | $1,500 | $1,750 | 2% |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 19 EACH | $150 | $150 | $115 | $85.00 |
| 630E80100 SIGN, FLAT SHEET | 122.9 SF | $25.00 | $30.00 | $16.00 | $36.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 80 SF | $50.00 | $35.00 | $24.50 | $28.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $25.00 | $50.00 | $15.00 | $60.00 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 2 EACH | $100 | $200 | $165 | $800 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 1 EACH | $50.00 | $50.00 | $280 | $340 |
| 611E00400 4" CONDUIT, TYPE E | 160 FT | $3.00 | $15.00 | $2.00 | $20.00 |
| 625E25500 CONDUIT, 3", 725.04 | 189 FT | $15.00 | $30.00 | $20.00 | $29.00 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, (2") | 70 FT | $32.50 | $28.00 | $30.00 | $55.00 |
| 625E29000 TRENCH | 147 FT | $10.00 | $12.00 | $15.00 | $14.30 |
| 625E30700 PULL BOX, 725.08, 18" | 5 EACH | $800 | $900 | $850 | $650 |
| 625E32000 GROUND ROD | 14 EACH | $200 | $200 | $265 | $180 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 2 EACH | $650 | $475 | $600 | $370 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 23 EACH | $20.00 | $40.00 | $35.00 | $60.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 2 EACH | $20.00 | $30.00 | $30.00 | $45.00 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 2 EACH | $200 | $250 | $175 | $188 |
| 632E30200 MESSENGER WIRE, 7 STRAND, 3/8" DIAMETER WITH ACCES | 409 FT | $7.50 | $13.00 | $18.00 | $15.15 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 246 FT | $2.50 | $3.00 | $2.80 | $3.10 |
| 632E64020 PEDESTAL FOUNDATION | 1 EACH | $650 | $1,400 | $700 | $840 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 159 FT | $5.00 | $6.25 | $2.00 | $3.50 |
| 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG | 151 FT | $5.00 | $6.25 | $2.00 | $5.80 |
| 632E80102 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 1 | 1 EACH | $4,000 | $6,000 | $4,000 | $3,600 |
| 632E89900 PEDESTAL, 8', TRANSFORMER BASE | 1 EACH | $1,000 | $1,000 | $550 | $550 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 3 EACH | $1,500 | $2,000 | $1,600 | $5,900 |
| 633E67100 CABINET FOUNDATION | 3 EACH | $1,500 | $2,000 | $2,800 | $1,800 |
| 633E67200 CONTROLLER WORK PAD | 3 EACH | $350 | $1,500 | $1,000 | $800 |
| 633E68511 COMMUNICATIONS, AS PER PLAN | 3 EACH | $1,500 | $1,800 | $1,750 | $2,800 |
| 633E99000 CONTROLLER ITEM, MISC.: CONTROLLER UNIT, INSTALLAT | 3 EACH | $500 | $675 | $1,000 | $800 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,400 | $2,100 | $2,972 | $1,350 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 809E69000 ADVANCE RADAR DETECTION | 6 EACH | $7,500 | $45k | 13% |
| 809E69100 STOP-BAR RADAR DETECTION | 5 EACH | $7,000 | $35k | 10% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 6 EACH | $3,500 | $21k | 6% |
| 633E65522 CABINET, TYPE 332L | 3 EACH | $6,800 | $20k | 6% |
| 632E80302 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 3 | 4 EACH | $4,600 | $18k | 5% |
| 632E85201 COMBINATION STRAIN POLE, TYPE TC-81.10, DESIGN 12, | 2 EACH | $8,600 | $17k | 5% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 18 EACH | $900 | $16k | 5% |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 3 EACH | $5,300 | $16k | 4% |
| 632E64000 STRAIN POLE FOUNDATION | 4 EACH | $3,500 | $14k | 4% |
| 632E83100 STRAIN POLE, TYPE TC-81.10, DESIGN 11 | 2 EACH | $6,500 | $13k | 4% |