D08-ITS Maint FY2021
D08 County · est $1.0M
Bid dateThursday, May 13—
D08 County · est $1.0M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 26 more items below.
| Item | Quantity | R1Bansal Construction INC | R2Complete General Construction Company | % of bid |
|---|---|---|---|---|
| 632E70001 POWER SERVICE, AS PER PLANE | 47 EACH | $4,600 | $4,250 | 24% |
| 804E98000 FIBER OPTIC CABLE, MISC.:, INSTALL ONLY WITH TRACE | 100,000 FT | $1.35 | $3.40 | 15% |
| 625E98000 LIGHTING, MISC.:STEP-DOWN TRANSFORMER AND SUPPORT | 13 EACH | $6,225 | $10,000 | 9% |
| 625E22900 NO. 1/0 AWG 2400 VOLT DISTRIBUTION CABLE | 10,000 FT | $5.75 | $6.00 | 6% |
| 809E61000 CCTV CONCRETE POLE WITH LOWERING UNIT, 70 FEET | 1 EACH | $56,650 | $50,550 | 6% |
| 625E30711 PULL BOX, 725.08, 32", AS PER PLAN | 30 EACH | $1,750 | $3,100 | 6% |
| 632E70001 POWER SERVICE, AS PER PLANA | 10 EACH | $4,625 | $5,300 | 5% |
| 625E31507 |
| Item | Quantity | R1Bansal Construction INC | R2Complete General Construction Company |
|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,500 | $10,000 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 |
| 625E00470 CONNECTION, UNFUSED BOLTED | 5 EACH | $90.00 | $135 |
| 625E25408 CONDUIT, 2", 725.051 | 200 FT | $4.50 | $10.00 |
| 625E25740 CONDUIT, MULTICELL, 725.20, JACKED OR DRILLED | 50 FT | $100 | $55.00 |
| 625E25908 CONDUIT, JACKED OR DRILLED, 725.052, 2", SCHEDULE | 50 FT | $80.00 | $45.00 |
| 625E29010 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 5 EACH |
| $7,450 |
| $4,350 |
| 4% |
| 625E23100 NO. 2 AWG 600 VOLT DISTRIBUTION CABLE | 10,000 FT | $3.50 | $4.75 | 4% |
| 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE | 10,000 FT | $2.75 | $3.50 | 3% |
| 625E30700 PULL BOX, 725.08, 18" | 35 EACH | $785 | $1,600 | 3% |
| 625E25740 CONDUIT, MULTICELL, 725.20, HDPE | 500 FT | $50.00 | $32.00 | 3% |
| 625E22990 NO. 6 AWG 600 VOLT DISTRIBUTION CABLE | 10,000 FT | $2.25 | $3.00 | 2% |
| 632E90900 SIGNALIZATION, MISC.:, CLEARING OF ITS SITES | 5 DAY | $4,000 | $925 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | 2% |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 10 EACH | $1,575 | $2,900 | 2% |
| 625E32001 GROUND ROD, AS PER PLAN | 35 EACH | $260 | $275 | 1% |
| 625E25930 CONDUIT, MISC.:, CONDUIT REPAIR | 5 EACH | $1,750 | $3,500 | 1% |
| 632E70001 POWER SERVICE, AS PER PLANF | 1 EACH | $8,600 | $6,980 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,422 | $7,500 | 1% |
| 700 FT |
| $10.00 |
| $14.00 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 700 FT | $0.40 | $2.00 |
| 632E64020 PEDESTAL FOUNDATION | 1 EACH | $1,100 | $1,850 |
| 632E70001 POWER SERVICE, AS PER PLANB | 1 EACH | $5,460 | $5,600 |
| 632E70001 POWER SERVICE, AS PER PLANC | 1 EACH | $6,350 | $7,000 |
| 632E70001 POWER SERVICE, AS PER PLAND | 1 EACH | $7,175 | $8,000 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 1 EACH | $1,150 | $1,090 |
| 632E89300 WOOD POLE | 1 EACH | $1,750 | $1,500 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 1 EACH | $1,325 | $3,600 |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 16 FT | $63.00 | $98.00 |
| 644E00500 STOP LINE | 16 FT | $62.00 | $122 |
| 804E98000 FIBER OPTIC CABLE, MISC.:INSTALL ONLY | 5,000 FT | $1.35 | $3.50 |
| 809E65990 ITS DEVICE, MISC.:PULL BOX, 48", AS PER PLAN | 1 EACH | $3,425 | $4,000 |
| 809E65990 ITS DEVICE, MISC.:REMOVE EXISTING CCTV POLE | 1 EACH | $4,150 | $2,750 |
| 625E30733 PULL BOX, 725.08, 48", TYPE 2, AS PER PLAN | 2 EACH | $3,425 | $4,000 |
| 804E98100 FIBER OPTIC CABLE, MISC.:, FIBER OPTIC CABLE MARKE | 10 EACH | $500 | $225 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $75.00 | $75.00 |
| 614E18000 MAINTAINING TRAFFIC, MISC.:PARTIAL ENTRANCE RAMP L | 1 EACH | $1,800 | $2,865 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $10,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $7,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 632E70001 POWER SERVICE, AS PER PLANE | 47 EACH | $4,600 | $216k | 22% |
| 804E98000 FIBER OPTIC CABLE, MISC.:, INSTALL ONLY WITH TRACE | 100,000 FT | $1.35 | $135k | 14% |
| 625E98000 LIGHTING, MISC.:STEP-DOWN TRANSFORMER AND SUPPORT | 13 EACH | $6,225 | $81k | 8% |
| 625E22900 NO. 1/0 AWG 2400 VOLT DISTRIBUTION CABLE | 10,000 FT | $5.75 | $58k | 6% |
| 809E61000 CCTV CONCRETE POLE WITH LOWERING UNIT, 70 FEET | 1 EACH | $56,650 | $57k | 6% |
| 625E30711 PULL BOX, 725.08, 32", AS PER PLAN | 30 EACH | $1,750 | $53k | 5% |
| 632E70001 POWER SERVICE, AS PER PLANA | 10 EACH | $4,625 | $46k | 5% |
| 625E31507 PULL BOX REMOVED AND REPLACED, AS PER PLAN | 5 EACH | $7,450 | $37k | 4% |
| 625E23100 NO. 2 AWG 600 VOLT DISTRIBUTION CABLE | 10,000 FT | $3.5 | $35k | 4% |
| 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE | 10,000 FT | $2.75 | $28k | 3% |