HAM-Eastern Corridor VAR TSG
HAM County · est $0.3M
Bid dateThursday, January 13—
HAM County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 27 more items below.
| Item | Quantity | R1Miller Cable Company | R2Bansal Construction INC | % of bid |
|---|---|---|---|---|
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 8 EACH | $8,700 | $8,410 | 22% |
| 824E00011 SYSTEM ANALYSIS, AS PER PLAN | 1 LS | $30,000 | $59,750 | 10% |
| 633E99300 CONTROLLER ITEM, MISC.: CONTROLLER SETTING ADJUSTM | 1 LS | $27,500 | $25,850 | 9% |
| 630E72320 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 6 | 1 EACH | $23,850 | $24,450 | 8% |
| 630E72550 OVERHEAD SIGN SUPPORT, TYPE TC-16.22, DESIGN 13 | 1 EACH | $18,750 | $21,750 | 6% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $16,500 | $6,000 | 5% |
| 809E64500 HIGH-SPEED ETHERNET RADIO | 4 EACH | $4,100 | $4,500 | 5% |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 |
| Item | Quantity | R1Miller Cable Company | R2Bansal Construction INC |
|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $200 | $1,000 |
| 625E10480 LIGHT POLE, DECORATIVE | 1 EACH | $2,700 | $2,750 |
| 625E14500 LIGHT POLE FOUNDATION | 1 EACH | $3,000 | $1,650 |
| 625E32000 GROUND ROD | 3 EACH | $265 | $310 |
| 630E06400 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, S4X7.7 | 27.6 FT | $35.00 | $21.25 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $50.00 | $45.00 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 8 EACH | $165 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 331.7 FT |
| $45.00 |
| $27.50 |
| 5% |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 644 SF | $21.50 | $40.00 | 4% |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 18 EACH | $725 | $900 | 4% |
| 630E84011 CONCRETE BARRIER MEDIAN OVERHEAD SIGN SUPPORT FOUN | 1 EACH | $11,800 | $35,000 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10,000 | 3% |
| 630E97700 SIGNING, MISC.: SIGNAL AHEAD (W3-3) SIGN WITH FLAS | 1 EACH | $9,000 | $5,200 | 3% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 1 EACH | $8,300 | $8,050 | 3% |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 14 EACH | $495 | $530 | 2% |
| 630E09001 BREAKAWAY STRUCTURAL BEAM CONNECTION, AS PER PLAN | 4 EACH | $1,380 | $1,500 | 2% |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 1 EACH | $4,950 | $5,000 | 2% |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 376 FT | $12.50 | $15.00 | 1% |
| 630E80100 SIGN, FLAT SHEET | 298.7 SF | $15.00 | $32.00 | 1% |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 862 FT | $4.45 | $2.80 | 1% |
| $130 |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 98 SF | $22.00 | $42.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 37 EACH | $10.00 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $65.00 | $75.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 25 EACH | $15.00 | $25.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 2 EACH | $285 | $230 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 9 EACH | $15.00 | $30.00 |
| 630E97700 SIGNING, MISC.:REPOSITION EXISTING SIGNS ON BEAM | 2 EACH | $525 | $130 |
| 644E00100 EDGE LINE, 4" | 0.05 MILE | $9,750 | $14,965 |
| 644E00200 LANE LINE, 4" | 0.03 MILE | $4,875 | $13,685 |
| 644E00300 CENTER LINE | 0.01 MILE | $19,500 | $16,525 |
| 644E00400 CHANNELIZING LINE, 8" | 206 FT | $2.00 | $3.75 |
| 644E00500 STOP LINE | 25 FT | $7.00 | $7.75 |
| 644E00620 CROSSWALK LINE, 12" | 80 FT | $3.50 | $5.75 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 115 FT | $7.00 | $7.50 |
| 644E00900 ISLAND MARKING | 50 SF | $5.00 | $5.50 |
| 644E01300 LANE ARROW | 7 EACH | $150 | $150 |
| 644E01410 WORD ON PAVEMENT, 96" | 3 EACH | $200 | $175 |
| 644E01500 DOTTED LINE, 4" | 93 FT | $2.00 | $3.55 |
| 644E01514 DOTTED LINE, 8" | 850 FT | $2.00 | $3.65 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,672 | $2,779 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 8 EACH | $8,700 | $70k | 21% |
| 824E00011 SYSTEM ANALYSIS, AS PER PLAN | 1 LS | $30,000 | $30k | 9% |
| 633E99300 CONTROLLER ITEM, MISC.: CONTROLLER SETTING ADJUSTM | 1 LS | $27,500 | $28k | 8% |
| 630E72320 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 6 | 1 EACH | $23,850 | $24k | 7% |
| 630E72550 OVERHEAD SIGN SUPPORT, TYPE TC-16.22, DESIGN 13 | 1 EACH | $18,750 | $19k | 6% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $16,500 | $17k | 5% |
| 809E64500 HIGH-SPEED ETHERNET RADIO | 4 EACH | $4,100 | $16k | 5% |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 331.7 FT | $45 | $15k | 4% |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 644 SF | $21.5 | $14k | 4% |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 18 EACH | $725 | $13k | 4% |