LAW-SR 7-02.00 Lighting Project
LAW County · est $0.4M
Bid dateThursday, August 26—
LAW County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 35 more items below.
| Item | Quantity | R1Perram Electric INC | R2Complete General Construction Company | R3Miller Cable Company | % of bid |
|---|---|---|---|---|---|
| 809E61000 CCTV CONCRETE POLE WITH LOWERING UNIT, 70 FEET | 1 EACH | $48,520 | $47,000 | $53,500 | 13% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT20B36 | 19 EACH | $2,245 | $3,000 | $3,015 | 12% |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 19 EACH | $2,201 | $1,000 | $1,975 | 12% |
| 625E29002 TRENCH, 24" DEEP | 4,565 FT | $9.00 | $9.00 | $10.70 | 11% |
| 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE | 18,125 FT | $2.14 |
| Item | Quantity | R1Perram Electric INC | R2Complete General Construction Company | R3Miller Cable Company |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,650 | $2,200 | $5,500 |
| 659E00300 TOPSOIL | 338 CY | $10.00 | $30.00 | $47.00 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 3,040 SY | $1.60 | $2.75 | $3.45 |
| 659E14000 REPAIR SEEDING AND MULCHING | 152 SY | $1.00 | $3.35 | $1.25 |
| 659E20000 COMMERCIAL FERTILIZER | 0.4 TON | $620 | $650 | $475 |
| 659E31000 LIME |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1.90 |
| $2.70 |
| 11% |
| 625E25408 CONDUIT, 2", 725.051 | 4,670 FT | $5.99 | $9.00 | $11.00 | 8% |
| 625E25900 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 172 FT | $80.80 | $75.00 | $85.00 | 4% |
| 625E23100 NO. 2 AWG 600 VOLT DISTRIBUTION CABLE | 3,759 FT | $3.08 | $3.75 | $3.35 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10,000 | $20,000 | 3% |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $9,720 | $12,500 | $8,900 | 3% |
| 625E25908 CONDUIT, JACKED OR DRILLED, 725.052 2" | 366 FT | $25.87 | $40.00 | $28.00 | 3% |
| 809E65000 ITS CABINET - GROUND MOUNTED | 1 EACH | $9,110 | $10,000 | $11,000 | 3% |
| 625E75522 LUMINAIRE SUPPORT FOUNDATION REMOVED | 21 EACH | $413 | $350 | $250 | 2% |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $7,885 | $2,100 | $8,700 | 2% |
| 625E30700 PULL BOX, 725.08, 18" | 7 EACH | $1,105 | $1,200 | $1,050 | 2% |
| 625E75521 LUMINAIRE SUPPORT REMOVED, AS PER PLAN | 22 EACH | $330 | $200 | $250 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,876 | $3,000 | $3,445 | 2% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $6,600 | $3,000 | $1,500 | 2% |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 1 EACH | $6,290 | $6,000 | $2,100 | 2% |
| 625E98000 LIGHTING, MISC.:, STEP-DOWN TRANSFORMER AND SUPPOR | 1 EACH | $5,820 | $2,000 | $10,500 | 2% |
| 0.62 ACRE |
| $128 |
| $70.00 |
| $40.00 |
| 659E35000 WATER | 20 MGAL | $6.85 | $5.00 | $1.00 |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 583 SY | $1.40 | $2.75 | $2.95 |
| 659E20000 COMMERCIAL FERTILIZER | 0.13 TON | $615 | $650 | $495 |
| 659E35000 WATER | 3 MGAL | $7.00 | $5.00 | $1.00 |
| 625E00450 CONNECTION, FUSED PULL APART | 20 EACH | $120 | $110 | $100 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 40 EACH | $113 | $115 | $100 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 3 EACH | $118 | $130 | $100 |
| 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN, 'AT20B33 | 1 EACH | $3,010 | $2,800 | $2,515 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 4,200 FT | $1.02 | $1.50 | $1.10 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 9 EACH | $475 | $450 | $450 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 11 EACH | $475 | $450 | $450 |
| 625E30700 PULL BOX, 725.08, 18" | 3 EACH | $1,095 | $1,200 | $1,050 |
| 625E31510 PULL BOX REMOVED | 1 EACH | $85.00 | $200 | $240 |
| 625E31600 PULL BOX, MISC.: MODIFY EXISTING PULL BOX | 3 EACH | $85.00 | $325 | $400 |
| 625E32000 GROUND ROD | 21 EACH | $265 | $260 | $265 |
| 625E75505 LUMINAIRE REMOVED FOR STORAGE, AS PER PLAN | 22 EACH | $45.00 | $40.00 | $40.00 |
| 625E75511 POWER SERVICE REMOVED, AS PER PLAN | 1 EACH | $330 | $850 | $250 |
| 625E75551 DISTRIBUTION CABLE REMOVED, AS PER PLAN | 6,602 FT | $0.32 | $0.75 | $1.00 |
| 625E98100 LIGHTING, MISC.:LIGHTING, MISC.: UNDERGROUND WARNI | 4,565 FT | $0.07 | $1.50 | $0.50 |
| 625E25408 CONDUIT, 2", 725.051 | 757 FT | $6.77 | $11.00 | $11.00 |
| 625E29010 TRENCH, 30" DEEP | 757 FT | $7.67 | $10.00 | $18.00 |
| 625E30710 PULL BOX, 725.08, 32" | 1 EACH | $1,880 | $2,450 | $3,350 |
| 625E32001 GROUND ROD, AS PER PLAN | 10 EACH | $265 | $260 | $265 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 75 FT | $0.07 | $1.50 | $0.50 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 1 EACH | $1,850 | $5,000 | $2,850 |
| 809E60000 CCTV IP-CAMERA SYSTEM, DOME-TYPE | 1 EACH | $4,710 | $10,000 | $8,100 |
| 614E11111 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $35.00 | $81.00 | $80.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $500 | $2,000 | $2,600 |
| 614E11000 MAINTAINING TRAFFIC(PART 2) | 1 LS | $3,500 | $4,500 | $1,200 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 809E61000 CCTV CONCRETE POLE WITH LOWERING UNIT, 70 FEET | 1 EACH | $48,520 | $49k | 11% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT20B36 | 19 EACH | $2,245 | $43k | 10% |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 19 EACH | $2,201 | $42k | 10% |
| 625E29002 TRENCH, 24" DEEP | 4,565 FT | $9 | $41k | 9% |
| 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE | 18,125 FT | $2.14 | $39k | 9% |
| 625E25408 CONDUIT, 2", 725.051 | 4,670 FT | $5.99 | $28k | 6% |
| 625E25900 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 172 FT | $80.8 | $14k | 3% |
| 625E23100 NO. 2 AWG 600 VOLT DISTRIBUTION CABLE | 3,759 FT | $3.08 | $12k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 2% |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $9,720 | $10k | 2% |