POR-Streetsboro Signals
POR County · est $4.0M
Bid dateThursday, December 13—
POR County · est $4.0M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 178 more items below.
| Item | Quantity | R1Perram Electric INC | R2Miller Cable Company | R3Cornerstone Electric INC | R4S E T INC | % of bid |
|---|---|---|---|---|---|---|
| 632E64010 SIGNAL SUPPORT FOUNDATION | 54 EACH | $4,735 | $6,650 | $4,000 | $5,800 | 13% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 4,248 FT | $48.45 | $55.00 | $50.00 | $60.00 | 10% |
| AA1 816E30001 VIDEO DETECTION SYSTEM, AS PER PLAN (ALTERNATE 1) | 15 EACH | $12,510 | $15,350 | $16,000 | $18,225 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $169,425 | $88,325 | $100,000 | $165,000 | 8% |
| Item | Quantity | R1Perram Electric INC | R2Miller Cable Company | R3Cornerstone Electric INC | R4S E T INC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $5,500 | $10,000 | $35,000 |
| 202E23000 PAVEMENT REMOVED | 475 SY | $13.75 | $17.00 | $13.75 | $28.00 |
| 202E30000 WALK REMOVED | 13,287 SF | $3.35 | $3.75 | $3.35 | $4.00 |
| 202E32000 CURB REMOVED | 234 FT | $10.00 | $11.00 | $10.00 | $7.00 |
| 202E32500 CURB AND GUTTER REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| AA1 633E01551 CONTROLLER UNIT, TYPE TS2/A2, WITH CABINET, TYPE T | 15 EACH | $9,385 | $12,000 | $13,200 | $11,000 | 7% |
| 632E81091 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN | 9 EACH | $11,370 | $11,000 | $12,000 | $15,900 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $100,000 | $140,000 | 5% |
| 608E52000 CURB RAMP | 5,988 SF | $16.00 | $13.00 | $16.00 | $21.00 | 5% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 2,503 FT | $35.95 | $45.00 | $40.00 | $58.50 | 4% |
| 809E64500 HIGH-SPEED ETHERNET RADIO | 46 EACH | $1,835 | $2,800 | $2,500 | $2,650 | 4% |
| AA1 633E67301 PREEMPTION, AS PER PLAN (ALTERNATE 1) | 16 EACH | $4,775 | $4,850 | $16,000 | $6,500 | 4% |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 15 EACH | $4,740 | $4,600 | $5,600 | $5,950 | 3% |
| AA1 632E90400 SIGNALIZATION, MISC.: CENTRAL SIGNAL SYSTEM CONTRO | 1 EACH | $69,000 | $96,500 | $160,000 | $125,000 | 3% |
| 632E81071 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN | 8 EACH | $8,430 | $8,400 | $8,500 | $11,500 | 3% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 93 EACH | $672 | $800 | $850 | $1,050 | 3% |
| 809E69000 ADVANCE RADAR DETECTION | 8 EACH | $7,380 | $7,100 | $17,500 | $9,500 | 3% |
| 632E81001 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN | 8 EACH | $6,925 | $8,100 | $7,000 | $9,500 | 3% |
| 632E81095 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN | 4 EACH | $13,005 | $12,750 | $13,500 | $17,900 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $50,547 | $39,966 | $34,000 | $65,000 | 2% |
| AA1 633E67350 PREEMPTION PHASE SELECTOR (ALTERNATE 1) | 16 EACH | $3,000 | $3,300 | $5,500 | $4,000 | 2% |
| 1,930 FT |
| $5.50 |
| $6.00 |
| $5.50 |
| $9.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 85 FT | $10.00 | $10.00 | $10.00 | $22.00 |
| 202E38000 GUARDRAIL REMOVED | 25 FT | $12.00 | $15.00 | $12.00 | $6.00 |
| 202E58100 CATCH BASIN REMOVED | 7 EACH | $200 | $250 | $200 | $350 |
| 202E98100 REMOVAL MISC.:CURB STOP | 1 EACH | $400 | $450 | $400 | $220 |
| 202E98100 REMOVAL MISC.:IRRIGATION | 1 EACH | $500 | $550 | $500 | $1,500 |
| 202E98100 REMOVAL MISC.:LANDSCAPE WALL | 1 EACH | $2,500 | $2,700 | $2,500 | $1,500 |
| 202E98100 REMOVAL MISC.:LIGHT POLE | 1 EACH | $615 | $550 | $500 | $1,100 |
| 202E98100 REMOVAL MISC.:TRENCH DRAIN | 1 EACH | $750 | $850 | $750 | $850 |
| 203E10000 EXCAVATION | 762 CY | $25.00 | $30.00 | $25.00 | $40.00 |
| 203E20000 EMBANKMENT | 153 CY | $25.00 | $30.00 | $25.00 | $18.00 |
| 203E98500 ROADWAY, MISC.:PRECONSTRUCTION VIDEO | 1 LS | $1,500 | $5,800 | $5,000 | $4,500 |
| 204E10000 SUBGRADE COMPACTION | 837 SY | $2.00 | $2.50 | $2.00 | $3.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 155 CY | $20.00 | $30.00 | $20.00 | $13.00 |
| 204E30011 GRANULAR MATERIAL, TYPE B, AS PER PLAN | 155 CY | $55.00 | $60.00 | $55.00 | $52.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $75.00 | $125 | $74.00 | $300 |
| 204E50000 GEOTEXTILE FABRIC | 426 SY | $2.50 | $3.00 | $2.50 | $1.50 |
| 606E15250 GUARDRAIL, TYPE MGS QUARTER POST SPACING | 25 FT | $50.00 | $35.00 | $100 | $25.00 |
| 608E10000 4" CONCRETE WALK | 6,213 SF | $5.75 | $8.00 | $5.75 | $8.00 |
| 608E15000 8" CONCRETE WALK | 75 SF | $7.50 | $10.00 | $7.50 | $9.00 |
| 608E53020 DETECTABLE WARNING | 488 SF | $25.00 | $27.00 | $25.00 | $30.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $35.00 | $35.00 | $35.00 | $150 |
| 659E00300 TOPSOIL | 64 CY | $50.00 | $50.00 | $50.00 | $75.00 |
| 659E10000 SEEDING AND MULCHING | 575 SY | $3.00 | $3.00 | $3.00 | $2.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 29 SY | $0.25 | $0.25 | $0.25 | $1.00 |
| 659E15000 INTER-SEEDING | 29 SY | $0.25 | $0.25 | $0.25 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $600 | $600 | $600 | $850 |
| 659E31000 LIME | 0.1 ACRE | $600 | $600 | $600 | $650 |
| 659E35000 WATER | 3.2 MGAL | $0.95 | $1.00 | $1.00 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $7,500 | $16,000 | $15,000 | $18,500 |
| 832E30000 EROSION CONTROL | 2,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 2 SY | $200 | $200 | $200 | $120 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 20 FT | $15.00 | $20.00 | $15.00 | $14.00 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 703 FT | $10.00 | $15.00 | $10.00 | $15.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 30 FT | $25.00 | $25.00 | $25.00 | $21.50 |
| 611E01500 6" CONDUIT, TYPE F | 20 FT | $13.00 | $25.00 | $13.00 | $13.00 |
| 611E01800 8" CONDUIT, TYPE B | 10 FT | $15.00 | $60.00 | $15.00 | $100 |
| 611E04400 12" CONDUIT, TYPE B | 92 FT | $120 | $120 | $120 | $185 |
| 611E07400 18" CONDUIT, TYPE B | 5 FT | $135 | $150 | $135 | $250 |
| 611E98150 CATCH BASIN, NO. 3 | 3 EACH | $1,500 | $2,500 | $1,500 | $3,100 |
| 611E98180 CATCH BASIN, NO. 3A | 4 EACH | $1,800 | $2,100 | $1,800 | $2,400 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 1 EACH | $1,000 | $500 | $1,000 | $950 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $1,800 | $2,750 | $1,800 | $2,100 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 2 EACH | $950 | $2,000 | $950 | $1,600 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $275 | $275 | $275 | $200 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 1,000 LB | $1.50 | $3.00 | $1.50 | $1.20 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE PAVEMENT | 972 SY | $15.00 | $15.00 | $15.00 | $15.00 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 118 CY | $177 | $190 | $177 | $220 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 347 CY | $60.00 | $60.00 | $60.00 | $80.00 |
| 305E14010 10" CONCRETE BASE, CLASS QC1 | 98 SY | $70.00 | $70.00 | $70.00 | $80.50 |
| 407E10000 TACK COAT | 225 GAL | $2.00 | $4.00 | $2.00 | $4.60 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 50 CY | $287 | $450 | $287 | $355 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (71 CY | $212 | $245 | $212 | $280 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $461 | $550 | $461 | $600 |
| 441E50600 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (21 CY | $336 | $410 | $336 | $450 |
| 452E14010 10" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 471 SY | $90.00 | $90.00 | $90.00 | $104 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 1,379 FT | $25.00 | $25.00 | $25.00 | $30.00 |
| 609E14000 CURB, TYPE 2-A | 124 FT | $20.00 | $20.00 | $20.00 | $26.00 |
| 609E26000 CURB, TYPE 6 | 281 FT | $25.00 | $25.00 | $25.00 | $33.00 |
| 609E28001 CURB, TYPE 7, AS PER PLAN | 20 FT | $50.00 | $50.00 | $50.00 | $60.00 |
| 609E54000 6" CONCRETE TRAFFIC ISLAND | 7 SY | $250 | $250 | $250 | $300 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 2 EACH | $900 | $900 | $900 | $1,600 |
| 625E00450 CONNECTION, FUSED PULL APART | 38 EACH | $83.00 | $95.00 | $100 | $125 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 38 EACH | $83.00 | $95.00 | $100 | $145 |
| 625E10500 LIGHT POLE, MISC.: EXISTING LIGHT POLE AND LUMINAI | 1 EACH | $716 | $2,100 | $2,000 | $2,300 |
| 625E14001 LIGHT POLE FOUNDATION, 24" X 6' DEEP, AS PER PLAN | 1 EACH | $1,275 | $1,350 | $1,500 | $3,950 |
| 625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE | 14,892 FT | $1.50 | $2.30 | $2.00 | $2.50 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 4,680 FT | $0.65 | $1.25 | $1.50 | $2.25 |
| 625E25408 CONDUIT, 2", 725.051 | 1,090 FT | $3.90 | $7.50 | $3.00 | $4.25 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 38 EACH | $475 | $575 | $600 | $800 |
| 625E29000 TRENCH | 1,046 FT | $3.85 | $11.00 | $10.00 | $15.00 |
| 625E29500 TRENCH IN PAVED AREA, TYPE A | 44 FT | $12.75 | $30.00 | $45.00 | $95.00 |
| 625E30700 PULL BOX, 725.08, 18" | 45 EACH | $865 | $850 | $850 | $950 |
| 625E32000 GROUND ROD | 1 EACH | $255 | $265 | $250 | $260 |
| 625E36000 PLASTIC CAUTION TAPE | 1,090 FT | $0.05 | $0.30 | $0.25 | $0.50 |
| 625E32000 GROUND ROD | 1 EACH | $255 | $265 | $250 | $260 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 364.1 FT | $15.25 | $10.00 | $8.00 | $9.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 39.5 FT | $14.70 | $11.00 | $11.00 | $10.00 |
| 630E08600 SIGN POST REFLECTOR | 1 EACH | $167 | $75.00 | $50.00 | $70.00 |
| 630E11212 OVERHEAD SIGN SUPPORT, TYPE TC-16.21, DESIGN 14, A | 1 EACH | $12,305 | $15,000 | $13,500 | $16,600 |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 1 EACH | $250 | $315 | $375 | $350 |
| 630E79101 SIGN HANGER ASSEMBLY, MAST ARM, AS PER PLAN | 117 EACH | $248 | $415 | $475 | $450 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 9 EACH | $106 | $115 | $60.00 | $55.00 |
| 630E80100 SIGN, FLAT SHEET | 1,854 SF | $19.30 | $22.00 | $14.00 | $21.00 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 1 EACH | $4,870 | $8,100 | $4,500 | $5,900 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 33 EACH | $14.00 | $30.00 | $30.00 | $23.00 |
| 630E85101 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, AS | 4 EACH | $82.00 | $100 | $100 | $90.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 29 EACH | $37.00 | $35.00 | $40.00 | $50.00 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 59 EACH | $15.65 | $55.00 | $150 | $65.00 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 87 EACH | $15.95 | $25.00 | $30.00 | $25.00 |
| 644E00100 EDGE LINE, 4" | 0.01 MILE | $9,500 | $13,000 | $12,000 | $12,000 |
| 644E00200 LANE LINE, 4" | 0.14 MILE | $5,500 | $8,500 | $8,000 | $7,000 |
| 644E00300 CENTER LINE | 0.03 MILE | $15,000 | $10,000 | $9,500 | $18,000 |
| 644E00400 CHANNELIZING LINE, 8" | 532 FT | $1.25 | $2.00 | $1.55 | $2.00 |
| 644E00500 STOP LINE | 1,578 FT | $6.50 | $8.05 | $7.70 | $8.00 |
| 644E00600 CROSSWALK LINE | 3,009 FT | $3.00 | $3.00 | $2.55 | $3.50 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 27 FT | $6.00 | $7.25 | $6.75 | $7.00 |
| 644E00900 ISLAND MARKING | 62 SF | $3.00 | $3.50 | $3.25 | $4.00 |
| 644E01300 LANE ARROW | 11 EACH | $125 | $100 | $85.00 | $150 |
| 644E01500 DOTTED LINE, 4" | 385 FT | $3.00 | $2.50 | $2.10 | $4.00 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 6,297 FT | $3.00 | $3.50 | $10.15 | $4.00 |
| 644E30020 REMOVAL OF PAVEMENT MARKING | 18 EACH | $100 | $125 | $500 | $145 |
| 644E30030 REMOVAL OF PAVEMENT MARKING | 0.15 MILE | $18,000 | $19,500 | $26,335 | $21,000 |
| 646E10100 LANE LINE, 4" | 0.05 MILE | $7,500 | $8,000 | $76,000 | $9,000 |
| 646E10300 CHANNELIZING LINE, 8" | 715 FT | $2.20 | $2.50 | $8.70 | $3.00 |
| 646E10400 STOP LINE | 303 FT | $12.00 | $13.00 | $18.20 | $14.00 |
| 646E10500 CROSSWALK LINE | 1,673 FT | $5.00 | $5.50 | $12.65 | $6.00 |
| 646E20300 LANE ARROW | 7 EACH | $155 | $175 | $500 | $200 |
| 646E20410 WORD ON PAVEMENT, 96" | 5 EACH | $185 | $200 | $750 | $225 |
| 646E20502 DOTTED LINE, 4" | 511 FT | $5.00 | $5.50 | $8.65 | $6.00 |
| 646E50000 REMOVAL OF PAVEMENT MARKING | 8 EACH | $100 | $115 | $500 | $125 |
| 646E50100 REMOVAL OF PAVEMENT MARKING | 3,277 FT | $3.00 | $3.50 | $5.50 | $4.00 |
| 646E50300 REMOVAL OF PAVEMENT MARKING | 0.05 MILE | $18,000 | $19,500 | $32,000 | $21,000 |
| 625E17961 BRACKET ARM, 8', AS PER PLAN | 5 EACH | $465 | $450 | $550 | $800 |
| 625E18101 BRACKET ARM, 12', AS PER PLAN | 25 EACH | $605 | $650 | $650 | $990 |
| 625E18301 BRACKET ARM, 18', AS PER PLAN | 13 EACH | $865 | $1,000 | $900 | $1,500 |
| 625E25400 CONDUIT, 2", 725.04 | 2,034 FT | $14.90 | $11.00 | $12.00 | $15.00 |
| 625E25500 CONDUIT, 3", 725.04 | 832 FT | $27.65 | $25.00 | $18.00 | $23.00 |
| 625E25600 CONDUIT, 4", 725.04 | 464 FT | $37.95 | $28.00 | $25.00 | $45.00 |
| 625E29000 TRENCH | 2,702 FT | $10.50 | $11.00 | $10.00 | $14.00 |
| 625E29500 TRENCH IN PAVED AREA, TYPE A | 234 FT | $19.00 | $30.00 | $40.00 | $75.00 |
| 625E30700 PULL BOX, 725.08, 18" | 27 EACH | $866 | $850 | $900 | $950 |
| 625E30706 PULL BOX, 725.08, 24" | 34 EACH | $966 | $1,050 | $1,000 | $1,250 |
| 625E32000 GROUND ROD | 109 EACH | $254 | $265 | $250 | $250 |
| 625E36000 PLASTIC CAUTION TAPE | 2,936 FT | $0.05 | $0.30 | $0.25 | $0.50 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 39 EACH | $1,090 | $1,100 | $1,200 | $1,450 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 68 EACH | $380 | $525 | $650 | $550 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 132 EACH | $10.00 | $35.00 | $20.00 | $60.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 68 EACH | $5.00 | $25.00 | $20.00 | $40.00 |
| 632E26001 PEDESTRIAN PUSHBUTTON, AS PER PLAN | 68 EACH | $245 | $150 | $250 | $210 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 11,368 FT | $1.70 | $2.50 | $2.75 | $2.50 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 15,950 FT | $1.85 | $2.70 | $3.00 | $2.60 |
| 632E62820 INTERCONNECT, MISC.: HIGH-SPEED ETHERNET RADIO REP | 2 EACH | $4,585 | $5,700 | $5,000 | $4,950 |
| 632E62820 INTERCONNECT, MISC.: LAYER 2 ETHERNET SWITCH | 18 EACH | $1,500 | $1,200 | $2,000 | $1,350 |
| 632E64020 PEDESTAL FOUNDATION | 40 EACH | $915 | $800 | $750 | $995 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 11,104 FT | $1.55 | $1.25 | $2.50 | $2.00 |
| 632E69300 POWER CABLE, 3 CONDUCTOR, NO. 4 AWG | 2,473 FT | $5.30 | $2.00 | $5.00 | $5.00 |
| 632E70001 POWER SERVICE, AS PER PLAN | 17 EACH | $1,885 | $2,200 | $3,000 | $3,800 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 1 EACH | $460 | $750 | $500 | $1,100 |
| 632E77073 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21 DESIGN 1 | 1 EACH | $9,940 | $11,000 | $9,800 | $13,800 |
| 632E77093 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21 DESIGN 1 | 1 EACH | $11,195 | $12,500 | $11,000 | $15,500 |
| 632E77133 COMBINATION SIGNAL SUPPORT, TYPE TC-12.30 DESIGN 5 | 1 EACH | $12,990 | $13,250 | $13,500 | $17,800 |
| 632E77231 SIGNAL SUPPORT, MECHANICAL DAMPER FOR TC-81.21 MAS | 8 EACH | $705 | $1,000 | $800 | $950 |
| 632E80103 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 1, AS PER PL | 1 EACH | $4,865 | $4,500 | $5,000 | $6,000 |
| 632E80403 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 4, AS PER PL | 1 EACH | $6,495 | $7,550 | $6,500 | $8,000 |
| 632E80503 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 11, AS PER P | 4 EACH | $7,890 | $8,000 | $7,800 | $10,000 |
| 632E80603 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 12, AS PER P | 1 EACH | $8,945 | $8,900 | $9,000 | $11,000 |
| 632E80621 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 13, AS PER P | 2 EACH | $10,735 | $10,300 | $11,000 | $14,000 |
| 632E80971 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN | 2 EACH | $5,160 | $4,600 | $5,500 | $7,000 |
| 632E80981 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN | 8 EACH | $5,945 | $5,600 | $6,000 | $8,000 |
| 632E81081 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN | 3 EACH | $9,480 | $9,500 | $9,500 | $12,900 |
| 632E89300 WOOD POLE | 3 EACH | $862 | $1,300 | $2,000 | $1,900 |
| 632E89901 PEDESTAL, 8', TRANSFORMER BASE, AS PER PLAN | 40 EACH | $770 | $550 | $650 | $800 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 16 EACH | $1,570 | $1,400 | $2,000 | $6,200 |
| 632E90400 SIGNALIZATION, MISC.: EMERGENCY VEHICLE PREEMPTION | 1 EACH | $27,340 | $50,500 | $55,000 | $42,500 |
| 632E90400 SIGNALIZATION, MISC.: TEST HOLE PERFORMED | 15 EACH | $310 | $150 | $500 | $820 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 15 EACH | $2,740 | $2,800 | $2,500 | $2,800 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 5 EACH | $360 | $500 | $350 | $500 |
| 633E67320 PREEMPTION DETECTOR CABLE | 1,159 FT | $1.85 | $4.00 | $2.00 | $2.50 |
| 633E67401 PREEMPTION CONFIRMATION LIGHT, AS PER PLAN | 57 EACH | $610 | $450 | $350 | $400 |
| 809E60000 CCTV IP-CAMERA SYSTEM, DOME-TYPE | 6 EACH | $6,210 | $6,500 | $5,000 | $8,850 |
| AA1 633E01541 CONTROLLER UNIT, TYPE TS2/A2, AS PER PLAN (ALTERNA | 1 EACH | $2,310 | $3,600 | $4,300 | $4,200 |
| AA1 633E67310 PREEMPTION RECEIVING UNIT (ALTERNATE 1) | 16 EACH | $745 | $500 | $350 | $575 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 20 CY | $65.00 | $65.00 | $65.00 | $120 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 400 HOUR | $55.00 | $55.00 | $70.00 | $62.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 1 SNMT | $1,205 | $1,500 | $1,000 | $2,300 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.09 MILE | $15,000 | $15,000 | $15,000 | $18,000 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.28 MILE | $9,500 | $9,500 | $6,500 | $11,000 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 367 FT | $3.00 | $3.00 | $2.50 | $4.00 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 300 FT | $4.00 | $4.00 | $0.35 | $5.00 |
| 616E10000 WATER | 80 MGAL | $2.00 | $1.00 | $50.00 | $2.00 |
| 690E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO | 10 TON | $225 | $425 | $500 | $125 |
| 619E16010 FIELD OFFICE, TYPE B | 8 MNTH | $1,500 | $1,350 | $2,500 | $1,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,500 | $53,000 | $35,000 | $55,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 632E64010 SIGNAL SUPPORT FOUNDATION | 54 EACH | $4,735 | $256k | 7% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 4,248 FT | $48.45 | $206k | 6% |
| AA1 816E30001 VIDEO DETECTION SYSTEM, AS PER PLAN (ALTERNATE 1) | 15 EACH | $12,510 | $188k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $169,425 | $169k | 5% |
| AA1 633E01551 CONTROLLER UNIT, TYPE TS2/A2, WITH CABINET, TYPE T | 15 EACH | $9,385 | $141k | 4% |
| 632E81091 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN | 9 EACH | $11,370 | $102k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |
| 608E52000 CURB RAMP | 5,988 SF | $16 | $96k | 3% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 2,503 FT | $35.95 | $90k | 2% |
| 809E64500 HIGH-SPEED ETHERNET RADIO | 46 EACH | $1,835 | $84k | 2% |