GRE-SR 235-03.79
GRE County · est $0.2M
Bid dateThursday, December 2—
GRE County · est $0.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 17 more items below.
| Item | Quantity | R1Miller Cable Company | R2Complete General Construction Company | R3Perram Electric INC | R4Security Fence Group INC | R5U S Utility Contractor Company | R6Bansal Construction INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 632E72140 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 13 | 4 EACH | $14,250 | $14,700 | $14,440 | $16,329 | $20,687 | $17,850 | 25% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 4 EACH | $7,400 | $5,500 | $5,590 | $5,478 | $3,785 | $4,815 | 13% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $7,300 | $6,900 |
| Item | Quantity | R1Miller Cable Company | R2Complete General Construction Company | R3Perram Electric INC | R4Security Fence Group INC | R5U S Utility Contractor Company | R6Bansal Construction INC |
|---|---|---|---|---|---|---|---|
| 611E00400 4" CONDUIT, TYPE E | 120 FT | $1.90 | $9.00 | $8.40 | $6.00 | $5.32 | $1.00 |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 5 EACH | $350 | $400 | $205 | $227 | $291 | $350 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 9 EACH | $125 | $125 | $130 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $7,575 |
| $7,392 |
| $8,103 |
| $8,195 |
| 13% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $6,900 | $6,000 | $7,035 | $7,062 | $7,758 | $7,835 | 12% |
| 625E25908 CONDUIT, JACKED OR DRILLED, 725.052, 4" | 292 FT | $50.00 | $45.00 | $36.95 | $39.55 | $37.75 | $46.00 | 6% |
| 633E65521 CABINET, TYPE 332, AS PER PLAN | 1 EACH | $11,250 | $12,000 | $10,360 | $12,716 | $11,955 | $13,000 | 5% |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 1 EACH | $6,600 | $6,800 | $5,800 | $7,172 | $6,775 | $7,225 | 3% |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 7 EACH | $875 | $700 | $725 | $864 | $852 | $1,040 | 3% |
| 625E30706 PULL BOX, 725.08, 24" | 5 EACH | $1,150 | $1,300 | $1,265 | $914 | $1,070 | $1,150 | 3% |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $5,500 | $5,800 | $5,685 | $6,127 | $6,150 | $6,825 | 2% |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 1,247 FT | $4.00 | $3.25 | $2.50 | $3.35 | $4.01 | $2.60 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,800 | $3,000 | $10,500 | $5,852 | $4,588 | $10,000 | 2% |
| 809E60000 CCTV IP-CAMERA SYSTEM, DOME-TYPE | 1 EACH | $4,600 | $10,300 | $6,755 | $8,514 | $10,518 | $9,985 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $10,000 | $10,000 | $5,368 | $4,200 | $10,000 | 2% |
| 625E25908 CONDUIT, JACKED OR DRILLED, 725.052, 2" | 105 FT | $32.00 | $40.00 | $30.45 | $36.75 | $27.70 | $38.00 | 1% |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 1 EACH | $3,100 | $3,000 | $3,130 | $1,540 | $1,119 | $1,280 | 1% |
| 625E31510 PULL BOX REMOVED | 14 EACH | $220 | $325 | $177 | $253 | $542 | $500 | 1% |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 1 EACH | $3,000 | $4,000 | $5,840 | $5,764 | $5,063 | $5,000 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $65.00 | $81.00 | $65.00 | $75.00 | $89.70 | $75.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,523 | $1,350 | $4,650 | $3,000 | $4,100 | $2,030 | 1% |
| $165 |
| $336 |
| $125 |
| 630E80100 SIGN, FLAT SHEET | 55.5 SF | $32.00 | $20.00 | $22.90 | $25.30 | $41.63 | $32.00 |
| 630E87520 REMOVAL OF POLE MOUNTED SIGN AND REERECTION | 1 EACH | $225 | $25.00 | $202 | $198 | $593 | $225 |
| 625E25408 CONDUIT, 2", 725.051 | 97 FT | $10.00 | $15.00 | $13.05 | $12.95 | $6.74 | $6.25 |
| 625E25504 CONDUIT, 3", 725.051 | 36 FT | $15.50 | $20.00 | $14.00 | $21.15 | $10.91 | $11.00 |
| 625E29000 TRENCH | 107 FT | $16.00 | $13.00 | $11.60 | $14.50 | $7.12 | $11.90 |
| 625E30700 PULL BOX, 725.08, 18" | 2 EACH | $925 | $1,150 | $1,075 | $754 | $920 | $895 |
| 625E32000 GROUND ROD | 6 EACH | $285 | $275 | $277 | $275 | $260 | $325 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 107 FT | $1.00 | $2.50 | $0.20 | $1.50 | $0.93 | $1.70 |
| 632E05086 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 1 EACH | $1,500 | $1,200 | $1,235 | $1,326 | $1,438 | $1,620 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 8 EACH | $75.00 | $50.00 | $10.00 | $35.75 | $21.50 | $75.00 |
| 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG | 221 FT | $3.00 | $5.00 | $4.90 | $4.65 | $5.47 | $3.30 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $1,500 | $2,100 | $2,085 | $3,784 | $2,744 | $4,500 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 1 EACH | $450 | $1,250 | $535 | $671 | $1,539 | $1,025 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,000 | $1,100 | $500 | $2,750 | $5,063 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 632E72140 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 13 | 4 EACH | $14,250 | $57k | 23% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 4 EACH | $7,400 | $30k | 12% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $7,300 | $29k | 12% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $6,900 | $28k | 11% |
| 625E25908 CONDUIT, JACKED OR DRILLED, 725.052, 4" | 292 FT | $50 | $15k | 6% |
| 633E65521 CABINET, TYPE 332, AS PER PLAN | 1 EACH | $11,250 | $11k | 5% |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 1 EACH | $6,600 | $7k | 3% |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 7 EACH | $875 | $6k | 2% |
| 625E30706 PULL BOX, 725.08, 24" | 5 EACH | $1,150 | $6k | 2% |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $5,500 | $6k | 2% |