WAR-Franklin Signals Phase 2
WAR County · est $0.8M
Bid dateThursday, November 5—
WAR County · est $0.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 64 more items below.
| Item | Quantity | R1Perram Electric INC | R2Complete General Construction Company | R3Elex INC | R4Bansal Construction INC | % of bid |
|---|---|---|---|---|---|---|
| 809E69100 STOP LINE RADAR DETECTION | 12 EACH | $6,555 | $6,500 | $6,955 | $7,750 | 18% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 3 EACH | $12,370 | $14,000 | $13,425 | $16,575 | 8% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 6 EACH | $5,445 | $6,700 | $5,825 | $7,500 | 7% |
| 632E75481 SIGNAL SUPPORT, TYPE TC-12.30 DESIGN 10 POLE, WITH | 2 EACH | $16,030 | $20,000 | $20,430 | $18,675 |
| Item | Quantity | R1Perram Electric INC | R2Complete General Construction Company | R3Elex INC | R4Bansal Construction INC |
|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 5 SY | $200 | $96.00 | $130 | $140 |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 5 SY | $250 | $151 | $130 | $140 |
| 202E30000 WALK REMOVED | 1,909 SF | $3.75 | $5.00 | $7.00 | $3.75 |
| 202E30001 WALK REMOVED, AS PER PLAN | 155 SF | $4.80 | $8.50 | $7.00 | $4.80 |
| 202E32000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 7% |
| AA2 809E66030 TRAFFIC SIGNAL SYSTEM WITH EMERGENCY VEHICLE PRE-E | 3 EACH | $8,890 | $11,725 | $10,285 | $5,650 | 6% |
| 625E25600 CONDUIT, 4", 725.04 | 694 FT | $37.25 | $30.00 | $32.00 | $27.40 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | $10,000 | $20,000 | 5% |
| 625E30530 PULL BOX, 725.06, SIZE 18 | 12 EACH | $1,520 | $1,400 | $1,110 | $1,275 | 4% |
| 608E52000 CURB RAMP | 995 SF | $18.25 | $11.00 | $25.00 | $18.25 | 4% |
| 625E29601 TRENCH IN PAVED AREA, TYPE B, AS PER PLAN | 545 FT | $32.90 | $40.00 | $105 | $96.00 | 4% |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 3 EACH | $5,755 | $4,000 | $5,730 | $6,690 | 4% |
| 632E75455 SIGNAL SUPPORT, TYPE TC-12.30 DESIGN 9 POLE, WITH | 1 EACH | $15,265 | $21,000 | $20,620 | $17,750 | 3% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 22 EACH | $675 | $700 | $895 | $950 | 3% |
| 632E75411 SIGNAL SUPPORT, TYPE TC-12.30 DESIGN 8 POLE, WITH | 1 EACH | $14,495 | $19,000 | $19,240 | $16,825 | 3% |
| 809E60001 CCTV IP-CAMERA SYSTEM, DOME-TYPE, AS PER PLAN | 3 EACH | $4,335 | $10,000 | $8,170 | $11,250 | 3% |
| 608E12000 5" CONCRETE WALK | 1,945 SF | $6.50 | $10.00 | $15.00 | $6.50 | 3% |
| 809E69123 ATC V6.24 CONTROLLER, AS PER PLAN | 3 EACH | $3,980 | $4,500 | $4,675 | $4,780 | 3% |
| 804E38101 FIBER OPTIC CABLE MEDIA CONVERTER, ETHERNET, AS PE | 3 EACH | $3,850 | $4,950 | $4,410 | $4,750 | 3% |
| 625E30700 PULL BOX, 725.08, 18" | 11 EACH | $1,015 | $975 | $830 | $825 | 3% |
| 631E90501 INTERNALLY ILLUMINATED FIXED MESSAGE SIGN, AS PER | 6 EACH | $1,810 | $2,300 | $1,870 | $1,915 | 2% |
| 16 FT |
| $45.00 |
| $22.00 |
| $28.00 |
| $45.00 |
| 202E32500 CURB AND GUTTER REMOVED | 286 FT | $28.50 | $17.50 | $38.00 | $28.50 |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 35 CY | $310 | $465 | $250 | $310 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 5 SY | $200 | $109 | $180 | $325 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 135 FT | $49.75 | $68.00 | $65.00 | $49.75 |
| 609E26000 CURB, TYPE 6 | 16 FT | $52.00 | $70.00 | $55.00 | $52.00 |
| 625E00450 CONNECTION, FUSED PULL APART | 6 EACH | $115 | $108 | $85.00 | $56.00 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 6 EACH | $110 | $108 | $80.00 | $50.00 |
| 625E23304 NO. 8 AWG 600 VOLT DISTRIBUTION CABLE | 2,250 FT | $1.50 | $1.70 | $1.25 | $1.75 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 1,822 FT | $0.75 | $3.00 | $0.85 | $1.65 |
| 625E25408 CONDUIT, 2", 725.051 | 1,153 FT | $6.55 | $9.00 | $4.00 | $3.75 |
| 625E25604 CONDUIT, 4", 725.051 | 214 FT | $13.05 | $15.00 | $11.00 | $8.25 |
| 625E25900 CONDUIT, JACKED OR DRILLED, 2", 725.052 | 91 FT | $36.15 | $40.00 | $34.00 | $52.00 |
| 625E29002 TRENCH, 24" DEEP | 1,244 FT | $8.45 | $10.00 | $13.25 | $10.65 |
| 625E29500 TRENCH IN PAVED AREA, TYPE A | 86 FT | $52.30 | $21.50 | $18.00 | $13.20 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $1,200 | $1,195 | $940 | $1,050 |
| 625E32000 GROUND ROD | 15 EACH | $260 | $250 | $265 | $325 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 42 FT | $14.55 | $12.00 | $15.00 | $12.00 |
| 630E79101 SIGN HANGER ASSEMBLY, MAST ARM, AS PER PLAN | 21 EACH | $250 | $223 | $315 | $125 |
| 630E83000 COVERING OF SIGN | 166 SF | $0.65 | $5.00 | $1.15 | $1.50 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $120 | $65.00 | $75.00 | $65.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $55.00 | $25.00 | $35.00 | $25.00 |
| 631E88000 PHOTOELECTRIC CONTROL | 3 EACH | $355 | $350 | $165 | $190 |
| 631E90501 INTERNALLY ILLUMINATED FIXED MESSAGE SIGN, AS PER | 1 EACH | $925 | $1,900 | $1,130 | $1,200 |
| 631E90501 INTERNALLY ILLUMINATED FIXED MESSAGE SIGN, AS PER | 8 EACH | $1,145 | $1,950 | $1,360 | $1,480 |
| 631E90501 INTERNALLY ILLUMINATED FIXED MESSAGE SIGN, AS PER | 4 EACH | $1,780 | $2,200 | $1,865 | $1,900 |
| 631E90501 INTERNALLY ILLUMINATED FIXED MESSAGE SIGN, AS PER | 2 EACH | $1,810 | $2,625 | $1,870 | $1,970 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 2 EACH | $1,150 | $1,150 | $1,405 | $1,490 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 24 EACH | $402 | $525 | $580 | $780 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 24 EACH | $10.00 | $35.00 | $5.00 | $35.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 24 EACH | $5.00 | $30.00 | $5.00 | $35.00 |
| 632E26001 PEDESTRIAN PUSHBUTTON, AS PER PLAN | 12 EACH | $290 | $250 | $170 | $220 |
| 632E40300 SIGNAL CABLE, 3 CONDUCTOR, NO. 14 AWG | 245 FT | $1.60 | $1.80 | $2.20 | $1.75 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 3,790 FT | $1.83 | $2.10 | $2.40 | $1.90 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 2,095 FT | $2.00 | $2.50 | $2.60 | $2.00 |
| 632E62820 INTERCONNECT, MISC.: MANAGED GIGABIT ETHERNET NETW | 1 EACH | $9,985 | $10,500 | $10,150 | $12,150 |
| 632E64020 PEDESTAL FOUNDATION | 6 EACH | $750 | $900 | $830 | $1,500 |
| 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG | 199 FT | $2.90 | $2.85 | $3.25 | $3.00 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 105 FT | $5.00 | $4.85 | $5.00 | $3.75 |
| 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG | 223 FT | $1.75 | $4.85 | $5.00 | $3.75 |
| 632E70001 POWER SERVICE, AS PER PLAN | 3 EACH | $1,300 | $2,650 | $3,000 | $3,500 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 1 EACH | $665 | $550 | $490 | $500 |
| 632E75133 SIGNAL SUPPORT, TYPE TC-12.30 DESIGN 5 POLE, WITH | 1 EACH | $9,630 | $13,000 | $13,705 | $11,175 |
| 632E75153 SIGNAL SUPPORT, TYPE TC-12.30 DESIGN 5 POLE, WITH | 1 EACH | $9,775 | $14,300 | $13,410 | $11,350 |
| 632E77233 SIGNAL SUPPORT, MECHANICAL DAMPER FOR TC-81.21 MAS | 10 EACH | $640 | $600 | $455 | $710 |
| 632E89901 PEDESTAL, 8', TRANSFORMER BASE, AS PER PLAN | 6 EACH | $1,100 | $975 | $400 | $590 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 3 EACH | $995 | $3,200 | $3,170 | $5,000 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 3 EACH | $1,820 | $3,000 | $1,635 | $1,035 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 3 EACH | $375 | $925 | $605 | $650 |
| 804E20056 FIBER OPTIC CABLE, ARMORED, 60 FIBER | 1,369 FT | $3.35 | $4.75 | $3.00 | $4.75 |
| 804E30011 FAN-OUT KIT, 12 FIBER, AS PER PLAN | 3 EACH | $5.00 | $875 | $165 | $45.00 |
| 804E32011 DROP CABLE, 12 FIBER, AS PER PLAN | 3 EACH | $450 | $775 | $425 | $1,000 |
| 804E34013 FIBER TERMINATION PANEL, 12 FIBER, AS PER PLAN | 3 EACH | $710 | $1,250 | $385 | $1,500 |
| 804E37001 SPLICE ENCLOSURE, AS PER PLAN | 3 EACH | $1,055 | $2,040 | $1,750 | $650 |
| 804E37701 FIBER OPTIC CABLE TESTING, AS PER PLAN | 1 LS | $4,390 | $5,250 | $1,650 | $2,500 |
| 804E98000 FIBER OPTIC CABLE, MISC.: SLACK INSTALLATION | 1,350 FT | $3.50 | $4.75 | $3.50 | $0.75 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 20 HOUR | $65.00 | $75.00 | $70.00 | $48.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,486 | $8,000 | $8,500 | $6,271 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $9,000 | $5,000 | $10,000 | $20,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,000 | $3,000 | $10,000 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 809E69100 STOP LINE RADAR DETECTION | 12 EACH | $6,555 | $79k | 12% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 3 EACH | $12,370 | $37k | 5% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 6 EACH | $5,445 | $33k | 5% |
| 632E75481 SIGNAL SUPPORT, TYPE TC-12.30 DESIGN 10 POLE, WITH | 2 EACH | $16,030 | $32k | 5% |
| AA2 809E66030 TRAFFIC SIGNAL SYSTEM WITH EMERGENCY VEHICLE PRE-E | 3 EACH | $8,890 | $27k | 4% |
| 625E25600 CONDUIT, 4", 725.04 | 694 FT | $37.25 | $26k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 3% |
| 625E30530 PULL BOX, 725.06, SIZE 18 | 12 EACH | $1,520 | $18k | 3% |
| 608E52000 CURB RAMP | 995 SF | $18.25 | $18k | 3% |
| 625E29601 TRENCH IN PAVED AREA, TYPE B, AS PER PLAN | 545 FT | $32.9 | $18k | 3% |