TUS-SR 39-13.04
TUS County · est $0.2M
Bid dateThursday, November 8—
TUS County · est $0.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 51 more items below.
| Item | Quantity | R1Perram Electric INC | R2Cornerstone Electric INC | R3Miller Cable Company | R4Complete General Construction Company | R5Asplundh Construction LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 816E30000 VIDEO DETECTION SYSTEM | 1 EACH | $26,060 | $27,500 | $23,000 | $28,000 | $28,600 | 17% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 4 EACH | $4,145 | $4,000 | $4,800 | $3,000 | $4,200 | 11% |
| 633E01581 CONTROLLER UNIT, TYPE TS2/A2, WITH CABINET, TYPE T | 1 EACH | $13,965 | $13,500 | $13,500 | $15,000 | $15,500 | 9% |
| Item | Quantity | R1Perram Electric INC | R2Cornerstone Electric INC | R3Miller Cable Company | R4Complete General Construction Company | R5Asplundh Construction LLC |
|---|---|---|---|---|---|---|
| 202E32000 CURB REMOVED | 109 FT | $10.00 | $15.00 | $25.00 | $20.00 | $20.00 |
| 203E10000 EXCAVATION | 16 CY | $82.00 | $28.00 | $110 | $130 | $52.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E00400 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 234 FT |
| $48.15 |
| $35.00 |
| $44.00 |
| $40.00 |
| $65.00 |
| 7% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $1,000 | $10,000 | $10,000 | $10,000 | 7% |
| 632E80303 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 3, AS PER PL | 2 EACH | $4,845 | $4,400 | $4,300 | $5,000 | $5,380 | 6% |
| 632E80203 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 2, AS PER PL | 2 EACH | $4,225 | $3,950 | $3,627 | $5,000 | $4,940 | 6% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $60.00 | $65.00 | $60.00 | $70.00 | $72.00 | 4% |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 5 EACH | $1,155 | $1,200 | $1,450 | $1,150 | $1,450 | 4% |
| 608E10000 4" CONCRETE WALK | 328 SF | $17.50 | $11.00 | $11.00 | $18.00 | $21.60 | 4% |
| 644E00300 CENTER LINE | 0.9 MILE | $5,800 | $7,650 | $5,300 | $5,290 | $6,200 | 3% |
| 642E30030 REMOVAL OF PAVEMENT MARKING | 0.88 MILE | $5,300 | $8,535 | $3,230 | $3,955 | $3,800 | 3% |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $4,500 | $5,000 | $3,600 | $4,300 | $4,545 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,150 | $5,000 | $5,650 | $5,000 | $13,200 | 3% |
| 608E52000 CURB RAMP | 188 SF | $21.00 | $55.00 | $18.00 | $23.00 | $70.00 | 3% |
| 633E67351 PREEMPTION PHASE SELECTOR, AS PER PLAN | 1 EACH | $3,640 | $3,750 | $3,550 | $4,000 | $3,980 | 2% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 80 FT | $42.00 | $50.00 | $75.00 | $56.50 | $42.00 | 2% |
| 633E67311 PREEMPTION RECEIVING UNIT, AS PER PLAN | 4 EACH | $750 | $1,000 | $600 | $960 | $900 | 2% |
| 625E30700 PULL BOX, 725.08, 18" | 3 EACH | $990 | $850 | $800 | $950 | $840 | 2% |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 185 FT | $16.05 | $10.00 | $6.50 | $12.00 | $7.50 | 2% |
| 40 FT |
| $9.05 |
| $3.00 |
| $2.00 |
| $11.00 |
| $12.00 |
| 625E25400 CONDUIT, 2", 725.04 | 79 FT | $17.70 | $10.00 | $17.00 | $17.00 | $37.20 |
| 625E25600 CONDUIT, 4", 725.04 | 18 FT | $49.10 | $25.00 | $50.00 | $39.00 | $40.00 |
| 625E29000 TRENCH | 97 FT | $11.60 | $10.00 | $15.00 | $8.50 | $14.30 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $1,155 | $950 | $950 | $1,100 | $990 |
| 625E31510 PULL BOX REMOVED | 5 EACH | $160 | $100 | $200 | $200 | $340 |
| 625E32000 GROUND ROD | 5 EACH | $260 | $200 | $265 | $260 | $260 |
| 625E32001 GROUND ROD, AS PER PLAN | 1 EACH | $260 | $250 | $265 | $260 | $260 |
| 625E36000 PLASTIC CAUTION TAPE | 97 FT | $0.10 | $0.25 | $0.20 | $1.00 | $0.40 |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 8 EACH | $245 | $150 | $425 | $395 | $480 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 3 EACH | $125 | $100 | $65.00 | $170 | $72.00 |
| 630E80100 SIGN, FLAT SHEET | 106.8 SF | $21.00 | $20.00 | $17.00 | $20.00 | $22.00 |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 2 EACH | $15.00 | $25.00 | $36.00 | $12.00 | $42.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $50.00 | $25.00 | $75.00 | $15.00 | $85.00 |
| 630E87100 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION | 6 EACH | $160 | $100 | $225 | $195 | $245 |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 100 FT | $5.00 | $7.80 | $1.50 | $6.25 | $1.60 |
| 642E30020 REMOVAL OF PAVEMENT MARKING | 1 EACH | $200 | $550 | $290 | $295 | $340 |
| 644E00204 LANE LINE, 6" | 0.57 MILE | $1,900 | $3,550 | $2,400 | $2,192 | $2,800 |
| 644E00404 CHANNELIZING LINE, 12" | 532 FT | $2.50 | $2.10 | $3.50 | $1.95 | $4.00 |
| 644E00500 STOP LINE | 149 FT | $6.00 | $6.00 | $6.00 | $5.95 | $7.00 |
| 644E00600 CROSSWALK LINE | 206 FT | $3.00 | $4.00 | $6.50 | $4.80 | $8.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 187 FT | $8.00 | $5.00 | $5.50 | $6.00 | $6.00 |
| 644E01000 RAILROAD SYMBOL MARKING | 1 EACH | $600 | $560 | $650 | $625 | $750 |
| 644E01300 LANE ARROW | 20 EACH | $125 | $100 | $110 | $99.00 | $120 |
| 644E01510 DOTTED LINE, 6" | 319 FT | $3.00 | $1.60 | $1.40 | $2.00 | $1.64 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 4 EACH | $675 | $850 | $1,000 | $725 | $990 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 4 EACH | $390 | $650 | $555 | $540 | $380 |
| 632E25001 COVERING OF VEHICULAR SIGNAL HEAD, AS PER PLAN | 9 EACH | $10.00 | $25.00 | $60.00 | $40.00 | $70.00 |
| 632E26001 PEDESTRIAN PUSHBUTTON, AS PER PLAN | 4 EACH | $285 | $250 | $300 | $300 | $190 |
| 632E40300 SIGNAL CABLE, 3 CONDUCTOR, NO. 14 AWG | 710 FT | $1.65 | $2.25 | $2.00 | $2.00 | $2.40 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 804 FT | $1.85 | $2.50 | $2.10 | $2.25 | $2.60 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 713 FT | $1.95 | $2.75 | $2.30 | $2.50 | $2.80 |
| 632E64020 PEDESTAL FOUNDATION | 1 EACH | $745 | $750 | $950 | $1,000 | $900 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 510 FT | $1.50 | $2.50 | $1.20 | $1.70 | $1.80 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 74 FT | $3.70 | $3.00 | $5.00 | $4.75 | $4.00 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $1,245 | $2,000 | $2,250 | $1,800 | $2,300 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 1 EACH | $635 | $250 | $500 | $540 | $965 |
| 632E89900 PEDESTAL, 8', TRANSFORMER BASE | 1 EACH | $820 | $650 | $900 | $1,000 | $760 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 1 EACH | $1,000 | $2,000 | $2,200 | $3,000 | $6,200 |
| 632E90400 SIGNALIZATION, MISC.:CAMERA MOUNTING BRACKET ASSEM | 6 EACH | $140 | $250 | $250 | $275 | $180 |
| 633E67100 CABINET FOUNDATION | 1 EACH | $1,810 | $1,500 | $2,800 | $2,000 | $2,200 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $375 | $350 | $500 | $900 | $1,100 |
| 633E67301 PREEMPTION, AS PER PLAN | 1 EACH | $1,000 | $1,500 | $1,000 | $1,200 | $1,100 |
| 633E67321 PREEMPTION DETECTOR CABLE, AS PER PLAN | 710 FT | $1.60 | $1.50 | $1.90 | $1.75 | $1.70 |
| 633E67401 PREEMPTION CONFIRMATION LIGHT, AS PER PLAN | 4 EACH | $290 | $425 | $175 | $550 | $260 |
| 815E30001 SPREAD SPECTRUM RADIO, AS PER PLAN | 1 EACH | $2,135 | $2,000 | $2,000 | $3,000 | $2,200 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,408 | $2,300 | $1,521 | $2,000 | $1,400 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $100 | $1,000 | $1,500 | $1,200 | $2,800 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 816E30000 VIDEO DETECTION SYSTEM | 1 EACH | $26,060 | $26k | 13% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 4 EACH | $4,145 | $17k | 8% |
| 633E01581 CONTROLLER UNIT, TYPE TS2/A2, WITH CABINET, TYPE T | 1 EACH | $13,965 | $14k | 7% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04 3" | 234 FT | $48.15 | $11k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 5% |
| 632E80303 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 3, AS PER PL | 2 EACH | $4,845 | $10k | 5% |
| 632E80203 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 2, AS PER PL | 2 EACH | $4,225 | $8k | 4% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $60 | $6k | 3% |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 5 EACH | $1,155 | $6k | 3% |
| 608E10000 4" CONCRETE WALK | 328 SF | $17.5 | $6k | 3% |