FAI-SR 158-07.25
FAI County · est $1.9M
Bid dateThursday, February 17—
FAI County · est $1.9M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 113 more items below.
| Item | Quantity | R1Shelly Company | R2Shelly & Sands INC | R3Axis Civil Construction LLC | % of bid |
|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 1,911 CY | $157 | $157 | $170 | 21% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 2,317 SY | $54.25 | $69.00 | $52.00 | 9% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (721 CY | $170 | $170 | $170 | 9% |
| 304E20000 AGGREGATE BASE | 1,538 CY | $64.75 | $81.00 | $80.00 | 7% |
| 203E20000 EMBANKMENT | 4,287 CY | $20.50 | $16.00 |
| Item | Quantity | R1Shelly Company | R2Shelly & Sands INC | R3Axis Civil Construction LLC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,000 | $25,000 | $15,000 |
| 202E20010 HEADWALL REMOVED | 3 EACH | $295 | $325 | $750 |
| 202E53100 MAILBOX REMOVED | 16 EACH | $74.00 | $116 | $50.00 |
| 202E58100 CATCH BASIN REMOVED | 2 EACH | $298 | $304 | $800 |
| 202E75000 FENCE REMOVED | 102 FT | $8.50 | $7.00 | $3.20 |
| 204E10000 SUBGRADE COMPACTION | 3,127 SY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $16.00 |
| 6% |
| 624E10000 MOBILIZATION | 1 LS | $81,000 | $100,000 | $100,000 | 6% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 3,429 FT | $20.00 | $11.00 | $19.00 | 5% |
| 203E10000 EXCAVATION | 2,419 CY | $27.75 | $15.00 | $19.00 | 5% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 318 CY | $195 | $195 | $195 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $55,000 | $82,300 | $65,000 | 4% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 1,044 FT | $44.50 | $23.25 | $19.00 | 3% |
| 202E23000 PAVEMENT REMOVED | 6,194 SY | $7.50 | $8.75 | $10.00 | 3% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 6 EACH | $6,900 | $7,023 | $7,500 | 3% |
| 659E00300 TOPSOIL | 1,108 CY | $35.50 | $11.00 | $32.00 | 3% |
| 206E15010 CEMENT STABILIZED SUBGRADE, 12 INCHES DEEP | 6,514 SY | $5.61 | $5.61 | $5.65 | 3% |
| 832E30000 EROSION CONTROL | 33,873 EACH | $1.00 | $1.00 | $1.00 | 2% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 20 SNMT | $1,600 | $850 | $1,600 | 2% |
| 206E10500 CEMENT | 169 TON | $188 | $188 | $190 | 2% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $30,000 | $20,000 | $20,000 | 2% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $7,000 | $7,329 | $8,000 | 2% |
| $1.50 |
| $6.00 |
| $2.00 |
| 204E45000 PROOF ROLLING | 5 HOUR | $205 | $224 | $250 |
| 206E11000 CURING COAT | 6,514 SY | $1.09 | $1.09 | $1.15 |
| 209E60200 LINEAR GRADING | 27 STA | $44.00 | $420 | $500 |
| 623E40500 REFERENCE MONUMENT | 9 EACH | $395 | $1,039 | $450 |
| 690E12050 SPECIAL - REINFORCED MESH FOR TRANSVERSE AND/OR LO | 1,608 SY | $16.75 | $16.75 | $16.75 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 16 EACH | $170 | $290 | $185 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 12 SY | $215 | $120 | $110 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 2 CY | $650 | $461 | $150 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 9,958 SY | $1.84 | $0.87 | $1.05 |
| 659E14000 REPAIR SEEDING AND MULCHING | 498 SY | $2.00 | $0.69 | $1.05 |
| 659E20000 COMMERCIAL FERTILIZER | 1.34 TON | $850 | $669 | $800 |
| 659E31000 LIME | 2.06 ACRE | $10.00 | $154 | $80.00 |
| 659E35000 WATER | 54 MGAL | $1.00 | $1.00 | $1.00 |
| 670E00700 DITCH EROSION PROTECTION | 566 SY | $1.85 | $1.89 | $2.50 |
| 670E00710 DITCH EROSION PROTECTION MAT, TYPE A | 33 SY | $1.85 | $1.89 | $2.50 |
| 670E00720 DITCH EROSION PROTECTION MAT, TYPE B | 209 SY | $1.85 | $1.95 | $2.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,275 | $1,600 | $1,750 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $1,330 | $6,000 | $6,300 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $7,766 | $9,280 | $11,000 |
| 602E20000 CONCRETE MASONRY | 1.3 CY | $2,000 | $2,750 | $2,500 |
| 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 1,143 FT | $16.50 | $16.75 | $15.00 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 100 FT | $14.75 | $18.00 | $15.00 |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 384 FT | $16.50 | $17.25 | $22.00 |
| 605E31100 AGGREGATE DRAINS | 576 FT | $17.25 | $14.25 | $12.00 |
| 611E00400 4" CONDUIT, TYPE E | 50 FT | $23.00 | $12.00 | $15.00 |
| 611E00406 4" CONDUIT, TYPE F | 50 FT | $23.00 | $12.00 | $15.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 57 FT | $65.00 | $30.00 | $15.00 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $18.00 | $16.00 | $15.00 |
| 611E02000 8" CONDUIT, TYPE C | 101 FT | $37.50 | $41.00 | $32.00 |
| 611E04900 12" CONDUIT, TYPE D | 350 FT | $51.75 | $46.50 | $65.00 |
| 611E06400 15" CONDUIT, TYPE D | 64 FT | $64.00 | $65.00 | $85.00 |
| 611E07900 18" CONDUIT, TYPE D | 10 FT | $110 | $163 | $90.00 |
| 611E08900 21" CONDUIT, TYPE B | 94 FT | $112 | $150 | $120 |
| 611E10400 24" CONDUIT, TYPE B | 108 FT | $125 | $160 | $180 |
| 611E10600 24" CONDUIT, TYPE C, 706.02 | 17 FT | $139 | $529 | $270 |
| 611E98471 CATCH BASIN, NO. 2-2B, AS PER PLAN | 2 EACH | $2,150 | $2,640 | $3,500 |
| 611E98510 CATCH BASIN, NO. 2-3 | 1 EACH | $2,275 | $3,100 | $3,500 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 6 EACH | $235 | $475 | $275 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.0" | 4,047 SY | $6.85 | $6.85 | $6.85 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 3,076 FT | $2.10 | $1.30 | $3.00 |
| 301E56100 ASPHALT CONCRETE BASE, PG64-22, (449), (DRIVEWAYS) | 75 CY | $260 | $260 | $260 |
| 407E20000 NON-TRACKING TACK COAT | 1,401 GAL | $3.05 | $3.05 | $3.05 |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 67 CY | $185 | $185 | $185 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $470 | $470 | $470 |
| 690E98200 SPECIAL - MALTENE BASED LONGITUDINAL JOINT STABILI | 3,299 SF | $1.75 | $1.75 | $1.75 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 0.32 MILE | $11,000 | $11,000 | $11,000 |
| 621E00100 RPM | 57 EACH | $80.00 | $57.00 | $60.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 23 EACH | $6.50 | $10.00 | $25.83 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 248.7 FT | $14.00 | $15.00 | $17.00 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 13.6 FT | $18.00 | $17.50 | $23.00 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 4 EACH | $170 | $150 | $130 |
| 630E80100 SIGN, FLAT SHEET | 149.2 SF | $22.00 | $22.00 | $27.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 29 EACH | $14.00 | $20.00 | $45.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 19 EACH | $20.00 | $20.00 | $45.00 |
| 642E00300 CENTER LINE, TYPE 1 | 0.05 MILE | $2,200 | $2,200 | $2,200 |
| 644E00104 EDGE LINE, 6" | 0.97 MILE | $4,975 | $4,920 | $4,975 |
| 644E00300 CENTER LINE | 0.67 MILE | $6,975 | $6,557 | $6,975 |
| 644E00400 CHANNELIZING LINE, 8" | 687 FT | $1.70 | $1.56 | $1.70 |
| 644E00500 STOP LINE | 71 FT | $6.80 | $6.80 | $6.80 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 241 FT | $6.00 | $10.65 | $6.00 |
| 644E01300 LANE ARROW | 8 EACH | $95.00 | $171 | $95.00 |
| 625E00450 CONNECTION, FUSED PULL APART | 2 EACH | $120 | $95.34 | $120 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 2 EACH | $120 | $104 | $120 |
| 625E18510 BRACKET ARM, 30' | 2 EACH | $1,700 | $1,491 | $1,920 |
| 625E25408 CONDUIT, 2", 725.051 | 35 FT | $12.00 | $7.77 | $30.00 |
| 625E25604 CONDUIT, 4", 725.051 | 35 FT | $25.00 | $17.62 | $40.00 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 2 EACH | $380 | $684 | $475 |
| 625E29002 TRENCH, 24" DEEP | 35 FT | $26.50 | $9.08 | $11.00 |
| 625E30700 PULL BOX, 725.08, 18" | 1 EACH | $1,000 | $741 | $1,200 |
| 625E32000 GROUND ROD | 5 EACH | $325 | $284 | $330 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 35 FT | $3.00 | $1.75 | $1.30 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL - SIGNAL CONTROLL | 1 EACH | $2,000 | $2,655 | $500 |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 10 EACH | $875 | $775 | $670 |
| 632E05086 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 2 EACH | $1,475 | $1,392 | $1,480 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 12 EACH | $32.00 | $20.85 | $100 |
| 632E30200 MESSENGER WIRE, 7 STRAND, 3/8" DIAMETER WITH ACCES | 445 FT | $14.75 | $14.27 | $12.00 |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 445 FT | $15.25 | $19.62 | $16.00 |
| 632E40400 SIGNAL CABLE, 4 CONDUCTOR, NO. 14 AWG | 482 FT | $4.05 | $3.32 | $3.70 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 1,925 FT | $3.80 | $3.80 | $4.50 |
| 632E64000 STRAIN POLE FOUNDATION | 4 EACH | $6,000 | $4,197 | $4,450 |
| 632E64950 TEST HOLE PERFORMED | 4 EACH | $1,350 | $930 | $1,200 |
| 632E67300 POWER CABLE, 3 CONDUCTOR, NO. 8 AWG | 85 FT | $6.50 | $5.11 | $4.40 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $3,350 | $5,547 | $4,000 |
| 632E86140 STRAIN POLE, TYPE TC-81.11, DESIGN 12 | 2 EACH | $12,000 | $11,067 | $10,100 |
| 632E87140 COMBINATION STRAIN POLE, TYPE TC-81.11, DESIGN 12 | 2 EACH | $12,600 | $11,699 | $10,800 |
| 633E65521 CABINET, TYPE 332, AS PER PLAN | 1 EACH | $13,700 | $11,052 | $13,700 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 1 EACH | $3,200 | $961 | $4,400 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 1 EACH | $1,950 | $1,866 | $625 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $6,350 | $5,857 | $6,400 |
| 809E69123 ATC CONTROLLER, AS PER PLAN (PROGRAM AND INSTALL O | 1 EACH | $1,100 | $669 | $1,700 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 16 CY | $140 | $80.00 | $85.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 128 HOUR | $75.00 | $68.00 | $70.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 3,429 FT | $0.80 | $0.50 | $0.80 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,240 | $2,240 | $2,000 |
| 614E12420 DETOUR SIGNING | 1 LS | $12,365 | $12,500 | $12,365 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 46 CY | $295 | $315 | $150 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 71 EACH | $20.00 | $8.00 | $20.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 71 EACH | $15.00 | $17.00 | $30.00 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 1.56 MILE | $1,870 | $2,450 | $1,870 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.36 MILE | $9,000 | $11,075 | $11,075 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 2.89 MILE | $1,410 | $1,420 | $1,410 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 0.67 MILE | $9,000 | $6,105 | $6,105 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $20,000 | $48,500 | $50,000 |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 50 SY | $55.75 | $200 | $60.00 |
| 616E10000 WATER | 25 MGAL | $1.00 | $37.00 | $10.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,500 | $13,750 | $15,000 |
| 619E16010 FIELD OFFICE, TYPE B | 7 MNTH | $2,650 | $3,990 | $2,200 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 1,911 CY | $157 | $300k | 15% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 2,317 SY | $54.25 | $126k | 6% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (721 CY | $170 | $123k | 6% |
| 304E20000 AGGREGATE BASE | 1,538 CY | $64.75 | $100k | 5% |
| 203E20000 EMBANKMENT | 4,287 CY | $20.5 | $88k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $81,000 | $81k | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 3,429 FT | $20 | $69k | 3% |
| 203E10000 EXCAVATION | 2,419 CY | $27.75 | $67k | 3% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 318 CY | $195 | $62k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $55,000 | $55k | 3% |