HAM-IR 71-01.51
HAM County · est $1.5M
Bid dateThursday, September 13—
HAM County · est $1.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 3.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 41 more items below.
| Item | Quantity | R1Bansal Construction INC | R2Complete General Construction Company | R3Miller Cable Company | R4Asplundh Construction LLC | R5Perram Electric INC | R6U S Utility Contractor Company | % of bid |
|---|---|---|---|---|---|---|---|---|
| 630E97700 SIGNING, MISC.: WRONG WAY DETECTION SYSTEM | 17 EACH | $26,650 | $30,750 | $41,900 | $41,000 | $44,925 | $61,400 | 40% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 2" | 3,950 FT | $31.50 | $32.00 | $25.00 | $46.00 | $26.65 | $28.20 | 11% |
| 625E25400 CONDUIT, 2", 725.04 | 6,548 FT | $10.70 | $16.00 |
| Item | Quantity | R1Bansal Construction INC | R2Complete General Construction Company | R3Miller Cable Company | R4Asplundh Construction LLC | R5Perram Electric INC | R6U S Utility Contractor Company |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $4,600 | $900 | $17,500 | $2,950 | $29,180 |
| 659E10000 SEEDING AND MULCHING | 5,710 SY | $1.75 | $1.75 | $1.80 | $2.00 | $0.75 | $2.58 |
| 659E14000 REPAIR SEEDING AND MULCHING | 286 SY | $1.00 | $1.00 | $0.40 | $1.10 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $12.00 |
| $19.65 |
| $18.20 |
| $17.47 |
| 6% |
| 625E29001 TRENCH, AS PER PLAN | 6,458 FT | $9.65 | $6.50 | $24.00 | $11.70 | $19.87 | $8.31 | 6% |
| 632E26500 DETECTOR LOOP | 64 EACH | $875 | $1,350 | $1,450 | $1,400 | $1,990 | $1,466 | 5% |
| 632E64020 PEDESTAL FOUNDATION | 54 EACH | $950 | $775 | $800 | $810 | $752 | $968 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $20,000 | $40,000 | $40,000 | $93,300 | 4% |
| 632E90010 PEDESTAL, MISC.: PEDESTAL, 15', TRANSFORMER BASE | 56 EACH | $625 | $675 | $1,750 | $955 | $1,305 | $1,336 | 3% |
| 621E00100 RPM | 593 EACH | $50.25 | $50.25 | $50.25 | $36.00 | $50.25 | $46.48 | 3% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 500 HOUR | $50.00 | $70.00 | $75.00 | $72.00 | $70.00 | $85.10 | 2% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 694 FT | $32.70 | $43.00 | $40.00 | $60.00 | $33.65 | $39.90 | 2% |
| 625E30500 PULL BOX, 725.06, SIZE 1.5 | 50 EACH | $450 | $650 | $800 | $465 | $705 | $563 | 2% |
| 625E32000 GROUND ROD | 76 EACH | $280 | $270 | $265 | $260 | $240 | $160 | 2% |
| 632E70001 POWER SERVICE, AS PER PLAN | 17 EACH | $1,250 | $1,175 | $2,600 | $2,600 | $1,275 | $2,566 | 2% |
| 659E00300 TOPSOIL | 634 CY | $28.00 | $60.00 | $85.00 | $40.00 | $20.00 | $11.65 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $17,000 | $30,000 | $66,000 | $29,000 | $136,185 | $106,000 | 2% |
| 644E01360 WRONG WAY ARROW | 24 EACH | $665 | $675 | $665 | $830 | $665 | $745 | 1% |
| 625E30520 PULL BOX, 725.06, SIZE 7 | 24 EACH | $650 | $925 | $1,300 | $810 | $995 | $658 | 1% |
| 646E20320 WRONG WAY ARROW | 5 EACH | $2,985 | $4,000 | $2,985 | $5,750 | $2,985 | $3,343 | 1% |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 9,510 FT | $1.55 | $1.40 | $2.00 | $1.85 | $1.72 | $1.92 | 1% |
| $0.70 |
| $0.56 |
| 659E15000 INTER-SEEDING | 286 SY | $0.01 | $0.10 | $0.10 | $0.10 | $0.35 | $0.11 |
| 659E20000 COMMERCIAL FERTILIZER | 1.28 TON | $750 | $750 | $550 | $815 | $1,090 | $694 |
| 659E31000 LIME | 1.18 ACRE | $200 | $200 | $100 | $230 | $72.05 | $123 |
| 659E35000 WATER | 32 MGAL | $1.00 | $1.00 | $1.00 | $10.80 | $3.80 | $1.12 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT20 | 2 EACH | $1,975 | $1,600 | $1,700 | $1,200 | $1,335 | $2,234 |
| 625E14001 LIGHT POLE FOUNDATION, 24" X 6' DEEP, AS PER PLAN | 2 EACH | $2,750 | $1,500 | $1,700 | $1,400 | $1,215 | $1,520 |
| 625E25500 CONDUIT, 3", 725.04 | 332 FT | $19.20 | $24.50 | $19.00 | $32.04 | $17.10 | $26.30 |
| 625E29500 TRENCH IN PAVED AREA, TYPE A | 5 FT | $50.00 | $30.00 | $40.00 | $120 | $83.10 | $138 |
| 625E29600 TRENCH IN PAVED AREA, TYPE B | 60 FT | $80.00 | $50.00 | $44.00 | $40.00 | $64.35 | $127 |
| 625E30530 PULL BOX, 725.06, SIZE 18 | 4 EACH | $850 | $1,275 | $2,400 | $1,440 | $1,720 | $849 |
| 625E31600 PULL BOX, MISC.: PULL BOX, 725.06, SIZE 1.5 | 3 EACH | $450 | $1,710 | $950 | $1,090 | $695 | $569 |
| 625E36000 PLASTIC CAUTION TAPE | 6,510 FT | $0.05 | $0.50 | $0.60 | $0.40 | $0.05 | $0.44 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 14 FT | $12.00 | $15.00 | $12.00 | $17.45 | $14.35 | $22.40 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 120 EACH | $110 | $125 | $110 | $785 | $130 | $207 |
| 630E79605 SIGN SUPPORT ASSEMBLY, BRIDGE MOUNTED, TYPE 2, AS | 2 EACH | $995 | $1,000 | $995 | $1,800 | $3,925 | $2,710 |
| 630E79611 SIGN SUPPORT ASSEMBLY, BARRIER MOUNTED, AS PER PLA | 4 EACH | $1,475 | $1,500 | $1,475 | $1,100 | $4,100 | $2,162 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 35 EACH | $15.00 | $20.00 | $15.00 | $88.00 | $23.65 | $11.20 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $75.00 | $100 | $75.00 | $295 | $166 | $61.60 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 32 EACH | $20.00 | $30.00 | $20.00 | $72.00 | $25.90 | $16.80 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 1 EACH | $200 | $250 | $200 | $385 | $1,325 | $330 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 6 EACH | $20.00 | $30.00 | $20.00 | $95.00 | $83.00 | $39.20 |
| 630E97700 SIGNING, MISC.: SERVICE TO PIER MOUNTED SIGN | 1 EACH | $5,000 | $4,700 | $5,100 | $6,200 | $8,385 | $22,660 |
| 630E97700 SIGNING, MISC.: SIGN SUPPORT ASSEMBLY, WALL MOUNTE | 1 EACH | $1,500 | $2,000 | $1,500 | $1,200 | $3,385 | $2,083 |
| 632E29900 MESSENGER WIRE, 7 STRAND, 1/4" DIAMETER WITH ACCES | 47 FT | $9.90 | $8.50 | $20.00 | $22.00 | $18.45 | $17.04 |
| 632E64021 PEDESTAL FOUNDATION, AS PER PLAN | 3 EACH | $950 | $1,900 | $1,300 | $1,440 | $1,065 | $1,660 |
| 632E66000 POWER CABLE, 3 CONDUCTOR, NO. 14 AWG | 8,122 FT | $1.65 | $1.60 | $2.00 | $3.10 | $1.75 | $2.28 |
| 632E67300 POWER CABLE, 3 CONDUCTOR, NO. 8 AWG | 4,883 FT | $2.50 | $3.50 | $4.00 | $5.60 | $4.87 | $3.38 |
| 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG | 149 FT | $3.20 | $3.00 | $3.50 | $5.60 | $3.10 | $3.65 |
| 632E69500 SERVICE CABLE, 2 CONDUCTOR, NO. 6 AWG | 399 FT | $2.50 | $3.00 | $3.50 | $5.60 | $3.50 | $3.65 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 10 EACH | $515 | $320 | $500 | $1,000 | $510 | $800 |
| 632E89300 WOOD POLE, 30' | 8 EACH | $950 | $900 | $1,650 | $1,200 | $1,375 | $1,134 |
| 632E90010 PEDESTAL, MISC.: PEDESTAL, 13' | 1 EACH | $600 | $650 | $1,500 | $815 | $970 | $1,196 |
| 644E00404 CHANNELIZING LINE, 12" | 665 FT | $5.00 | $5.00 | $5.00 | $5.30 | $5.00 | $5.60 |
| 644E00500 STOP LINE | 68 FT | $8.10 | $8.50 | $8.10 | $21.30 | $8.10 | $9.07 |
| 644E00720 CHEVRON MARKING | 31 FT | $8.25 | $8.50 | $8.25 | $27.00 | $8.25 | $9.24 |
| 644E01300 LANE ARROW | 3 EACH | $200 | $200 | $200 | $270 | $200 | $224 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,950 | $7,675 | $10,626 | $6,800 | $23,800 | $24,640 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,500 | $6,930 | $8,500 | $26,000 | $700 | $27,900 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 630E97700 SIGNING, MISC.: WRONG WAY DETECTION SYSTEM | 17 EACH | $26,650 | $453k | 36% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 2" | 3,950 FT | $31.5 | $124k | 10% |
| 625E25400 CONDUIT, 2", 725.04 | 6,548 FT | $10.7 | $70k | 6% |
| 625E29001 TRENCH, AS PER PLAN | 6,458 FT | $9.65 | $62k | 5% |
| 632E26500 DETECTOR LOOP | 64 EACH | $875 | $56k | 4% |
| 632E64020 PEDESTAL FOUNDATION | 54 EACH | $950 | $51k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 632E90010 PEDESTAL, MISC.: PEDESTAL, 15', TRANSFORMER BASE | 56 EACH | $625 | $35k | 3% |
| 621E00100 RPM | 593 EACH | $50.25 | $30k | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 500 HOUR | $50 | $25k | 2% |