WOO-Buck/Lime City Intersection
WOO County · est $3.5M
Bid dateThursday, June 7—
WOO County · est $3.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 150 more items below.
| Item | Quantity | R1Miller Bros Const INC | R2Geddis Paving & Excavating INC | R3Crestline Paving & Excavating CO INC | R4Vernon Nagel INC | % of bid |
|---|---|---|---|---|---|---|
| 611E53402 58" X 91" CONDUIT, TYPE B, 706.04 | 1,476 FT | $330 | $486 | $485 | $550 | 22% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,435 CY | $127 | $140 | $145 | $120 | 14% |
| 442E20250 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 837 CY | $161 | $190 | $152 | $157 | 6% |
| 304E20000 AGGREGATE BASE | 2,932 CY | $45.00 | $43.00 | $37.00 | $55.00 |
| Item | Quantity | R1Miller Bros Const INC | R2Geddis Paving & Excavating INC | R3Crestline Paving & Excavating CO INC | R4Vernon Nagel INC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $14,250 | $600 | $2,000 | $15,000 |
| 202E11000 STRUCTURE REMOVED | 1 LS | $4,000 | $1,600 | $1,630 | $10,000 |
| 202E20010 HEADWALL REMOVED | 5 EACH | $225 | $500 | $750 | $600 |
| 202E30000 WALK REMOVED | 1,826 SF | $1.55 | $0.30 | $1.00 | $2.00 |
| 202E32000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 442E20050 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE B ( | 647 CY | $175 | $192 | $181 | $175 | 5% |
| 203E20000 EMBANKMENT | 5,041 CY | $20.00 | $10.00 | $22.00 | $15.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $75,000 | $69,510 | $45,000 | 5% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 2,838 CY | $35.00 | $30.00 | $45.00 | $35.00 | 5% |
| 202E23000 PAVEMENT REMOVED | 12,817 SY | $5.50 | $5.00 | $7.00 | $5.50 | 3% |
| 608E10000 4" CONCRETE WALK | 13,940 SF | $4.65 | $5.60 | $5.00 | $7.00 | 3% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 6,480 FT | $10.00 | $12.00 | $13.00 | $15.00 | 3% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 4,147 FT | $15.50 | $18.50 | $17.00 | $18.00 | 3% |
| 611E04600 12" CONDUIT, TYPE C | 1,602 FT | $40.10 | $57.00 | $36.00 | $42.00 | 3% |
| 611E12100 27" CONDUIT, TYPE C | 777 FT | $82.00 | $121 | $100 | $65.00 | 3% |
| 659E00300 TOPSOIL | 1,804 CY | $35.00 | $16.50 | $40.00 | $25.00 | 3% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 1,194 SY | $51.00 | $56.00 | $46.00 | $65.00 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $60,000 | $80,000 | $100,000 | $100,000 | 3% |
| 452E11011 7" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, AS | 734 SY | $74.50 | $90.00 | $81.00 | $80.00 | 2% |
| 611E13400 30" CONDUIT, TYPE B | 544 FT | $95.00 | $162 | $135 | $115 | 2% |
| 203E10000 EXCAVATION | 4,616 CY | $10.00 | $10.00 | $14.50 | $20.00 | 2% |
| 140 FT |
| $2.25 |
| $3.50 |
| $7.00 |
| $2.00 |
| 202E32500 CURB AND GUTTER REMOVED | 1,550 FT | $2.00 | $1.50 | $5.00 | $2.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 1,908 FT | $14.50 | $18.25 | $19.00 | $12.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 949 FT | $20.00 | $24.50 | $20.00 | $28.00 |
| 202E53100 MAILBOX REMOVED | 8 EACH | $25.00 | $11.50 | $85.00 | $10.00 |
| 202E58000 MANHOLE REMOVED | 5 EACH | $245 | $755 | $700 | $500 |
| 202E58100 CATCH BASIN REMOVED | 13 EACH | $245 | $250 | $400 | $250 |
| 202E60010 MONUMENT ASSEMBLY REMOVED | 1 EACH | $90.00 | $150 | $200 | $200 |
| 202E75000 FENCE REMOVED | 31 FT | $5.50 | $5.50 | $12.00 | $10.00 |
| 202E75250 GATE REMOVED | 1 EACH | $215 | $215 | $850 | $250 |
| 204E10000 SUBGRADE COMPACTION | 17,463 SY | $0.40 | $0.25 | $1.00 | $0.25 |
| 204E13000 EXCAVATION OF SUBGRADE | 2,363 CY | $10.00 | $16.50 | $25.00 | $15.00 |
| 204E45000 PROOF ROLLING | 9 HOUR | $150 | $80.00 | $86.00 | $150 |
| 204E50000 GEOTEXTILE FABRIC | 17,463 SY | $0.70 | $0.75 | $1.40 | $1.25 |
| 206E15020 CEMENT STABILIZED SUBGRADE, 14 INCHES DEEP | 2,493 SY | $10.00 | $11.45 | $11.50 | $11.45 |
| 206E30000 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS | 1 LS | $7,500 | $14,000 | $13,900 | $15,000 |
| 607E20000 FENCE, TYPE CL | 31 FT | $79.50 | $79.50 | $100 | $90.00 |
| 608E13000 6" CONCRETE WALK | 607 SF | $5.95 | $6.60 | $6.00 | $8.00 |
| 608E52000 CURB RAMP | 1,408 SF | $9.25 | $10.25 | $9.00 | $14.00 |
| 608E53020 DETECTABLE WARNING | 209 SF | $8.00 | $8.00 | $8.00 | $8.00 |
| 623E38500 MONUMENT ASSEMBLY | 4 EACH | $995 | $900 | $990 | $800 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 8 EACH | $225 | $225 | $180 | $100 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 3 CY | $220 | $250 | $640 | $200 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $60.00 | $60.00 | $60.00 | $60.00 |
| 659E10000 SEEDING AND MULCHING | 16,254 SY | $0.70 | $0.70 | $0.70 | $0.70 |
| 659E14000 REPAIR SEEDING AND MULCHING | 813 SY | $0.70 | $0.70 | $0.70 | $0.70 |
| 659E15000 INTER-SEEDING | 813 SY | $0.40 | $0.40 | $0.40 | $0.40 |
| 659E20000 COMMERCIAL FERTILIZER | 2.19 TON | $600 | $600 | $600 | $600 |
| 659E31000 LIME | 3.36 ACRE | $30.00 | $30.00 | $30.00 | $30.00 |
| 659E35000 WATER | 90 MGAL | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,250 | $1,150 | $2,250 | $1,150 |
| 832E30000 EROSION CONTROL | 42,300 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $16,500 | $17,250 | $21,000 | $17,250 |
| 602E20000 CONCRETE MASONRY | 5.4 CY | $3,255 | $800 | $930 | $1,000 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 439 FT | $11.25 | $19.50 | $15.00 | $13.00 |
| 611E00100 4" CONDUIT, TYPE B | 100 FT | $6.70 | $5.00 | $29.00 | $10.00 |
| 611E00200 4" CONDUIT, TYPE C | 100 FT | $6.70 | $3.00 | $18.00 | $8.00 |
| 611E00406 4" CONDUIT, TYPE F | 100 FT | $6.70 | $3.00 | $20.00 | $10.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 537 FT | $13.85 | $12.50 | $39.00 | $28.00 |
| 611E00900 6" CONDUIT, TYPE B | 100 FT | $15.85 | $6.00 | $42.00 | $11.00 |
| 611E01100 6" CONDUIT, TYPE C | 148 FT | $15.85 | $12.00 | $26.00 | $20.00 |
| 611E01500 6" CONDUIT, TYPE F | 100 FT | $16.30 | $3.50 | $20.00 | $11.00 |
| 611E01800 8" CONDUIT, TYPE B | 100 FT | $20.90 | $7.00 | $39.00 | $12.00 |
| 611E02000 8" CONDUIT, TYPE C | 100 FT | $20.90 | $5.00 | $24.00 | $10.00 |
| 611E02600 8" CONDUIT, TYPE F | 100 FT | $20.90 | $5.00 | $25.00 | $10.00 |
| 611E03100 10" CONDUIT, TYPE B | 100 FT | $25.45 | $7.50 | $42.00 | $12.00 |
| 611E03300 10" CONDUIT, TYPE C | 100 FT | $25.45 | $5.50 | $30.00 | $10.00 |
| 611E03700 10" CONDUIT, TYPE F | 100 FT | $25.45 | $5.50 | $30.00 | $10.00 |
| 611E04400 12" CONDUIT, TYPE B | 780 FT | $40.10 | $66.00 | $65.00 | $75.00 |
| 611E04900 12" CONDUIT, TYPE D | 47 FT | $45.00 | $37.00 | $60.00 | $42.00 |
| 611E05200 12" CONDUIT, TYPE F | 100 FT | $24.00 | $8.00 | $27.00 | $12.00 |
| 611E05900 15" CONDUIT, TYPE B | 138 FT | $63.00 | $72.50 | $68.00 | $72.00 |
| 611E06100 15" CONDUIT, TYPE C | 180 FT | $48.50 | $36.50 | $44.00 | $38.00 |
| 611E07400 18" CONDUIT, TYPE B | 311 FT | $69.00 | $128 | $101 | $82.00 |
| 611E07600 18" CONDUIT, TYPE C | 54 FT | $66.00 | $72.00 | $64.00 | $54.00 |
| 611E08900 21" CONDUIT, TYPE B | 259 FT | $78.00 | $119 | $111 | $104 |
| 611E98150 CATCH BASIN, NO. 3 | 11 EACH | $3,300 | $2,180 | $3,200 | $4,500 |
| 611E98180 CATCH BASIN, NO. 3A | 6 EACH | $2,300 | $2,125 | $2,500 | $3,200 |
| 611E98370 CATCH BASIN, NO. 6 | 4 EACH | $2,150 | $2,250 | $2,300 | $3,800 |
| 611E98450 CATCH BASIN, NO. 2-2A | 3 EACH | $1,400 | $1,000 | $1,600 | $1,500 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $1,400 | $1,000 | $1,600 | $1,600 |
| 611E98510 CATCH BASIN, NO. 2-3 | 4 EACH | $1,600 | $1,200 | $1,750 | $2,000 |
| 611E99574 MANHOLE, NO. 3 | 11 EACH | $2,900 | $1,800 | $3,400 | $6,800 |
| 611E99584 MANHOLE, NO. 3 WITH 96" BASE I.D. AND 9" WEIR | 1 EACH | $8,500 | $11,200 | $9,400 | $15,000 |
| 611E99600 MANHOLE, NO. 4 | 6 EACH | $4,300 | $2,850 | $4,500 | $10,000 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 5 EACH | $185 | $450 | $400 | $200 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 10,000 LB | $0.50 | $1.50 | $1.45 | $0.50 |
| 895E10030 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 3 | 1 EACH | $28,500 | $27,800 | $19,000 | $25,000 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN | 2,763 SY | $4.30 | $3.00 | $3.20 | $2.50 |
| 301E48000 ASPHALT CONCRETE BASE, PG64-22 (DRIVEWAYS) | 82 CY | $225 | $250 | $300 | $225 |
| 407E10000 TACK COAT | 1,972 GAL | $2.00 | $1.00 | $3.00 | $2.00 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $400 | $330 | $400 | $400 |
| 452E09011 4" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, AS | 609 SY | $52.00 | $68.00 | $58.00 | $55.00 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 382 SY | $53.00 | $59.00 | $49.00 | $70.00 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 729 SY | $54.00 | $67.00 | $56.00 | $85.00 |
| 609E18001 COMBINATION CURB AND GUTTER, TYPE 3, AS PER PLAN | 540 FT | $17.75 | $21.00 | $20.00 | $22.00 |
| 609E26000 CURB, TYPE 6 | 2,160 FT | $11.00 | $13.50 | $13.00 | $18.00 |
| 609E28000 CURB, TYPE 7 | 451 FT | $12.00 | $15.00 | $13.00 | $15.00 |
| 611E01800 8" CONDUIT, TYPE B | 50 FT | $30.00 | $7.00 | $51.00 | $30.00 |
| 611E01800 8" CONDUIT, TYPE B, 706.02 | 89 FT | $65.00 | $180 | $94.00 | $110 |
| 611E02000 8" CONDUIT, TYPE C | 50 FT | $30.00 | $5.00 | $51.00 | $20.00 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $3,800 | $3,000 | $4,300 | $7,500 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 6 EACH | $1,250 | $1,000 | $1,000 | $1,000 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 6 EACH | $1,550 | $1,800 | $1,200 | $2,000 |
| 625E00450 CONNECTION, FUSED PULL APART | 32 EACH | $92.70 | $88.00 | $93.00 | $88.00 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 33 EACH | $89.25 | $82.00 | $90.00 | $82.00 |
| 625E10490 LIGHT POLE, CONVENTIONAL, (AT10B30) | 16 EACH | $1,766 | $1,884 | $1,770 | $1,884 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 16 EACH | $1,031 | $1,077 | $1,031 | $1,077 |
| 625E22990 NO. 6 AWG 600 VOLT DISTRIBUTION CABLE | 11,367 FT | $2.34 | $1.50 | $2.34 | $1.50 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 1,280 FT | $1.80 | $1.00 | $2.00 | $1.00 |
| 625E25408 CONDUIT, 2", 725.051 | 3,198 FT | $2.72 | $3.00 | $2.72 | $3.00 |
| 625E25500 CONDUIT, 3", 725.04 | 238 FT | $13.95 | $27.50 | $14.00 | $27.50 |
| 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN, 200W HPS, TY | 16 EACH | $383 | $395 | $383 | $395 |
| 625E29000 TRENCH | 3,436 FT | $5.97 | $3.00 | $6.00 | $3.00 |
| 625E30700 PULL BOX, 725.08, 18" | 11 EACH | $737 | $809 | $737 | $809 |
| 625E32000 GROUND ROD | 16 EACH | $174 | $195 | $175 | $195 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $3,293 | $9,134 | $3,293 | $9,134 |
| 625E36000 PLASTIC CAUTION TAPE | 3,436 FT | $0.29 | $0.30 | $0.30 | $0.30 |
| 625E75400 LIGHT POLE REMOVED | 5 EACH | $196 | $401 | $196 | $401 |
| 625E75402 LIGHT POLE REMOVED FOR STORAGE | 2 EACH | $274 | $601 | $274 | $601 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 7 EACH | $490 | $401 | $490 | $401 |
| 625E75504 LUMINAIRE REMOVED FOR STORAGE | 2 EACH | $127 | $100 | $127 | $100 |
| 625E75506 LUMINAIRE REMOVED | 5 EACH | $98.00 | $100 | $98.00 | $100 |
| 620E60000 DELINEATOR, POST SURFACE MOUNTED | 7 EACH | $110 | $110 | $110 | $110 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 268.1 FT | $10.50 | $10.50 | $10.50 | $10.50 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 465.1 FT | $11.50 | $11.50 | $12.50 | $11.50 |
| 630E08600 SIGN POST REFLECTOR | 43 EACH | $36.00 | $36.00 | $35.00 | $36.00 |
| 630E80100 SIGN, FLAT SHEET | 365.4 SF | $14.50 | $14.50 | $15.00 | $14.50 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 2 EACH | $875 | $875 | $875 | $875 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 25 EACH | $10.00 | $10.00 | $10.00 | $10.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 6 EACH | $45.00 | $45.00 | $45.00 | $45.00 |
| 630E85600 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND REERECTIO | 1 EACH | $285 | $285 | $285 | $285 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 18 EACH | $10.00 | $10.00 | $10.00 | $10.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 6 EACH | $95.00 | $95.00 | $95.00 | $95.00 |
| 630E86250 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 2 EACH | $1,875 | $1,875 | $1,875 | $1,875 |
| 630E86272 REMOVAL OF GROUND MOUNTED PIPE SUPPORT AND DISPOSA | 1 EACH | $140 | $140 | $140 | $140 |
| 644E00100 EDGE LINE, 4" | 0.49 MILE | $3,000 | $3,000 | $3,180 | $3,000 |
| 644E00300 CENTER LINE | 0.78 MILE | $5,000 | $5,000 | $6,358 | $6,000 |
| 644E00400 CHANNELIZING LINE, 8" | 1,692 FT | $1.50 | $1.50 | $2.12 | $2.00 |
| 644E00500 STOP LINE | 30 FT | $6.00 | $6.00 | $8.48 | $8.00 |
| 644E00600 CROSSWALK LINE | 180 FT | $15.00 | $15.00 | $6.36 | $6.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 266 FT | $6.00 | $6.00 | $6.36 | $6.00 |
| 644E01300 LANE ARROW | 14 EACH | $90.00 | $90.00 | $101 | $95.00 |
| 644E01382 WORD ON PAVEMENT, 48" | 1 EACH | $85.00 | $85.00 | $265 | $250 |
| 644E01520 DOTTED LINE, 12" | 308 FT | $2.00 | $2.00 | $5.30 | $5.00 |
| 644E20800 YIELD LINE | 127 FT | $20.00 | $20.00 | $15.90 | $15.00 |
| 661E00501 MULCH, AS PER PLAN | 56 CY | $60.00 | $60.00 | $60.00 | $60.00 |
| 661E14001 PERENNIALS, AS PER PLAN, AS PER PLAN | 256 EACH | $26.70 | $26.70 | $26.70 | $27.00 |
| 661E30061 EVERGREEN SHRUB, 2' HEIGHT, AS PER PLAN, AS PER PL | 18 EACH | $83.10 | $83.10 | $83.10 | $83.00 |
| 661E31001 LANDSCAPE WATERING, AS PER PLAN | 162 GAL | $20.00 | $20.00 | $20.00 | $20.00 |
| 661E40061 DECIDUOUS TREE, 1-1/2" CALIPER, AS PER PLAN, AS PE | 6 EACH | $272 | $272 | $272 | $272 |
| 410E11000 TRAFFIC COMPACTED SURFACE, TYPE B | 100 CY | $55.00 | $20.00 | $50.00 | $35.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 75 HOUR | $65.00 | $75.00 | $65.00 | $75.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $7,500 | $25,000 | $7,355 | $8,500 |
| 614E12600 REPLACEMENT DRUM | 25 EACH | $60.00 | $75.00 | $52.00 | $60.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 75 CY | $250 | $300 | $150 | $350 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.42 MILE | $4,000 | $4,000 | $5,299 | $5,000 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 1.45 MILE | $2,000 | $2,000 | $3,179 | $3,000 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 456 FT | $1.50 | $1.50 | $1.59 | $1.50 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 210 FT | $1.00 | $1.50 | $1.06 | $1.00 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 97 FT | $4.00 | $4.00 | $3.18 | $3.00 |
| 616E10000 WATER | 76 MGAL | $80.00 | $1.00 | $10.00 | $10.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $16,000 | $50,000 | $20,400 | $35,000 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $2,500 | $1.00 | $2,000 | $1,500 |
| 619E16010 FIELD OFFICE, TYPE B | 12 MNTH | $2,000 | $900 | $1,000 | $1,800 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $25,000 | $60,000 | $25,370 | $30,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E53402 58" X 91" CONDUIT, TYPE B, 706.04 | 1,476 FT | $330 | $487k | 15% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,435 CY | $127 | $309k | 9% |
| 442E20250 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 837 CY | $161 | $135k | 4% |
| 304E20000 AGGREGATE BASE | 2,932 CY | $45 | $132k | 4% |
| 442E20050 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE B ( | 647 CY | $175 | $113k | 3% |
| 203E20000 EMBANKMENT | 5,041 CY | $20 | $101k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 2,838 CY | $35 | $99k | 3% |
| 202E23000 PAVEMENT REMOVED | 12,817 SY | $5.5 | $70k | 2% |
| 608E10000 4" CONCRETE WALK | 13,940 SF | $4.65 | $65k | 2% |