GAL-SR 160-09.57
GAL County · est $1.9M
Bid dateThursday, April 29—
GAL County · est $1.9M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 108 more items below.
| Item | Quantity | R1Shelly Company | R2Complete General Construction Company | R3Shelly & Sands INC | R4Axis Civil Construction LLC | R5Allard Excavation LLC | R6Geiger Brothers INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,287 CY | $140 | $140 | $140 | $140 | $140 | $153 | 13% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $150,000 | $140,000 | $125,000 | $200,000 | $143,000 | $226,806 | 11% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 2,888 CY | $50.00 |
| Item | Quantity | R1Shelly Company | R2Complete General Construction Company | R3Shelly & Sands INC | R4Axis Civil Construction LLC | R5Allard Excavation LLC | R6Geiger Brothers INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $17,000 | $15,000 | $14,000 | $10,000 | $4,982 | $21,679 |
| 202E20010 HEADWALL REMOVED | 1 EACH | $285 | $400 | $120 | $500 | $425 | $412 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 899 FT | $26.75 | $20.00 | $25.00 | $21.00 | $10.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $45.00 |
| $58.75 |
| $74.00 |
| $62.80 |
| $61.37 |
| 10% |
| 203E20000 EMBANKMENT | 5,767 CY | $20.75 | $8.00 | $15.00 | $16.00 | $9.70 | $22.73 | 9% |
| 304E20000 AGGREGATE BASE | 1,786 CY | $54.75 | $70.00 | $73.00 | $86.00 | $68.25 | $61.94 | 7% |
| 204E13000 EXCAVATION OF SUBGRADE | 2,888 CY | $25.00 | $18.00 | $11.75 | $18.00 | $14.35 | $17.02 | 5% |
| 203E10000 EXCAVATION | 3,538 CY | $17.50 | $16.00 | $12.00 | $16.00 | $7.75 | $17.50 | 4% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (335 CY | $170 | $170 | $170 | $170 | $170 | $185 | 4% |
| 638E98600 WATER WORK, MISC.: 6" WATER MAIN, HDPE PIPE AND FI | 445 FT | $115 | $91.00 | $122 | $65.00 | $75.90 | $79.39 | 4% |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 700 SY | $69.30 | $79.00 | $83.00 | $70.00 | $65.00 | $103 | 4% |
| 611E13400 30" CONDUIT, TYPE B | 362 FT | $122 | $140 | $140 | $135 | $131 | $107 | 3% |
| 609E72000 CONCRETE MEDIAN | 531 SY | $83.00 | $98.00 | $95.00 | $78.00 | $90.75 | $93.44 | 3% |
| 638E98600 WATER WORK, MISC.: 10" PVC PIPE ENCASEMENT, OPEN C | 217 FT | $195 | $164 | $15.00 | $26.00 | $44.00 | $88.04 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 239 CY | $173 | $173 | $173 | $173 | $173 | $189 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $100,000 | $100,000 | $95,000 | $230,000 | $42,890 | 3% |
| 452E13010 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 492 SY | $81.25 | $94.00 | $72.00 | $78.00 | $72.60 | $112 | 3% |
| 202E23000 PAVEMENT REMOVED | 6,984 SY | $5.45 | $8.00 | $9.00 | $11.00 | $5.20 | $7.76 | 3% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 1,519 FT | $25.00 | $32.00 | $35.00 | $25.00 | $27.25 | $12.55 | 3% |
| 832E30000 EROSION CONTROL | 35,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 253E01000 PAVEMENT REPAIR | 1,134 SY | $30.50 | $30.50 | $30.50 | $30.50 | $30.50 | $33.25 | 3% |
| $27.81 |
| 202E35200 PIPE REMOVED, OVER 24" | 244 FT | $28.75 | $50.00 | $30.00 | $28.00 | $15.75 | $64.95 |
| 202E53100 MAILBOX REMOVED | 12 EACH | $35.00 | $50.00 | $100 | $100 | $41.75 | $99.17 |
| 202E58100 CATCH BASIN REMOVED | 4 EACH | $285 | $350 | $200 | $850 | $408 | $59.75 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT (12" DIAM | 25 FT | $185 | $48.00 | $45.00 | $38.00 | $44.00 | $55.08 |
| 202E75000 FENCE REMOVED | 215 FT | $1.15 | $7.00 | $8.00 | $3.00 | $1.25 | $7.20 |
| 204E10000 SUBGRADE COMPACTION | 9,965 SY | $1.05 | $2.00 | $3.50 | $3.00 | $4.28 | $2.05 |
| 204E45000 PROOF ROLLING | 7 HOUR | $185 | $275 | $220 | $250 | $85.00 | $211 |
| 608E15000 8" CONCRETE WALK | 705 SF | $7.70 | $11.00 | $20.50 | $11.00 | $18.35 | $14.22 |
| 608E52001 CURB RAMP, AS PER PLAN | 296 SF | $16.00 | $30.00 | $47.50 | $18.00 | $15.00 | $22.32 |
| 608E53020 DETECTABLE WARNING | 160 SF | $25.00 | $40.00 | $33.25 | $25.00 | $25.75 | $29.65 |
| 623E40500 REFERENCE MONUMENT | 34 EACH | $260 | $500 | $470 | $225 | $385 | $428 |
| 690E50000 SPECIAL - MAILBOX SUPPORT | 10 EACH | $165 | $160 | $160 | $250 | $350 | $142 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 305 SY | $41.50 | $65.00 | $48.50 | $40.00 | $50.00 | $71.13 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 7 CY | $545 | $190 | $270 | $150 | $135 | $425 |
| 659E00300 TOPSOIL | 868 CY | $35.00 | $30.00 | $26.00 | $28.00 | $16.00 | $55.14 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 7,816 SY | $1.00 | $1.10 | $1.10 | $1.10 | $1.65 | $1.20 |
| 659E14000 REPAIR SEEDING AND MULCHING | 391 SY | $1.25 | $1.10 | $1.10 | $1.10 | $3.20 | $1.20 |
| 659E15000 INTER-SEEDING | 391 SY | $1.25 | $1.10 | $1.10 | $1.10 | $3.20 | $1.20 |
| 659E20000 COMMERCIAL FERTILIZER | 1.05 TON | $750 | $610 | $610 | $610 | $500 | $665 |
| 659E31000 LIME | 1.61 ACRE | $250 | $80.00 | $80.00 | $80.00 | $75.00 | $86.96 |
| 659E35000 WATER | 42 MGAL | $10.00 | $1.00 | $1.00 | $1.00 | $2.00 | $1.10 |
| 670E00520 SLOPE EROSION PROTECTION MAT, TYPE B | 3,018 SY | $2.50 | $1.85 | $1.85 | $1.85 | $1.95 | $2.02 |
| 670E00720 DITCH EROSION PROTECTION MAT, TYPE B | 758 SY | $2.50 | $2.00 | $2.00 | $2.00 | $1.95 | $2.18 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,650 | $1,250 | $1,700 | $1,250 | $1,595 | $1,363 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $720 | $6,675 | $5,000 | $6,675 | $7,000 | $7,276 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $6,189 | $7,000 | $7,120 | $8,351 | $7,200 | $7,762 |
| 602E20000 CONCRETE MASONRY | 2.5 CY | $2,200 | $3,000 | $2,050 | $1,800 | $2,500 | $1,904 |
| 605E05200 4" UNCLASSIFIED PIPE UNDERDRAINS | 514 FT | $11.00 | $12.00 | $12.25 | $12.00 | $17.50 | $27.22 |
| 605E06000 4" BASE PIPE UNDERDRAINS | 3,095 FT | $10.25 | $12.00 | $10.50 | $12.00 | $10.25 | $17.39 |
| 605E31100 AGGREGATE DRAINS | 83 FT | $12.50 | $9.00 | $19.25 | $10.00 | $20.00 | $45.49 |
| 611E00100 4" CONDUIT, TYPE B | 100 FT | $15.50 | $20.00 | $15.00 | $12.00 | $30.00 | $30.47 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 153 FT | $26.50 | $15.00 | $22.00 | $12.00 | $33.00 | $30.78 |
| 611E00900 6" CONDUIT, TYPE B | 100 FT | $16.50 | $20.00 | $17.00 | $14.00 | $32.00 | $32.17 |
| 611E03300 10" CONDUIT, TYPE C | 33 FT | $40.50 | $65.00 | $55.75 | $25.00 | $56.00 | $46.55 |
| 611E04400 12" CONDUIT, TYPE B | 386 FT | $42.75 | $72.00 | $66.00 | $49.00 | $49.00 | $65.35 |
| 611E04900 12" CONDUIT, TYPE D | 154 FT | $38.00 | $47.00 | $53.50 | $41.00 | $55.00 | $47.11 |
| 611E05900 15" CONDUIT, TYPE B | 460 FT | $52.50 | $82.00 | $85.00 | $53.00 | $60.00 | $65.53 |
| 611E06400 15" CONDUIT, TYPE D | 138 FT | $44.00 | $67.00 | $57.50 | $42.00 | $72.00 | $51.94 |
| 611E07600 18" CONDUIT, TYPE C | 47 FT | $57.25 | $78.00 | $93.00 | $88.00 | $106 | $67.09 |
| 611E09400 21" CONDUIT, TYPE D | 43 FT | $82.75 | $86.00 | $95.00 | $80.00 | $107 | $84.84 |
| 611E13900 30" CONDUIT, TYPE D | 63 FT | $112 | $133 | $120 | $135 | $180 | $96.19 |
| 611E98150 CATCH BASIN, NO. 3 | 4 EACH | $3,000 | $3,575 | $3,770 | $3,900 | $4,900 | $3,623 |
| 611E98370 CATCH BASIN, NO. 6 | 1 EACH | $2,250 | $2,950 | $2,866 | $2,600 | $3,800 | $10,445 |
| 611E98450 CATCH BASIN, NO. 2-2A | 2 EACH | $2,000 | $1,725 | $2,302 | $2,200 | $3,500 | $1,986 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $2,000 | $1,650 | $2,435 | $2,200 | $3,500 | $1,986 |
| 611E98510 CATCH BASIN, NO. 2-3 | 2 EACH | $2,150 | $2,750 | $2,578 | $2,500 | $3,700 | $2,101 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $350 | $260 | $297 | $350 | $541 | $570 |
| 407E20000 NON-TRACKING TACK COAT | 758 GAL | $3.25 | $3.25 | $3.25 | $3.25 | $3.25 | $3.54 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $325 | $395 | $395 | $395 | $395 | $431 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 241 SY | $60.00 | $74.00 | $56.00 | $62.00 | $69.60 | $90.77 |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 124 FT | $25.00 | $50.00 | $70.00 | $25.00 | $32.15 | $47.56 |
| 609E26000 CURB, TYPE 6 | 157 FT | $23.00 | $49.00 | $55.00 | $23.00 | $57.99 | $44.50 |
| 609E28001 CURB, TYPE 7, AS PER PLAN | 183 FT | $23.00 | $25.00 | $48.00 | $23.00 | $56.09 | $44.55 |
| 609E31000 COMBINATION CURB AND GUTTER, TYPE 9 | 296 FT | $23.00 | $34.00 | $46.75 | $23.00 | $31.15 | $37.69 |
| 638E11100 METER AND CHAMBER REMOVED AND RESET | 1 EACH | $1,500 | $1,500 | $3,200 | $1,500 | $3,300 | $22.73 |
| 638E07801 6" GATE VALVE AND VALVE BOX, AS PER PLAN | 2 EACH | $1,600 | $1,300 | $1,025 | $1,500 | $4,300 | $2,098 |
| 625E00450 CONNECTION, FUSED PULL APART | 22 EACH | $82.19 | $82.00 | $82.19 | $297 | $82.19 | $324 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 23 EACH | $125 | $125 | $125 | $74.46 | $125 | $81.17 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 11 EACH | $1,100 | $1,100 | $1,100 | $1,505 | $1,100 | $1,641 |
| 625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE | 648 FT | $2.35 | $2.35 | $2.35 | $2.39 | $2.35 | $2.60 |
| 625E23410 NO. 12 AWG POLE AND BRACKET CABLE | 1,584 FT | $1.25 | $1.25 | $1.25 | $1.15 | $1.25 | $1.25 |
| 625E24324 1-1/2" DUCT CABLE WITH THREE NO. 6 AWG 2400 VOLT C | 873 FT | $10.00 | $10.00 | $10.00 | $11.34 | $10.00 | $12.36 |
| 625E25500 CONDUIT, 3", 725.04 | 186 FT | $38.00 | $38.00 | $38.00 | $39.67 | $38.00 | $43.24 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 11 EACH | $375 | $375 | $375 | $520 | $375 | $567 |
| 625E29002 TRENCH, 24" DEEP | 944 FT | $7.50 | $7.50 | $7.50 | $13.28 | $7.50 | $14.48 |
| 625E30700 PULL BOX, 725.08, 18" | 3 EACH | $1,080 | $1,080 | $1,080 | $1,042 | $1,080 | $1,136 |
| 625E32000 GROUND ROD | 11 EACH | $260 | $260 | $260 | $371 | $260 | $405 |
| 625E34000 POWER SERVICE | 1 EACH | $8,000 | $8,000 | $8,000 | $6,798 | $8,000 | $7,410 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 944 FT | $0.90 | $0.90 | $0.90 | $0.29 | $5.00 | $0.32 |
| 625E10490 LIGHT POLE, CONVENTIONAL, DESIGN A8B30 | 11 EACH | $1,800 | $1,800 | $1,800 | $1,934 | $1,800 | $2,108 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 16 EACH | $7.75 | $20.00 | $14.50 | $30.00 | $7.00 | $16.19 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 40 FT | $12.00 | $12.00 | $12.00 | $15.00 | $12.00 | $12.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 994.5 FT | $13.20 | $13.20 | $13.20 | $12.50 | $13.20 | $14.17 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST, TYPE S (SQUARE | 70 FT | $15.70 | $15.70 | $15.70 | $16.50 | $15.70 | $17.44 |
| 630E08600 SIGN POST REFLECTOR | 8 EACH | $45.00 | $45.00 | $45.00 | $50.00 | $45.00 | $49.00 |
| 630E80100 SIGN, FLAT SHEET | 597.1 SF | $16.00 | $16.00 | $16.00 | $20.00 | $16.00 | $30.52 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 51 EACH | $10.00 | $10.00 | $10.00 | $20.00 | $10.00 | $27.25 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $65.00 | $65.00 | $65.00 | $75.00 | $65.00 | $81.67 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 40 EACH | $15.00 | $15.00 | $15.00 | $20.00 | $15.00 | $38.15 |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 22 FT | $25.00 | $25.00 | $20.00 | $25.00 | $25.00 | $21.82 |
| 644E00104 EDGE LINE, 6" | 0.6 MILE | $6,195 | $6,195 | $2,300 | $6,195 | $6,195 | $2,507 |
| 644E00300 CENTER LINE | 0.38 MILE | $9,969 | $9,969 | $5,200 | $9,969 | $9,969 | $5,668 |
| 644E00600 CROSSWALK LINE | 320 FT | $4.40 | $4.40 | $2.60 | $4.40 | $4.40 | $2.83 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 257 FT | $6.90 | $6.90 | $4.00 | $6.90 | $6.90 | $4.36 |
| 644E01410 WORD ON PAVEMENT, 96" | 4 EACH | $160 | $160 | $200 | $160 | $160 | $218 |
| 644E01514 DOTTED LINE, 8" | 146 FT | $3.00 | $3.00 | $1.60 | $3.00 | $3.00 | $1.75 |
| 644E20800 YIELD LINE | 64 FT | $10.50 | $10.50 | $4.00 | $10.50 | $10.50 | $4.36 |
| 661E50100 EVERGREEN TREE, 5' HEIGHT (CUPROCYPARIS LEYLANDII | 13 EACH | $789 | $700 | $700 | $700 | $350 | $763 |
| 662E31000 LANDSCAPE WATERING | 195 GAL | $1.75 | $10.00 | $10.00 | $10.00 | $10.00 | $10.90 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5" DEPTH) | 1,134 SY | $14.25 | $14.25 | $14.25 | $14.25 | $14.25 | $15.53 |
| 407E20000 NON-TRACKING TACK COAT | 96 GAL | $3.25 | $3.25 | $3.25 | $3.50 | $3.25 | $3.54 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 160 CY | $58.00 | $75.00 | $89.00 | $35.00 | $68.50 | $67.26 |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 47 CY | $275 | $275 | $275 | $120 | $275 | $300 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $70.00 | $90.00 | $65.00 | $70.00 | $85.00 | $70.85 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 180 CY | $175 | $240 | $120 | $120 | $255 | $463 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $1,600 | $1,200 | $970 | $1,600 | $1,600 | $2,224 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.08 MILE | $15,205 | $15,205 | $15,205 | $15,205 | $15,205 | $16,575 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.18 MILE | $10,895 | $10,895 | $10,895 | $10,895 | $10,895 | $11,878 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.2 MILE | $6,150 | $6,150 | $6,150 | $6,150 | $6,150 | $6,705 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 0.21 MILE | $6,800 | $6,800 | $6,800 | $6,800 | $6,800 | $7,414 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 35 FT | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 | $10.91 |
| 616E10000 WATER | 54 MGAL | $1.00 | $80.00 | $20.00 | $1.17 | $1.00 | $57.87 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,000 | $16,000 | $10,000 | $15,000 | $19,600 | $36,721 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,575 | $2,800 | $2,950 | $2,000 | $1,200 | $1,852 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $25,000 | $20,000 | $25,000 | $30,000 | $46,600 | $36,256 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,287 CY | $140 | $180k | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $150,000 | $150k | 8% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 2,888 CY | $50 | $144k | 7% |
| 203E20000 EMBANKMENT | 5,767 CY | $20.75 | $120k | 6% |
| 304E20000 AGGREGATE BASE | 1,786 CY | $54.75 | $98k | 5% |
| 204E13000 EXCAVATION OF SUBGRADE | 2,888 CY | $25 | $72k | 4% |
| 203E10000 EXCAVATION | 3,538 CY | $17.5 | $62k | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (335 CY | $170 | $57k | 3% |
| 638E98600 WATER WORK, MISC.: 6" WATER MAIN, HDPE PIPE AND FI | 445 FT | $115 | $51k | 3% |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 700 SY | $69.3 | $49k | 2% |