| Item | Quantity | R1L J Deweese CO INC | R2Double Jay Construction INC | R3Outdoor Enterprise LLC | R4Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 8,459 SF | $8.50 | $6.90 | $11.00 | $11.00 | 13% |
| 644E50300 PAVEMENT MARKING, MISC.: PIANO KEYS, 24" | 14,302 FT | $4.55 | $5.05 | $5.00 | $4.50 | 12% |
| 632E20730 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN | 118 EACH | $475 | $522 | $515 | $455 | 10% |
| 608E52001 CURB RAMP, AS PER PLAN | 3,067 SF | $15.00 | $14.70 | $20.00 |
| Item | Quantity | R1L J Deweese CO INC | R2Double Jay Construction INC | R3Outdoor Enterprise LLC | R4Complete General Construction Company |
|---|---|---|---|---|---|
| 202E23001 PAVEMENT REMOVED, AS PER PLAN (CONCRETE FULL-DEPTH | 113 SY | $34.00 | $19.45 | $60.00 | $40.00 |
| 202E35101 PIPE REMOVED, 24" AND UNDER, AS PER PLAN | 37 FT | $19.00 | $38.95 | $25.00 | $58.00 |
| 202E58001 MANHOLE REMOVED, AS PER PLAN | 2 EACH | $475 | $711 | $1,200 | $1,500 |
| 202E58101 CATCH BASIN REMOVED, AS PER PLAN | 6 EACH | $450 | $375 | $1,200 | $950 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $17.00 |
| 9% |
| 644E00601 CROSSWALK LINE, AS PER PLAN | 14,375 FT | $2.70 | $2.80 | $2.75 | $2.50 | 7% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $32,000 | $37,700 | $90,000 | $75,000 | 6% |
| 611E98180 CATCH BASIN, NO. 3A | 8 EACH | $3,500 | $2,546 | $3,000 | $4,100 | 5% |
| 202E30001 WALK REMOVED, AS PER PLAN | 6,658 SF | $3.80 | $1.50 | $3.00 | $6.00 | 5% |
| 611E04400 12" CONDUIT, TYPE B706.02 | 295 FT | $85.00 | $78.40 | $85.00 | $170 | 5% |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 690 FT | $35.00 | $41.00 | $35.00 | $56.00 | 4% |
| 644E00501 STOP LINE, AS PER PLAN | 4,165 FT | $4.70 | $5.30 | $5.30 | $4.75 | 4% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $17,500 | $13,215 | $16,000 | $10,000 | 3% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN (ASPHALT ON CONCRETE | 416 SY | $34.00 | $21.55 | $60.00 | $35.00 | 3% |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 4,248 FT | $3.10 | $3.70 | $3.70 | $3.30 | 2% |
| 646E90000 PAVEMENT MARKING, MISC.: PIANO KEYS, 24" | 1,642 FT | $7.60 | $10.20 | $10.00 | $9.10 | 2% |
| 646E10501 CROSSWALK LINE, AS PER PLAN | 2,237 FT | $5.10 | $5.10 | $5.00 | $4.55 | 2% |
| 611E99574 MANHOLE, NO. 3 | 3 EACH | $3,500 | $2,569 | $2,800 | $4,500 | 2% |
| 202E32001 CURB REMOVED, AS PER PLAN | 1,073 FT | $9.50 | $12.50 | $12.00 | $15.00 | 2% |
| 624E10001 MOBILIZATION, AS PER PLAN | 1 LS | $10,000 | $43,960 | $38,000 | $20,000 | 2% |
| 255E10200 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 107 SY | $80.00 | $106 | $100 | $210 | 2% |
| 22 SY |
| $180 |
| $177 |
| $250 |
| $250 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 1,174 FT | $2.50 | $3.70 | $2.50 | $5.00 |
| 608E13001 6" CONCRETE WALK, AS PER PLAN | 55 SF | $12.00 | $9.80 | $13.00 | $22.00 |
| 608E53021 DETECTABLE WARNING, AS PER PLAN | 40 SF | $75.00 | $35.60 | $35.00 | $135 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 659E00301 TOPSOIL, AS PER PLAN | 21 CY | $100 | $60.00 | $150 | $125 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 125 SY | $8.00 | $13.45 | $22.00 | $19.60 |
| 659E20001 COMMERCIAL FERTILIZER, AS PER PLAN | 0.02 TON | $700 | $1,120 | $800 | $550 |
| 659E31001 LIME, AS PER PLAN | 0.03 ACRE | $700 | $1,120 | $800 | $100 |
| 659E35001 WATER, AS PER PLAN | 1 MGAL | $20.00 | $100 | $5.00 | $1.00 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 4 EACH | $750 | $414 | $800 | $1,000 |
| 611E98390 CATCH BASIN, NO. 7 | 1 EACH | $2,000 | $1,442 | $2,000 | $3,200 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 2 EACH | $250 | $193 | $180 | $425 |
| 620E60000 DELINEATOR, POST SURFACE MOUNTED | 8 EACH | $90.00 | $782 | $96.00 | $215 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 279 FT | $16.00 | $16.80 | $16.00 | $13.00 |
| 630E79501 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, AS PER PLAN | 3 EACH | $140 | $151 | $150 | $165 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 263 SF | $20.00 | $21.40 | $21.00 | $16.00 |
| 630E84901 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, AS PE | 4 EACH | $16.00 | $17.00 | $16.00 | $10.00 |
| 630E85101 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, AS | 1 EACH | $160 | $168 | $165 | $75.00 |
| 630E86003 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 9 EACH | $26.00 | $28.00 | $28.00 | $15.00 |
| 630E87401 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL, AS | 5 EACH | $130 | $140 | $137 | $145 |
| 630E87501 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL, AS PER | 8 EACH | $21.00 | $22.50 | $22.00 | $25.00 |
| 631E94251 REMOVAL OF LUMINAIRE, AS PER PLAN | 2 EACH | $105 | $117 | $114 | $293 |
| 644E00201 LANE LINE, 4", AS PER PLAN | 0.1 MILE | $5,200 | $2,800 | $2,800 | $2,500 |
| 644E00301 CENTER LINE, AS PER PLAN | 0.1 MILE | $8,700 | $7,280 | $7,200 | $6,500 |
| 644E00401 CHANNELIZING LINE, 8", AS PER PLAN | 125 FT | $1.20 | $2.30 | $2.30 | $2.05 |
| 644E01301 LANE ARROW, AS PER PLAN | 16 EACH | $80.00 | $78.40 | $77.00 | $70.00 |
| 644E20801 YIELD LINE, AS PER PLAN | 44 FT | $5.10 | $16.80 | $17.00 | $15.00 |
| 644E30020 REMOVAL OF PAVEMENT MARKING | 1 EACH | $110 | $1,310 | $1,287 | $1,170 |
| 646E10401 STOP LINE, AS PER PLAN | 413 FT | $11.00 | $6.65 | $7.00 | $5.95 |
| 646E20301 LANE ARROW, AS PER PLAN | 17 EACH | $210 | $241 | $236 | $215 |
| 646E20501 DOTTED LINE, AS PER PLAN | 100 FT | $2.10 | $5.60 | $5.50 | $5.00 |
| 646E50101 REMOVAL OF PAVEMENT MARKING, AS PER PLAN | 1,068 FT | $4.10 | $3.70 | $3.70 | $3.30 |
| 644E50300 PAVEMENT MARKING, MISC.:, DOTTED LINE, 8", AS PER | 100 FT | $1.15 | $4.60 | $4.40 | $2.50 |
| 625E31600 PULL BOX, MISC.: ADJUSTED TO GRADE | 3 EACH | $465 | $501 | $500 | $420 |
| 632E04803 VEHICULAR SIGNAL HEAD, (LED), 1-SECTION, 12" LENS, | 4 EACH | $380 | $419 | $410 | $500 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM, PEDE | 118 EACH | $55.00 | $54.90 | $54.00 | $140 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM, VEHI | 4 EACH | $105 | $108 | $108 | $129 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 50 HOUR | $80.00 | $95.00 | $70.00 | $81.00 |
| 614E12600 REPLACEMENT DRUM | 20 EACH | $65.00 | $73.00 | $70.00 | $125 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,500 | $6,053 | $8,500 | $7,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 8,459 SF | $8.5 | $72k | 12% |
| 644E50300 PAVEMENT MARKING, MISC.: PIANO KEYS, 24" | 14,302 FT | $4.55 | $65k | 11% |
| 632E20730 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN | 118 EACH | $475 | $56k | 9% |
| 608E52001 CURB RAMP, AS PER PLAN | 3,067 SF | $15 | $46k | 7% |
| 644E00601 CROSSWALK LINE, AS PER PLAN | 14,375 FT | $2.7 | $39k | 6% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $32,000 | $32k | 5% |
| 611E98180 CATCH BASIN, NO. 3A | 8 EACH | $3,500 | $28k | 5% |
| 202E30001 WALK REMOVED, AS PER PLAN | 6,658 SF | $3.8 | $25k | 4% |
| 611E04400 12" CONDUIT, TYPE B706.02 | 295 FT | $85 | $25k | 4% |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 690 FT | $35 | $24k | 4% |