D03-LG FY2020
D03 County · est $1.5M
Bid dateThursday, June 4—
D03 County · est $1.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1Miller Cable Company | R2Perram Electric INC | R3Zenith Systems LLC | % of bid |
|---|---|---|---|---|---|
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 96 EACH | $1,600 | $1,500 | $1,388 | 14% |
| 625E24324 1-1/2" DUCT CABLE WITH THREE NO. 6 AWG 2400 VOLT C | 28,793 FT | $5.00 | $4.90 | $4.71 | 13% |
| 625E25900 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 2,940 FT | $42.00 | $36.60 | $35.35 | 11% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT18B40 | 47 EACH | $2,530 | $1,980 | $2,252 | 11% |
| 625E29002 TRENCH, 24" DEEP | 27,515 FT | $3.00 | $6.60 | $6.88 | 7% |
| Item | Quantity | R1Miller Cable Company | R2Perram Electric INC | R3Zenith Systems LLC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,100 | $200 | $15,400 |
| 204E20000 EMBANKMENT | 3 CY | $110 | $180 | $96.25 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 6 SY | $15.00 | $54.85 | $4.08 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 |
| 605E05100 4" SHALLOW PIPE UNDERDRAINS | 1,860 FT | $1.50 | $3.30 | $8.80 |
| 611E07600 18" CONDUIT, TYPE C |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 625E10490 LIGHT POLE, CONVENTIONAL, AT20B40 | 28 EACH | $2,550 | $2,007 | $2,281 | 6% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT15B40 | 19 EACH | $2,465 | $1,795 | $2,066 | 4% |
| 625E26252 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), IES-II | 105 EACH | $425 | $490 | $487 | 4% |
| 625E30700 PULL BOX, 725.08, 18" | 61 EACH | $700 | $907 | $638 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $46,467 | 4% |
| 625E34001 POWER SERVICE, AS PER PLAN | 4 EACH | $9,600 | $9,065 | $6,786 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $37,588 | $20,600 | $62,124 | 3% |
| 625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE | 15,801 FT | $2.20 | $1.47 | $1.61 | 3% |
| 625E30706 PULL BOX, 725.08, 24" | 32 EACH | $910 | $1,085 | $730 | 3% |
| 625E32000 GROUND ROD | 97 EACH | $265 | $254 | $153 | 2% |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 279 EACH | $85.00 | $91.80 | $58.98 | 2% |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 18,147 FT | $1.20 | $0.63 | $0.57 | 2% |
| 625E00450 CONNECTION, FUSED PULL APART | 210 EACH | $85.00 | $96.60 | $71.20 | 2% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 16 SNMT | $1,000 | $500 | $1,190 | 1% |
| 625E75551 DISTRIBUTION CABLE REMOVED, AS PER PLAN | 30,639 FT | $0.50 | $0.38 | $1.07 | 1% |
| 8 FT |
| $175 |
| $67.00 |
| $60.50 |
| 625E10490 LIGHT POLE, CONVENTIONAL, A12B40 | 1 EACH | $2,150 | $1,675 | $1,924 |
| 625E10490 LIGHT POLE, CONVENTIONAL, A15B40 | 3 EACH | $2,175 | $1,700 | $1,964 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT12B40 | 2 EACH | $2,400 | $1,830 | $2,086 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT15B30 | 1 EACH | $2,425 | $1,630 | $1,897 |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 1 EACH | $1,450 | $1,335 | $1,335 |
| 625E14600 LIGHT POLE FOUNDATION, MISC.: EXCAVATION AND RESTO | 10 EACH | $50.00 | $310 | $805 |
| 625E25500 CONDUIT, 3", 725.04 | 133 FT | $25.00 | $21.75 | $22.47 |
| 625E25910 CONDUIT CLEANED AND CABLES REMOVED | 1,286 FT | $2.25 | $0.35 | $1.93 |
| 625E31510 PULL BOX REMOVED | 72 EACH | $100 | $154 | $181 |
| 625E36000 PLASTIC CAUTION TAPE | 27,515 FT | $0.30 | $0.05 | $0.07 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $100 | $500 | $24,782 |
| 625E40010 SPECIAL - REPLACEMENT OF EXISTING LIGHTING UNIT | 4 EACH | $100 | $460 | $2,539 |
| 625E75400 LIGHT POLE REMOVED | 4 EACH | $100 | $310 | $260 |
| 625E75401 LIGHT POLE REMOVED, AS PER PLAN | 81 EACH | $100 | $308 | $260 |
| 625E75403 LIGHT POLE REMOVED FOR STORAGE, AS PER PLAN | 10 EACH | $100 | $308 | $260 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 91 EACH | $100 | $308 | $695 |
| 625E75506 LUMINAIRE REMOVED | 99 EACH | $40.00 | $38.90 | $120 |
| 625E75510 POWER SERVICE REMOVED | 4 EACH | $300 | $460 | $252 |
| 625E75550 DISTRIBUTION CABLE REMOVED | 3,838 FT | $1.00 | $0.40 | $1.93 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (CC-'A') | 1 EACH | $2,000 | $2,000 | $240 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (CC-'B') | 1 EACH | $2,000 | $2,000 | $240 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (CC-'D') | 1 EACH | $2,000 | $2,000 | $240 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (CC-'G') | 1 EACH | $2,000 | $2,000 | $240 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 160 HOUR | $70.00 | $40.00 | $77.05 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,673 | $15,332 | $12,113 |
| 619E16010 FIELD OFFICE, TYPE B | 8 MNTH | $1,000 | $600 | $2,863 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,500 | $4,930 | $3,399 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 96 EACH | $1,600 | $154k | 12% |
| 625E24324 1-1/2" DUCT CABLE WITH THREE NO. 6 AWG 2400 VOLT C | 28,793 FT | $5 | $144k | 12% |
| 625E25900 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 2,940 FT | $42 | $123k | 10% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT18B40 | 47 EACH | $2,530 | $119k | 10% |
| 625E29002 TRENCH, 24" DEEP | 27,515 FT | $3 | $83k | 7% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT20B40 | 28 EACH | $2,550 | $71k | 6% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT15B40 | 19 EACH | $2,465 | $47k | 4% |
| 625E26252 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), IES-II | 105 EACH | $425 | $45k | 4% |
| 625E30700 PULL BOX, 725.08, 18" | 61 EACH | $700 | $43k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |