D06-ITS Maintenance FY 20
D06 County · est $0.9M
Bid dateThursday, May 7—
D06 County · est $0.9M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 22 more items below.
| Item | Quantity | R1Asplundh Construction LLC | R2Complete General Construction Company | R3Miller Cable Company | R4Perram Electric INC | % of bid |
|---|---|---|---|---|---|---|
| 804E15010 FIBER OPTIC CABLE, 24 FIBER | 32,320 FT | $3.48 | $3.25 | $4.00 | $4.92 | 15% |
| 809E61000 CCTV CONCRETE POLE WITH LOWERING UNIT, 70 FEET | 2 EACH | $42,861 | $37,000 | $37,000 | $50,365 | 12% |
| 809E65000 ITS CABINET - GROUND MOUNTED | 9 EACH | $7,324 | $11,000 | $8,000 | $8,965 | 9% |
| 625E25740 CONDUIT, MULTICELL, 4", 725.20, SCHEDULE 80, JACKE | 875 FT | $74.24 | $58.00 | $40.00 |
| Item | Quantity | R1Asplundh Construction LLC | R2Complete General Construction Company | R3Miller Cable Company | R4Perram Electric INC |
|---|---|---|---|---|---|
| 606E15050 GUARDRAIL, TYPE MGS | 190 FT | $23.87 | $21.70 | $2.00 | $21.70 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 2 EACH | $3,119 | $2,835 | $3,300 | $2,835 |
| 607E50901 GATE, TYPE CL, AS PER PLAN | 2 EACH | $3,850 | $3,500 | $3,200 | $3,500 |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 2,475 SY | $2.88 | $1.75 | $2.70 | $0.20 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $70.95 |
| 9% |
| 809E60030 CCTV IP-CAMERA SYSTEM, ENHANCED | 8 EACH | $7,617 | $7,000 | $6,200 | $5,615 | 8% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $50,451 | $7,000 | $6,058 | $14,473 | 7% |
| 625E30711 PULL BOX, 725.08, 32", AS PER PLAN | 31 EACH | $1,465 | $2,800 | $2,200 | $3,055 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $33,066 | $10,000 | $69,500 | $33,800 | 5% |
| 625E25750 CONDUIT, 4", MULTICELL, 725.20 , EPC-40 | 3,545 FT | $9.15 | $19.00 | $16.00 | $33.05 | 4% |
| 625E29010 TRENCH, 30" DEEP | 4,950 FT | $6.28 | $8.00 | $16.00 | $12.00 | 4% |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 11 EACH | $2,702 | $2,200 | $3,000 | $3,255 | 4% |
| 632E70001 POWER SERVICE, AS PER PLAN, A | 6 EACH | $4,251 | $4,000 | $12,500 | $3,505 | 3% |
| 625E22900 NO. 1/0 AWG 2400 VOLT DISTRIBUTION CABLE | 4,620 FT | $4.59 | $4.00 | $3.50 | $4.37 | 3% |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 10 EACH | $1,470 | $2,200 | $1,400 | $940 | 2% |
| 625E30700 PULL BOX, 725.08, 18" | 20 EACH | $572 | $1,100 | $725 | $1,230 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $11,000 | $3,000 | $13,700 | $10,000 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,049 | $10,000 | $14,000 | $10,020 | 1% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 625E22990 NO. 6 AWG 600 VOLT DISTRIBUTION CABLE | 3,405 FT | $2.57 | $2.00 | $1.60 | $1.92 | 1% |
| 632E70001 POWER SERVICE, AS PER PLAN, B | 2 EACH | $4,002 | $3,000 | $3,600 | $2,350 | 1% |
| 0.35 TON |
| $1,554 |
| $500 |
| $410 |
| $200 |
| 659E35000 WATER | 14 MGAL | $1.07 | $1.00 | $0.25 | $10.00 |
| 625E00470 CONNECTION, UNFUSED BOLTED | 2 EACH | $88.60 | $100 | $120 | $310 |
| 625E25408 CONDUIT, 2", 725.051 | 1,655 FT | $1.64 | $7.00 | $7.00 | $4.65 |
| 625E25908 CONDUIT, JACKED OR DRILLED, 725.052, 2", SCHEDULE | 150 FT | $26.10 | $26.00 | $16.00 | $30.10 |
| 625E32001 GROUND ROD, AS PER PLAN | 31 EACH | $171 | $220 | $265 | $267 |
| 625E36000 PLASTIC CAUTION TAPE | 4,950 FT | $0.02 | $0.20 | $1.50 | $0.05 |
| 632E64020 PEDESTAL FOUNDATION | 2 EACH | $867 | $1,350 | $1,000 | $985 |
| 632E70001 POWER SERVICE, AS PER PLAN, C | 1 EACH | $4,056 | $3,000 | $6,250 | $2,350 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 1 EACH | $404 | $675 | $550 | $750 |
| 632E89701 PEDESTAL, 11', AS PER PLAN | 2 EACH | $1,261 | $1,400 | $350 | $980 |
| 632E90000 PEDESTAL, 11', TRANSFORMER BASE | 2 EACH | $590 | $700 | $500 | $980 |
| 809E64550 ETHERNET CABLE, OUTDOOR-RATED | 750 FT | $2.71 | $2.95 | $3.00 | $1.50 |
| 809E65990 ITS DEVICE, MISC.:, CCTV FIXED, INSTALL ONLY | 4 EACH | $559 | $2,450 | $1,000 | $770 |
| 809E65990 ITS DEVICE, MISC.:, REMOVAL OF POLE OR DEVICE | 15 EACH | $437 | $825 | $750 | $735 |
| 809E70000 MAINTAINING ITS DURING CONSTRUCTION | 1 LS | $6,634 | $8,000 | $100 | $1,000 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 50 HOUR | $64.20 | $75.00 | $95.00 | $65.00 |
| 624E10000 MOBILIZATION | 1 LS | $5,350 | $20,000 | $20,000 | $40,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 804E15010 FIBER OPTIC CABLE, 24 FIBER | 32,320 FT | $3.48 | $112k | 14% |
| 809E61000 CCTV CONCRETE POLE WITH LOWERING UNIT, 70 FEET | 2 EACH | $42,861 | $86k | 11% |
| 809E65000 ITS CABINET - GROUND MOUNTED | 9 EACH | $7,324 | $66k | 8% |
| 625E25740 CONDUIT, MULTICELL, 4", 725.20, SCHEDULE 80, JACKE | 875 FT | $74.24 | $65k | 8% |
| 809E60030 CCTV IP-CAMERA SYSTEM, ENHANCED | 8 EACH | $7,617 | $61k | 8% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $50,451 | $50k | 6% |
| 625E30711 PULL BOX, 725.08, 32", AS PER PLAN | 31 EACH | $1,465 | $45k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $33,066 | $33k | 4% |
| 625E25750 CONDUIT, 4", MULTICELL, 725.20 , EPC-40 | 3,545 FT | $9.15 | $32k | 4% |
| 625E29010 TRENCH, 30" DEEP | 4,950 FT | $6.28 | $31k | 4% |