GUE-IR 77/IR 70-09.67/03.48
GUE County · est $0.8M
Bid dateThursday, July 16—
GUE County · est $0.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 16 more items below.
| Item | Quantity | R1Cornerstone Electric INC | R2Complete General Construction Company | R3Perram Electric INC | R4Miller Cable Company | % of bid |
|---|---|---|---|---|---|---|
| 625E29002 TRENCH, 24" DEEP | 16,331 FT | $5.50 | $5.00 | $10.91 | $12.00 | 16% |
| 625E10490 LIGHT POLE, CONVENTIONAL (35' MOUNTING HEIGHT W/ | 46 EACH | $1,900 | $1,900 | $1,851 | $2,100 | 16% |
| 625E24324 1-1/2" DUCT CABLE WITH THREE NO. 6 AWG 2400 VOLT C | 16,921 FT | $4.25 | $6.00 | $4.83 | $6.00 | 13% |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 51 EACH | $1,200 | $850 | $1,663 |
| Item | Quantity | R1Cornerstone Electric INC | R2Complete General Construction Company | R3Perram Electric INC | R4Miller Cable Company |
|---|---|---|---|---|---|
| 304E20001 AGGREGATE BASE, AS PER PLAN | 5 CY | $200 | $120 | $545 | $600 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E00400 4" CONDUIT, TYPE E | 500 FT | $3.00 | $11.50 | $3.75 | $3.00 |
| 625E25500 CONDUIT, 3", 725.04 | 40 FT | $20.00 | $28.00 | $26.65 | $35.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1,355 |
| 11% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 1,240 FT | $45.00 | $27.00 | $49.95 | $60.00 | 10% |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 56 EACH | $375 | $425 | $460 | $300 | 4% |
| 625E30700 PULL BOX, 725.08, 18" | 25 EACH | $800 | $975 | $923 | $730 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | $20,000 | $20,000 | 4% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $18,000 | $3,000 | $5,580 | $17,000 | 3% |
| 625E75350 LIGHT TOWER REMOVED | 15 EACH | $1,000 | $1,000 | $1,625 | $880 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $14,000 | $8,000 | $23,650 | $27,500 | 3% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $1,600 | $800 | $875 | $900 | 2% |
| 625E10490 LIGHT POLE, CONVENTIONAL (35' MOUNTING HEIGHT W/ | 5 EACH | $2,500 | $2,400 | $2,365 | $2,700 | 2% |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 9,165 FT | $1.25 | $1.10 | $0.66 | $1.25 | 2% |
| 625E00450 CONNECTION, FUSED PULL APART | 102 EACH | $100 | $110 | $74.45 | $95.00 | 2% |
| 625E32000 GROUND ROD | 51 EACH | $200 | $260 | $267 | $265 | 2% |
| 625E34001 POWER SERVICE, AS PER PLAN | 2 EACH | $5,000 | $10,000 | $10,015 | $6,500 | 2% |
| 625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE | 4,308 FT | $1.50 | $2.50 | $1.57 | $2.30 | 1% |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 62 EACH | $100 | $110 | $111 | $95.00 | 1% |
| 625E75541 LIGHT TOWER FOUNDATION REMOVED, AS PER PLAN | 6 EACH | $1,000 | $1,500 | $4,500 | $1,600 | 1% |
| 625E30706 PULL BOX, 725.08, 24" | 4 EACH | $950 | $1,200 | $1,095 | $925 |
| 625E31510 PULL BOX REMOVED | 38 EACH | $100 | $225 | $81.25 | $50.00 |
| 625E36000 PLASTIC CAUTION TAPE | 16,291 FT | $0.10 | $0.50 | $0.05 | $0.20 |
| 625E75401 LIGHT POLE REMOVED, AS PER PLAN | 19 EACH | $150 | $250 | $325 | $100 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 19 EACH | $150 | $310 | $488 | $100 |
| 625E75510 POWER SERVICE REMOVED | 1 EACH | $500 | $675 | $488 | $350 |
| 625E75511 POWER SERVICE REMOVED, AS PER PLAN | 1 EACH | $1,000 | $900 | $650 | $100 |
| 625E75540 LIGHT TOWER FOUNDATION REMOVED | 9 EACH | $500 | $900 | $650 | $250 |
| 625E75551 DISTRIBUTION CABLE REMOVED, AS PER PLAN | 4,500 FT | $0.50 | $0.50 | $0.51 | $0.10 |
| 631E94470 REMOVAL OF SIGN SERVICE | 4 EACH | $750 | $125 | $325 | $55.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $50.00 | $82.00 | $75.00 | $80.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,250 | $6,000 | $10,543 | $5,959 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 625E29002 TRENCH, 24" DEEP | 16,331 FT | $5.5 | $90k | 15% |
| 625E10490 LIGHT POLE, CONVENTIONAL (35' MOUNTING HEIGHT W/ | 46 EACH | $1,900 | $87k | 14% |
| 625E24324 1-1/2" DUCT CABLE WITH THREE NO. 6 AWG 2400 VOLT C | 16,921 FT | $4.25 | $72k | 12% |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 51 EACH | $1,200 | $61k | 10% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 1,240 FT | $45 | $56k | 9% |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 56 EACH | $375 | $21k | 3% |
| 625E30700 PULL BOX, 725.08, 18" | 25 EACH | $800 | $20k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 3% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $18,000 | $18k | 3% |
| 625E75350 LIGHT TOWER REMOVED | 15 EACH | $1,000 | $15k | 2% |