BEL-SR 7-08.14 and Various
BEL County · est $1.0M
Bid dateThursday, November 5—
BEL County · est $1.0M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 37 more items below.
| Item | Quantity | R1Cornerstone Electric INC | R2Complete General Construction Company | R3Perram Electric INC | R4Miller Cable Company | R5Asplundh Construction LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 625E29000 TRENCH | 19,107 FT | $6.25 | $6.00 | $8.38 | $9.50 | $1.43 | 15% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 3,279 FT | $35.00 | $32.00 | $38.17 | $38.50 | $65.82 | 15% |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 20,620 FT | $5.00 | $6.00 | $6.80 | $7.20 | $6.27 | 13% |
| 625E10490 |
| Item | Quantity | R1Cornerstone Electric INC | R2Complete General Construction Company | R3Perram Electric INC | R4Miller Cable Company | R5Asplundh Construction LLC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $1,500 | $1,930 | $100 | $4,861 |
| 659E00300 TOPSOIL | 361 CY | $18.00 | $20.00 | $9.50 | $3.00 | $161 |
| 659E10000 SEEDING AND MULCHING | 3,250 SY | $1.00 | $3.00 | $0.50 | $2.95 | $8.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 163 SY | $0.80 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 36 EACH |
| $2,100 |
| $1,800 |
| $1,932 |
| $1,800 |
| $1,855 |
| 10% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT6B30 | 22 EACH | $2,000 | $1,600 | $1,712 | $1,500 | $1,611 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $20,000 | $20,000 | $40,000 | $44,254 | 5% |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 19,869 FT | $2.00 | $2.40 | $2.12 | $2.20 | $3.65 | 5% |
| 625E30700 PULL BOX, 725.08, 18" | 37 EACH | $900 | $850 | $1,008 | $750 | $1,131 | 4% |
| 625E37101 SERVICE TO UNDERPASS LIGHTING, AS PER PLAN | 2 EACH | $15,000 | $3,000 | $5,835 | $6,000 | $5,706 | 4% |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 24 EACH | $1,200 | $1,200 | $1,550 | $2,000 | $1,165 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $26,000 | $10,000 | $1,450 | $34,436 | $40,973 | 3% |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 20 EACH | $1,000 | $1,100 | $1,324 | $1,600 | $1,077 | 3% |
| 832E30000 EROSION CONTROL | 19,794 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 625E34001 POWER SERVICE, AS PER PLAN | 3 EACH | $6,000 | $11,000 | $11,220 | $9,600 | $8,013 | 2% |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 159 EACH | $100 | $100 | $111 | $85.00 | $106 | 2% |
| 625E14200 LIGHT POLE FOUNDATION, 24" X 10' DEEP | 9 EACH | $1,600 | $2,000 | $1,785 | $2,150 | $1,285 | 2% |
| 625E32000 GROUND ROD | 56 EACH | $225 | $300 | $261 | $210 | $196 | 2% |
| 625E00450 CONNECTION, FUSED PULL APART | 126 EACH | $90.00 | $90.00 | $83.65 | $85.00 | $98.81 | 1% |
| 625E75520 LUMINAIRE SUPPORT REMOVED | 59 EACH | $150 | $200 | $161 | $125 | $246 | 1% |
| 625E29001 TRENCH, AS PER PLAN | 872 FT | $10.00 | $32.00 | $19.40 | $12.75 | $1.45 | 1% |
| $0.85 |
| $0.70 |
| $85.00 |
| $8.39 |
| 659E15000 INTER-SEEDING | 163 SY | $0.50 | $0.10 | $0.50 | $1.00 | $8.39 |
| 659E20000 COMMERCIAL FERTILIZER | 0.73 TON | $550 | $570 | $590 | $570 | $1,658 |
| 659E31000 LIME | 0.67 ACRE | $100 | $65.00 | $97.00 | $65.00 | $2,084 |
| 659E35000 WATER | 18 MGAL | $4.00 | $1.00 | $2.10 | $1.00 | $71.90 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 225 FT | $3.00 | $15.00 | $7.00 | $1.90 | $14.41 |
| 625E10490 LIGHT POLE, CONVENTIONAL, A6B40 | 1 EACH | $2,200 | $1,600 | $1,700 | $1,550 | $1,598 |
| 625E14101 LIGHT POLE FOUNDATION, 24" X 8' DEEP, AS PER PLAN | 3 EACH | $1,500 | $2,000 | $2,340 | $2,350 | $1,165 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 5,356 FT | $1.50 | $1.50 | $1.16 | $1.50 | $1.55 |
| 625E25401 CONDUIT, 2", 725.04, AS PER PLAN | 301 FT | $20.00 | $25.00 | $31.00 | $14.00 | $50.31 |
| 625E25408 CONDUIT, 2", 725.051 | 184 FT | $5.00 | $6.00 | $6.30 | $8.00 | $4.89 |
| 625E25910 CONDUIT CLEANED AND CABLES REMOVED | 2,598 FT | $0.50 | $1.50 | $0.62 | $1.00 | $0.97 |
| 625E25920 CONDUIT, MISC.: REMOVAL OF BRIDGE MOUNTED CONDUIT | 301 FT | $10.00 | $5.00 | $2.65 | $1.00 | $8.25 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 14 EACH | $375 | $400 | $397 | $325 | $383 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 22 EACH | $375 | $400 | $408 | $320 | $396 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 12 EACH | $375 | $400 | $435 | $325 | $426 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 15 EACH | $425 | $400 | $475 | $400 | $469 |
| 625E27503 LUMINAIRE, UNDERPASS, SOLID STATE (LED), AS PER PL | 5 EACH | $1,000 | $600 | $520 | $600 | $762 |
| 625E30706 PULL BOX, 725.08, 24" | 8 EACH | $1,000 | $1,025 | $1,100 | $975 | $1,242 |
| 625E31510 PULL BOX REMOVED | 37 EACH | $150 | $250 | $161 | $125 | $399 |
| 625E36000 PLASTIC CAUTION TAPE | 19,979 FT | $0.25 | $0.30 | $0.05 | $0.20 | $0.02 |
| 625E38000 HIGH VOLTAGE TEST | 1 LS | $2,500 | $5,000 | $3,865 | $2,100 | $1,155 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $2,500 | $5,000 | $2,430 | $1,250 | $2,993 |
| 625E40010 SPECIAL - REPLACEMENT OF EXISTING LIGHTING UNIT | 1 EACH | $2,500 | $1,000 | $645 | $1,000 | $455 |
| 625E75506 LUMINAIRE REMOVED | 69 EACH | $25.00 | $50.00 | $39.65 | $25.00 | $122 |
| 625E75510 POWER SERVICE REMOVED | 3 EACH | $500 | $650 | $645 | $125 | $2,463 |
| 625E75522 LUMINAIRE SUPPORT FOUNDATION REMOVED | 56 EACH | $150 | $250 | $161 | $125 | $448 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL, S.R. 7 AND S.R. | 1 EACH | $800 | $1,000 | $2,500 | $1,500 | $1,226 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL, S.R. 7 CONN. NOR | 1 EACH | $800 | $1,000 | $2,500 | $1,500 | $1,226 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL, S.R. 7 CONN. SOU | 1 EACH | $800 | $1,000 | $2,500 | $1,500 | $1,226 |
| 625E98000 LIGHTING, MISC.: REUSE OF EXISTING BRIDGE MOUNTED | 3 EACH | $250 | $165 | $160 | $35.00 | $116 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $50.00 | $81.00 | $35.00 | $70.00 | $65.40 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,500 | $7,000 | $12,442 | $8,680 | $2,453 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $1,000 | $1,930 | $6,600 | $10,900 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 625E29000 TRENCH | 19,107 FT | $6.25 | $119k | 13% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 3,279 FT | $35 | $115k | 13% |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 20,620 FT | $5 | $103k | 11% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT6B40 | 36 EACH | $2,100 | $76k | 8% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT6B30 | 22 EACH | $2,000 | $44k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 4% |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 19,869 FT | $2 | $40k | 4% |
| 625E30700 PULL BOX, 725.08, 18" | 37 EACH | $900 | $33k | 4% |
| 625E37101 SERVICE TO UNDERPASS LIGHTING, AS PER PLAN | 2 EACH | $15,000 | $30k | 3% |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 24 EACH | $1,200 | $29k | 3% |