MIA-US 36-11.56
MIA County · est $0.2M
Bid dateThursday, April 1—
MIA County · est $0.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 42 more items below.
| Item | Quantity | R1Perram Electric INC | R2Complete General Construction Company | % of bid |
|---|---|---|---|---|
| 608E52001 CURB RAMP, AS PER PLAN | 1,122 SF | $16.50 | $13.00 | 15% |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 764 FT | $15.65 | $20.00 | 10% |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 238 FT | $49.50 | $45.00 | 10% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 15 EACH | $700 | $825 | 9% |
| 632E89901 PEDESTAL, 8', TRANSFORMER BASE, AS PER PLAN | 7 EACH | $985 | $900 | 6% |
| 608E53020 DETECTABLE WARNING | 136 SF | $49.50 | $38.00 | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 15 CY | $385 | $500 | 5% |
| 632E64020 PEDESTAL FOUNDATION |
| Item | Quantity | R1Perram Electric INC | R2Complete General Construction Company |
|---|---|---|---|
| 202E23000 PAVEMENT REMOVED ASPHALT | 53 SY | $16.50 | $30.00 |
| 202E30000 WALK REMOVED | 237 SF | $4.40 | $3.00 |
| 204E10000 SUBGRADE COMPACTION | 102 SY | $1.10 | $12.25 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 238 FT | $3.30 | $5.00 |
| 659E00300 TOPSOIL | 15 CY | $82.50 | $50.00 |
| 659E10000 SEEDING AND MULCHING | 100 SY | $5.50 | $12.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 10 SY | $1.10 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 7 EACH |
| $770 |
| $1,200 |
| 4% |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 12 EACH | $440 | $450 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $10,000 | 4% |
| 644E00601 CROSSWALK LINE, AS PER PLAN, 24" | 650 FT | $6.90 | $6.25 | 4% |
| 632E40300 SIGNAL CABLE, 3 CONDUCTOR, NO. 14 AWG | 1,462 FT | $2.85 | $2.50 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $4,000 | 3% |
| 625E30700 PULL BOX, 725.08, 18" | 3 EACH | $1,115 | $825 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,236 | $4,000 | 3% |
| 202E32500 CURB AND GUTTER REMOVED | 233 FT | $13.20 | $8.00 | 3% |
| 632E40200 SIGNAL CABLE, 2 CONDUCTOR, NO. 14 AWG | 1,080 FT | $2.80 | $2.00 | 2% |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | 2% |
| 632E26500 DETECTOR LOOP | 2 EACH | $1,470 | $2,400 | 2% |
| 625E29002 TRENCH, 24" DEEP | 198 FT | $14.45 | $15.00 | 2% |
| $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.25 TON | $880 | $550 |
| 659E35000 WATER | 15 MGAL | $27.50 | $50.00 |
| 659E40000 MOWING | 5 MSF | $27.50 | $70.00 |
| 670E00710 DITCH EROSION PROTECTION MAT, TYPE A | 20 SY | $11.00 | $6.00 |
| 304E20000 AGGREGATE BASE | 14 CY | $82.50 | $120 |
| 407E20000 NON-TRACKING TACK COAT | 9 GAL | $27.50 | $10.00 |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 3 CY | $550 | $500 |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 3 CY | $550 | $500 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 0.68 MILE | $1,100 | $1,000 |
| 642E00200 LANE LINE, 4", TYPE 1 | 0.55 MILE | $790 | $718 |
| 642E00300 CENTER LINE, TYPE 1 | 0.5 MILE | $2,145 | $1,952 |
| 642E00400 CHANNELIZING LINE, 8", TYPE 1 | 988 FT | $1.00 | $0.90 |
| 644E00500 STOP LINE | 233 FT | $7.70 | $7.00 |
| 644E01300 LANE ARROW | 23 EACH | $105 | $93.00 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 184 FT | $6.05 | $5.50 |
| 644E30020 REMOVAL OF PAVEMENT MARKING | 14 EACH | $93.50 | $85.00 |
| 625E25408 CONDUIT, 2", 725.051 | 198 FT | $7.65 | $7.00 |
| 625E31600 PULL BOX, MISC.: MODIFY EXISITNG PULL BOX | 5 EACH | $180 | $160 |
| 625E31600 PULL BOX, MISC.:ADJUST PULL BOX TO GRADE | 1 EACH | $1,075 | $450 |
| 625E32000 GROUND ROD | 7 EACH | $290 | $240 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 2 EACH | $135 | $330 |
| 630E80100 SIGN, FLAT SHEET | 4.5 SF | $49.00 | $80.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $180 | $250 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 1 EACH | $1,235 | $1,200 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 16 EACH | $11.00 | $30.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 12 EACH | $5.50 | $30.00 |
| 632E26001 PEDESTRIAN PUSHBUTTON, AS PER PLAN | 6 EACH | $320 | $330 |
| 632E27004 LOOP DETECTOR UNIT | 1 EACH | $230 | $215 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 680 FT | $3.10 | $2.00 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM: REMO | 4 EACH | $44.70 | $120 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM: REMO | 8 EACH | $44.70 | $140 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM: REMO | 16 EACH | $89.50 | $170 |
| 633E99000 CONTROLLER ITEM, MISC.:MODIFY EXISTING CONTROLLER | 2 EACH | $905 | $2,000 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 32 HOUR | $65.00 | $85.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $4,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 608E52001 CURB RAMP, AS PER PLAN | 1,122 SF | $16.5 | $19k | 11% |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 764 FT | $15.65 | $12k | 7% |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 238 FT | $49.5 | $12k | 7% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 15 EACH | $700 | $11k | 6% |
| 632E89901 PEDESTAL, 8', TRANSFORMER BASE, AS PER PLAN | 7 EACH | $985 | $7k | 4% |
| 608E53020 DETECTABLE WARNING | 136 SF | $49.5 | $7k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 15 CY | $385 | $6k | 4% |
| 632E64020 PEDESTAL FOUNDATION | 7 EACH | $770 | $5k | 3% |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 12 EACH | $440 | $5k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $5k | 3% |