VAN-US 127/US 224-12.04/15.68 (PART 1 AND PART 2)
VAN County · est $2.8M
Bid dateThursday, October 14—
VAN County · est $2.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 176 more items below.
| Item | Quantity | R1Vernon Nagel INC | R2Miller Bros Const INC | R3Eagle Bridge CO | % of bid |
|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,292 CY | $155 | $155 | $155 | 19% |
| 304E20000 AGGREGATE BASE | 3,043 CY | $52.00 | $46.00 | $55.00 | 8% |
| 203E10000 EXCAVATION | 7,204 CY | $18.00 | $20.00 | $22.00 | 7% |
| 452E19200 NON-REINFORCED CONCRETE PAVEMENT, MISC.:" CONCRETE | 1,579 SY | $79.77 | $86.00 | $80.00 | 7% |
| 515E12031 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 11 EACH | $11,200 | $8,800 |
| Item | Quantity | R1Vernon Nagel INC | R2Miller Bros Const INC | R3Eagle Bridge CO |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,500 | $50,000 | $7,500 |
| 202E20010 HEADWALL REMOVED | 6 EACH | $250 | $100 | $200 |
| 202E30200 STEPS REMOVED | 8 FT | $20.00 | $65.00 | $90.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 2,179 FT | $12.00 | $20.00 | $15.00 |
| 202E58100 CATCH BASIN REMOVED | 8 EACH | $250 | $300 | $200 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT 10 to 12" | 8 FT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $12,000 |
| 6% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 589 CY | $200 | $200 | $200 | 6% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (601 CY | $175 | $175 | $175 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $100,000 | 5% |
| 206E10300 LIME | 476 TON | $178 | $165 | $175 | 4% |
| 611E16600 36" CONDUIT, TYPE C | 534 FT | $150 | $185 | $175 | 4% |
| 206E10020 LIME STABILIZED SUBGRADE, 14 INCHES DEEP | 15,740 SY | $4.60 | $7.90 | $6.00 | 4% |
| 832E30000 EROSION CONTROL | 70,000 EACH | $1.00 | $1.00 | $1.00 | 4% |
| 605E06000 4" BASE PIPE UNDERDRAINS | 6,164 FT | $10.00 | $5.00 | $11.00 | 3% |
| 659E00300 TOPSOIL | 3,057 CY | $20.00 | $20.00 | $10.00 | 3% |
| 526E15001 REINFORCED CONCRETE APPROACH SLABS (T=13"), AS PER | 196 SY | $275 | $325 | $350 | 3% |
| 611E10600 24" CONDUIT, TYPE C | 580 FT | $88.00 | $100 | $100 | 3% |
| 511E31611 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN | 30 CY | $1,600 | $1,500 | $2,500 | 3% |
| 611E07600 18" CONDUIT, TYPE C | 735 FT | $59.41 | $95.00 | $70.00 | 2% |
| 609E31001 COMBINATION CURB AND GUTTER, TYPE 9, AS PER PLAN-A | 1,995 FT | $20.00 | $15.00 | $18.00 | 2% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 1,814 FT | $20.00 | $18.00 | $20.00 | 2% |
| $16.00 |
| $120 |
| $150 |
| 202E98100 REMOVAL MISC.:BRICK PILLAR | 2 EACH | $200 | $500 | $500 |
| 203E20000 EMBANKMENT | 1,064 CY | $18.00 | $12.00 | $22.00 |
| 609E26000 CURB, TYPE 6 | 229 FT | $18.00 | $14.00 | $15.00 |
| 609E31001 COMBINATION CURB AND GUTTER, TYPE 9, AS PER PLAN-B | 433 FT | $30.00 | $25.00 | $28.00 |
| 609E71000 CONCRETE MEDIAN | 332 SF | $12.00 | $12.50 | $12.00 |
| 623E38500 MONUMENT ASSEMBLY | 5 EACH | $750 | $850 | $1,500 |
| 623E40500 REFERENCE MONUMENT | 2 EACH | $350 | $830 | $350 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 2 EACH | $475 | $800 | $350 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 16 EACH | $135 | $135 | $200 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 16 EACH | $135 | $155 | $155 |
| 659E10000 SEEDING AND MULCHING | 19,278 SY | $0.90 | $0.88 | $1.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 964 SY | $0.90 | $0.88 | $1.50 |
| 659E20000 COMMERCIAL FERTILIZER | 2.6 TON | $600 | $600 | $1,250 |
| 659E31000 LIME | 3.98 ACRE | $35.00 | $35.00 | $10.00 |
| 659E35000 WATER | 52.1 MGAL | $1.00 | $1.00 | $10.00 |
| 670E00500 SLOPE EROSION PROTECTION | 7,432 SY | $1.80 | $1.80 | $3.00 |
| 670E00700 DITCH EROSION PROTECTION | 505 SY | $1.80 | $1.80 | $3.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,000 | $2,000 | $2,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $1,500 | $5,000 | $15,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $10,500 | $10,500 | $6,500 |
| 202E66000 SPECIAL - DRILLED WATER WELL ABANDONED | 1 EACH | $500 | $1,000 | $2,500 |
| 202E67000 REGULATED UNDERGROUND STORAGE TANK REMOVED | 2 EACH | $3,000 | $5,000 | $12,500 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 4 SY | $200 | $85.00 | $150 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 8 CY | $125 | $200 | $150 |
| 602E20000 CONCRETE MASONRY | 1.1 CY | $2,500 | $1,500 | $2,000 |
| 611E00100 4" CONDUIT, TYPE B | 153 FT | $35.00 | $22.00 | $25.00 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 217 FT | $42.00 | $25.00 | $17.00 |
| 611E00900 6" CONDUIT, TYPE B | 50 FT | $25.00 | $38.00 | $8.00 |
| 611E01100 6" CONDUIT, TYPE C | 8 FT | $43.00 | $60.00 | $50.00 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $20.00 | $32.00 | $8.00 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $20.00 | $32.00 | $8.00 |
| 611E02000 8" CONDUIT, TYPE C | 8 FT | $65.00 | $65.00 | $100 |
| 611E04400 12" CONDUIT, TYPE B | 153 FT | $80.00 | $105 | $60.00 |
| 611E04600 12" CONDUIT, TYPE C | 469 FT | $55.00 | $70.00 | $55.00 |
| 611E04900 12" CONDUIT, TYPE D | 196 FT | $55.00 | $75.00 | $55.00 |
| 611E07400 18" CONDUIT, TYPE B | 220 FT | $94.00 | $110 | $70.00 |
| 611E10400 24" CONDUIT, TYPE B | 91 FT | $170 | $210 | $175 |
| 611E13400 30" CONDUIT, TYPE B | 107 FT | $200 | $220 | $225 |
| 611E13600 30" CONDUIT, TYPE C | 100 FT | $125 | $190 | $150 |
| 611E98150 CATCH BASIN, NO. 3 | 6 EACH | $4,400 | $3,600 | $4,000 |
| 611E98180 CATCH BASIN, NO. 3A | 4 EACH | $4,000 | $2,600 | $3,500 |
| 611E98410 CATCH BASIN, NO. 8 | 3 EACH | $3,500 | $2,400 | $2,500 |
| 611E98470 CATCH BASIN, NO. 2-2B | 5 EACH | $2,000 | $1,650 | $1,750 |
| 611E98510 CATCH BASIN, NO. 2-3 | 9 EACH | $3,500 | $2,000 | $2,750 |
| 611E98540 CATCH BASIN, NO. 2-4 | 1 EACH | $4,500 | $2,700 | $3,250 |
| 611E99574 MANHOLE, NO. 3 | 2 EACH | $7,500 | $4,700 | $5,500 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $250 | $300 | $300 |
| 204E10000 SUBGRADE COMPACTION | 1,864 SY | $1.00 | $1.00 | $6.00 |
| 204E45000 PROOF ROLLING | 8 HOUR | $150 | $150 | $250 |
| 206E11000 CURING COAT | 15,740 SY | $0.45 | $0.60 | $1.25 |
| 206E30000 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS | 1 LS | $10,000 | $10,500 | $10,000 |
| 407E10000 TACK COAT | 15 GAL | $1.00 | $1.00 | $1.00 |
| 407E20000 NON-TRACKING TACK COAT | 1,506 GAL | $1.00 | $1.00 | $1.00 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 242 SY | $48.00 | $57.00 | $50.00 |
| 625E00450 CONNECTION, FUSED PULL APART | 16 EACH | $90.00 | $90.00 | $90.00 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 9 EACH | $90.00 | $90.00 | $90.00 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT20B40 | 8 EACH | $2,800 | $2,800 | $2,800 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 8 EACH | $1,940 | $1,940 | $1,940 |
| 625E22990 NO. 6 AWG 600 VOLT DISTRIBUTION CABLE | 348 FT | $2.80 | $2.80 | $2.80 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 1,120 FT | $1.50 | $1.50 | $1.50 |
| 625E24324 1-1/2" DUCT CABLE WITH THREE NO. 6 AWG 2400 VOLT C | 1,203 FT | $8.20 | $8.20 | $8.20 |
| 625E25400 CONDUIT, 2", 725.04 | 50 FT | $24.00 | $24.00 | $24.00 |
| 625E25500 CONDUIT, 3", 725.04 | 270 FT | $37.00 | $37.00 | $37.00 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 8 EACH | $425 | $425 | $425 |
| 625E29002 TRENCH, 24" DEEP | 1,089 FT | $13.00 | $13.00 | $13.00 |
| 625E30700 PULL BOX, 725.08, 18" | 7 EACH | $900 | $900 | $900 |
| 625E32000 GROUND ROD | 8 EACH | $265 | $265 | $265 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $6,750 | $6,750 | $6,750 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 50 FT | $0.60 | $0.60 | $0.60 |
| 625E38000 HIGH VOLTAGE TEST | 1 LS | $364 | $364 | $364 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 900.58 FT | $12.50 | $12.50 | $12.50 |
| 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 | 70 FT | $44.50 | $44.50 | $44.50 |
| 630E08600 SIGN POST REFLECTOR | 17 EACH | $45.00 | $45.00 | $45.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 4 EACH | $385 | $385 | $385 |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 2 EACH | $545 | $545 | $545 |
| 630E80100 SIGN, FLAT SHEET | 441.47 SF | $15.00 | $15.00 | $15.00 |
| 630E80600 SIGN, DOUBLE FACED, MILE MARKER | 1 EACH | $140 | $140 | $140 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 4 EACH | $920 | $920 | $920 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 37 EACH | $15.00 | $15.00 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 25 EACH | $30.00 | $30.00 | $30.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 56 EACH | $15.00 | $15.00 | $15.00 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 2 EACH | $20.00 | $20.00 | $20.00 |
| 630E87520 REMOVAL OF POLE MOUNTED SIGN AND REERECTION | 1 EACH | $245 | $245 | $245 |
| 630E97700 SIGNING, MISC.:SALVAGE OF EXISTING FLASHING LED SI | 4 EACH | $65.00 | $65.00 | $65.00 |
| 630E97800 SIGNING, MISC.:"911" EMERGENCY SIGN | 15.25 SF | $40.00 | $40.00 | $40.00 |
| 630E97800 SIGNING, MISC.:EXTRUSHEET PANEL REMOVAL AND REPLAC | 31 SF | $34.70 | $34.70 | $34.70 |
| 644E00104 EDGE LINE, 6", WHITE | 1.03 MILE | $4,500 | $4,500 | $4,500 |
| 644E00300 CENTER LINE, DOUBLE YELLOW | 0.58 MILE | $7,000 | $7,000 | $7,000 |
| 644E00700 TRANSVERSE/DIAGONAL LINE, YELLOW | 463 FT | $6.00 | $6.00 | $6.00 |
| 644E01514 DOTTED LINE, 8" | 164 FT | $3.00 | $3.00 | $3.00 |
| 644E20800 YIELD LINE | 67 FT | $10.00 | $10.00 | $10.00 |
| 661E20080 DECIDUOUS SHRUB, 4' HEIGHT, RHUS AROMATICA | 8 EACH | $180 | $180 | $650 |
| 661E99930 PLANTING, MISC.:10" GRAY WASHED RIVER STONE MULCH | 284 SY | $43.00 | $43.60 | $55.00 |
| 662E30000 LANDSCAPE WATERING | 1 MGAL | $1,500 | $1,500 | $1,000 |
| 253E02000 PAVEMENT REPAIR | 60 CY | $300 | $300 | $300 |
| 304E20000 AGGREGATE BASE | 60 CY | $62.00 | $70.00 | $70.00 |
| 407E10000 TACK COAT | 60 GAL | $1.00 | $1.00 | $1.00 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 10 CY | $75.00 | $150 | $65.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 30 CY | $280 | $280 | $280 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $65.00 | $70.00 | $85.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $5,500 | $5,500 | $10,000 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $875 | $825 | $500 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 24 SNMT | $1,000 | $950 | $950 |
| 614E40051 BUSINESS ENTRANCE SIGN, AS PER PLAN | 1 EACH | $250 | $250 | $250 |
| 616E10000 WATER | 5 MGAL | $10.00 | $100 | $50.00 |
| 617E10100 COMPACTED AGGREGATE | 150 CY | $62.00 | $100 | $65.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,000 | $20,000 | $5,000 |
| 202E23000 PAVEMENT REMOVED | 857 SY | $15.00 | $20.00 | $20.00 |
| 202E38000 GUARDRAIL REMOVED | 603 FT | $3.00 | $1.60 | $1.60 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 4 EACH | $275 | $275 | $275 |
| 203E10000 EXCAVATION | 66 CY | $45.00 | $75.00 | $50.00 |
| 203E20000 EMBANKMENT | 564 CY | $15.00 | $32.00 | $25.00 |
| 204E10000 SUBGRADE COMPACTION | 997 SY | $1.00 | $1.00 | $6.00 |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN | 125 FT | $31.20 | $31.20 | $31.20 |
| 606E15101 GUARDRAIL, TYPE MGS WITH LONG POSTS, AS PER PLAN | 213 FT | $33.00 | $33.00 | $33.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 3 EACH | $2,780 | $2,780 | $2,780 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,185 | $1,185 | $1,185 |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 4 EACH | $2,725 | $2,725 | $2,725 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 1 EACH | $135 | $185 | $250 |
| 659E10000 SEEDING AND MULCHING | 986 SY | $4.20 | $3.35 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.13 TON | $600 | $600 | $1,500 |
| 659E35000 WATER | 5 MGAL | $1.00 | $1.00 | $20.00 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 66 FT | $15.00 | $16.00 | $20.00 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 160 CY | $170 | $170 | $170 |
| 304E20000 AGGREGATE BASE | 236 CY | $62.00 | $63.00 | $85.00 |
| 407E10000 TACK COAT | 124 GAL | $1.00 | $1.00 | $1.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 31 CY | $235 | $235 | $235 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (36 CY | $195 | $195 | $195 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 4 EACH | $55.00 | $55.00 | $55.00 |
| 621E00100 RPM | 4 EACH | $574 | $595 | $950 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 5 EACH | $6.50 | $30.00 | $15.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, (BI-DIRECTIONAL) | 12 EACH | $8.10 | $8.10 | $8.10 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $60.00 | $60.00 | $60.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 3 EACH | $95.00 | $95.00 | $95.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.1 MILE | $8,000 | $8,000 | $8,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.05 MILE | $12,000 | $12,000 | $12,000 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $30,000 | $50,000 | $65,000 |
| 202E22900 APPROACH SLAB REMOVED | 111 SY | $30.00 | $35.00 | $35.00 |
| 202E23500 WEARING COURSE REMOVED | 131 SY | $25.00 | $11.00 | $20.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $1,500 | $1.00 | $1.00 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $7,500 | $3,000 | $10,000 |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 10,710 LB | $1.77 | $1.75 | $1.65 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 194 EACH | $32.00 | $21.00 | $25.00 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 17 CY | $1,200 | $975 | $1,250 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 178 SY | $12.00 | $12.50 | $15.00 |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 24 FT | $200 | $85.00 | $100 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 230 SF | $12.00 | $5.00 | $12.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 113 FT | $55.00 | $28.00 | $35.00 |
| 516E41100 1/8" PREFORMED BEARING PAD | 22 EACH | $30.00 | $20.00 | $15.00 |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 44 EACH | $150 | $90.00 | $125 |
| 517E70000 RAILING (TWIN STEEL TUBE) | 81 FT | $214 | $214 | $214 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $1,500 | $2,800 | $5,000 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 89 FT | $15.00 | $18.00 | $16.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 156 FT | $10.00 | $8.00 | $12.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 40 FT | $10.00 | $20.00 | $25.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 15 SF | $100 | $150 | $200 |
| 526E90011 TYPE A INSTALLATION, AS PER PLAN | 102 FT | $125 | $160 | $175 |
| 843E50001 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 12 SF | $100 | $200 | $200 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 42 CF | $575 | $547 | $600 |
| 253E02000 PAVEMENT REPAIR | 20 CY | $300 | $300 | $300 |
| 407E10000 TACK COAT | 20 GAL | $1.00 | $1.00 | $1.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 10 CY | $280 | $280 | $280 |
| 616E10000 WATER | 1 MGAL | $10.00 | $100 | $20.00 |
| 617E10100 COMPACTED AGGREGATE | 50 CY | $62.00 | $100 | $75.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $28,000 | $15,500 | $35,000 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $4,000 | $500 | $6,500 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $18,000 | $12,000 | $40,000 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $2,600 | $2,000 | $2,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $30,000 | $25,800 | $25,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,292 CY | $155 | $355k | 12% |
| 304E20000 AGGREGATE BASE | 3,043 CY | $52 | $158k | 5% |
| 203E10000 EXCAVATION | 7,204 CY | $18 | $130k | 4% |
| 452E19200 NON-REINFORCED CONCRETE PAVEMENT, MISC.:" CONCRETE | 1,579 SY | $79.77 | $126k | 4% |
| 515E12031 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 11 EACH | $11,200 | $123k | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 589 CY | $200 | $118k | 4% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (601 CY | $175 | $105k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |
| 206E10300 LIME | 476 TON | $178 | $85k | 3% |
| 611E16600 36" CONDUIT, TYPE C | 534 FT | $150 | $80k | 3% |