HUR-US 20-17.82
HUR County · est $1.6M
Bid dateThursday, July 1—
HUR County · est $1.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 115 more items below.
| Item | Quantity | R1Mark Schaffer Excavating & Trucking | R2INC Vernon Nagel INC | R3Great Lakes Demolition Company | % of bid |
|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,036 CY | $175 | $148 | $190 | 16% |
| 203E10000 EXCAVATION | 4,029 CY | $30.00 | $25.00 | $25.00 | 11% |
| 304E20000 AGGREGATE BASE | 1,474 CY | $65.00 | $75.00 | $60.00 | 9% |
| 202E23000 PAVEMENT REMOVED | 5,642 SY | $15.00 | $18.00 | $10.00 | 8% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 350 CY | $225 |
| Item | Quantity | R1Mark Schaffer Excavating & Trucking | R2INC Vernon Nagel INC | R3Great Lakes Demolition Company |
|---|---|---|---|---|
| 202E30000 WALK REMOVED | 92 SF | $1.00 | $3.00 | $5.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 1,287 FT | $8.00 | $10.00 | $15.00 |
| 202E38000 GUARDRAIL REMOVED | 774.5 FT | $2.00 | $2.00 | $3.00 |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 12.5 FT | $3.00 | $4.00 | $2.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 1 EACH | $150 | $250 | $400 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $225 |
| $240 |
| 7% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (344 CY | $200 | $188 | $195 | 6% |
| 609E58001 9" CONCRETE TRAFFIC ISLAND, AS PER PLAN | 570 SY | $100 | $84.72 | $115 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $50,000 | $12,000 | $22,500 | 4% |
| 451E14011 9" REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, AS P | 462 SY | $100 | $90.00 | $125 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $85,000 | 4% |
| 203E20000 EMBANKMENT | 3,928 CY | $10.00 | $22.00 | $20.00 | 3% |
| 605E06000 4" BASE PIPE UNDERDRAINS | 3,138 FT | $12.00 | $18.00 | $10.00 | 3% |
| 832E30000 EROSION CONTROL | 37,011 EACH | $1.00 | $1.00 | $1.00 | 3% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 458 CY | $75.00 | $70.00 | $40.00 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $30,000 | $20,000 | $10,000 | 3% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 1,196 FT | $25.00 | $25.00 | $16.50 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $25,000 | $1,500 | $15,000 | 2% |
| 206E10500 CEMENT | 144 TON | $170 | $170 | $180 | 2% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT10B32.5 | 9 EACH | $2,500 | $3,000 | $1,870 | 2% |
| 611E98150 CATCH BASIN, NO. 3 | 6 EACH | $3,500 | $5,000 | $1,480 | 2% |
| 202E53100 MAILBOX REMOVED |
| 5 EACH |
| $15.00 |
| $10.00 |
| $120 |
| 202E58100 CATCH BASIN REMOVED | 7 EACH | $250 | $225 | $400 |
| 203E10001 EXCAVATION, AS PER PLAN | 189 CY | $30.00 | $25.00 | $25.00 |
| 204E10000 SUBGRADE COMPACTION | 975 SY | $0.80 | $1.00 | $2.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 458 CY | $28.00 | $25.00 | $30.00 |
| 204E45000 PROOF ROLLING | 4 HOUR | $150 | $200 | $280 |
| 204E50000 GEOTEXTILE FABRIC | 1,374 SY | $2.00 | $1.50 | $8.00 |
| 206E11000 CURING COAT | 5,565 SY | $1.00 | $0.92 | $2.00 |
| 206E15010 CEMENT STABILIZED SUBGRADE, 12 INCHES DEEP | 5,565 SY | $3.75 | $7.00 | $5.00 |
| 606E13000 GUARDRAIL, TYPE 5 | 237.5 FT | $22.00 | $24.00 | $30.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 125 FT | $23.00 | $24.00 | $30.00 |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 37.5 FT | $26.00 | $30.00 | $35.00 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 3 EACH | $2,500 | $2,850 | $2,855 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E [MASH 2016] | 1 EACH | $2,750 | $2,850 | $2,855 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 1 EACH | $1,000 | $965 | $970 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,000 | $965 | $970 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 4 EACH | $1,000 | $1,275 | $1,280 |
| 623E38500 MONUMENT ASSEMBLY | 5 EACH | $1,250 | $1,200 | $1,450 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 1 EACH | $1,000 | $490 | $1,250 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 5 EACH | $150 | $145 | $200 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 2 SY | $350 | $125 | $100 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 21 SY | $150 | $125 | $100 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 2 CY | $500 | $100 | $200 |
| 601E45050 BIORETENTION CELL | 204 CY | $50.00 | $125 | $85.00 |
| 602E20000 CONCRETE MASONRY | 0.75 CY | $3,500 | $2,800 | $1,400 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $50.00 | $70.00 | $300 |
| 659E00300 TOPSOIL | 855 CY | $12.00 | $32.00 | $55.00 |
| 659E10000 SEEDING AND MULCHING | 7,707 SY | $1.00 | $1.10 | $3.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 385 SY | $0.30 | $1.10 | $2.00 |
| 659E15000 INTER-SEEDING | 385 SY | $0.20 | $1.00 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 1.08 TON | $400 | $610 | $450 |
| 659E31000 LIME | 1.59 ACRE | $5.00 | $30.00 | $800 |
| 659E35000 WATER | 43 MGAL | $1.00 | $1.00 | $5.00 |
| 659E40000 MOWING | 17 MSF | $10.00 | $5.00 | $400 |
| 670E00500 SLOPE EROSION PROTECTION | 593 SY | $2.25 | $2.00 | $10.00 |
| 671E15000 EROSION CONTROL MAT, TYPE A | 145 SY | $2.00 | $2.00 | $12.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,500 | $1,500 | $2,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $1,500 | $1,000 | $2,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $10,000 | $11,000 | $14,000 |
| 605E13301 6" UNCLASSIFIED PIPE UNDERDRAINS, AS PER PLAN | 100 FT | $15.00 | $24.00 | $15.00 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 230 FT | $25.00 | $40.00 | $10.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 86 FT | $27.00 | $35.00 | $15.00 |
| 611E04400 12" CONDUIT, TYPE B | 379 FT | $45.00 | $80.00 | $70.00 |
| 611E04600 12" CONDUIT, TYPE C | 473 FT | $40.00 | $65.00 | $65.00 |
| 611E06100 15" CONDUIT, TYPE C | 71 FT | $50.00 | $65.00 | $75.00 |
| 611E07400 18" CONDUIT, TYPE B | 71 FT | $75.00 | $125 | $90.00 |
| 611E07600 18" CONDUIT, TYPE C | 324 FT | $55.00 | $95.00 | $85.00 |
| 611E98180 CATCH BASIN, NO. 3A | 3 EACH | $2,500 | $4,000 | $1,480 |
| 611E98470 CATCH BASIN, NO. 2-2B | 4 EACH | $2,000 | $2,000 | $950 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 2 EACH | $1,000 | $500 | $800 |
| 611E99574 MANHOLE, NO. 3 | 2 EACH | $3,000 | $5,000 | $2,400 |
| 611E99574 MANHOLE, NO. 3 W/ECCENTRIC CONE TOP | 1 EACH | $3,000 | $5,000 | $2,500 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $350 | $502 | $800 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.25" DEPTH) | 2,487 SY | $2.50 | $2.00 | $10.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (DEPTH VARIES 3 | 1,667 SY | $3.50 | $3.00 | $12.00 |
| 254E01600 PATCHING PLANED SURFACE | 167 SY | $10.00 | $10.00 | $25.00 |
| 407E10000 TACK COAT | 1,158 GAL | $1.05 | $2.00 | $5.00 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 2 SY | $250 | $90.00 | $200 |
| 609E14000 CURB, TYPE 2-A | 280 FT | $11.50 | $10.00 | $6.00 |
| 609E18001 COMBINATION CURB AND GUTTER, TYPE 3, AS PER PLAN | 358 FT | $19.00 | $20.00 | $12.00 |
| 609E26000 CURB, TYPE 6 | 502 FT | $18.00 | $20.00 | $12.00 |
| 690E12060 SPECIAL - PAVEMENT OVERLAY FABRIC COMPOSITE | 395 SY | $30.00 | $29.45 | $33.00 |
| 625E00450 CONNECTION, FUSED PULL APART | 18 EACH | $105 | $100 | $150 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 39 EACH | $65.00 | $60.00 | $150 |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 9 EACH | $1,800 | $2,000 | $1,520 |
| 625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE | 525 FT | $3.00 | $2.80 | $3.25 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 765 FT | $1.25 | $1.20 | $2.25 |
| 625E24324 1-1/2" DUCT CABLE WITH THREE NO. 6 AWG 2400 VOLT C | 1,384 FT | $7.00 | $6.85 | $9.65 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 232 FT | $60.00 | $57.00 | $51.00 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 9 EACH | $400 | $375 | $520 |
| 625E29002 TRENCH, 24" DEEP | 1,190 FT | $7.50 | $7.00 | $8.25 |
| 625E30700 PULL BOX, 725.08, 18" | 8 EACH | $850 | $800 | $795 |
| 625E30706 PULL BOX, 725.08, 24" | 4 EACH | $1,050 | $1,024 | $1,000 |
| 625E32000 GROUND ROD | 10 EACH | $275 | $265 | $215 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $7,000 | $6,840 | $7,000 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 1,422 FT | $0.30 | $0.30 | $0.55 |
| 620E60000 DELINEATOR, POST SURFACE MOUNTED | 34 EACH | $55.00 | $48.00 | $51.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 442 FT | $10.00 | $8.95 | $10.00 |
| 630E08600 SIGN POST REFLECTOR | 25 EACH | $32.00 | $30.00 | $35.00 |
| 630E80100 SIGN, FLAT SHEET | 327 SF | $18.00 | $16.85 | $18.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 38 EACH | $27.00 | $25.00 | $30.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 9 EACH | $50.00 | $45.00 | $50.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 32 EACH | $27.00 | $25.00 | $28.00 |
| 644E00104 EDGE LINE, 6" | 1.07 MILE | $3,000 | $3,150 | $3,250 |
| 644E00300 CENTER LINE 4" | 0.56 MILE | $6,500 | $4,500 | $4,750 |
| 644E00500 STOP LINE 24" | 16 FT | $8.00 | $9.00 | $12.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE 24" (YELLOW) | 422 FT | $7.00 | $7.00 | $10.00 |
| 644E01300 LANE ARROW | 4 EACH | $100 | $80.00 | $85.00 |
| 644E01510 DOTTED LINE, 6" (WHITE) | 109 FT | $2.60 | $2.50 | $3.25 |
| 644E20800 YIELD LINE | 70 FT | $4.00 | $20.00 | $22.00 |
| 646E50100 REMOVAL OF PAVEMENT MARKING | 21 FT | $20.00 | $100 | $110 |
| 659E98000 SEEDING, MISC.: NO-MOW FINE FESCUE SEED MIX | 618 SY | $3.00 | $2.80 | $4.00 |
| 661E40120 DECIDUOUS TREE, 3" CALIPER, TILIA CORDATA 'GREENSP | 3 EACH | $850 | $780 | $600 |
| 661E50170 EVERGREEN TREE, 10' HEIGHT, PICEA OMORIKA 'BRUNS' | 3 EACH | $1,000 | $900 | $950 |
| 662E31000 LANDSCAPE WATERING | 150 GAL | $2.00 | $5.00 | $10.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $10,000 | $8,000 | $10,000 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $950 | $900 | $2,000 |
| 616E10000 WATER | 32 MGAL | $1.00 | $51.01 | $10.00 |
| 202E23500 WEARING COURSE REMOVED | 491 SY | $3.00 | $12.00 | $10.00 |
| 202E38602 BRIDGE RAILING REMOVED FOR REUSE | 153 FT | $2.70 | $2.60 | $31.00 |
| 202E98200 REMOVAL MISC.: POLYMER MODIFIED ASPHALT EXPANSION | 102 FT | $5.00 | $12.55 | $15.00 |
| 407E10000 TACK COAT | 69 GAL | $1.05 | $2.00 | $5.00 |
| 441E10100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 41 CY | $325 | $280 | $325 |
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (27 CY | $225 | $280 | $280 |
| 512E33010 TYPE 3 WATERPROOFING | 364 SY | $40.00 | $40.00 | $35.00 |
| 512E74001 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 364 SY | $11.00 | $15.00 | $20.00 |
| 517E75501 BRIDGE RAILING REBUILT, AS PER PLAN | 153 FT | $12.00 | $15.00 | $35.00 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 49 CF | $425 | $600 | $150 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $20,000 | $25,000 |
| 619E16010 FIELD OFFICE, TYPE B | 11 MNTH | $1,000 | $2,500 | $800 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,036 CY | $175 | $181k | 11% |
| 203E10000 EXCAVATION | 4,029 CY | $30 | $121k | 7% |
| 304E20000 AGGREGATE BASE | 1,474 CY | $65 | $96k | 6% |
| 202E23000 PAVEMENT REMOVED | 5,642 SY | $15 | $85k | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 350 CY | $225 | $79k | 5% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (344 CY | $200 | $69k | 4% |
| 609E58001 9" CONCRETE TRAFFIC ISLAND, AS PER PLAN | 570 SY | $100 | $57k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $50,000 | $50k | 3% |
| 451E14011 9" REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, AS P | 462 SY | $100 | $46k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 2% |