HAM-Springdale Signal Upgrades
HAM County · est $0.7M
Bid dateThursday, March 10—
HAM County · est $0.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 43 more items below.
| Item | Quantity | R1Perram Electric INC | R2Miller Cable Company | R3Bansal Construction INC | % of bid |
|---|---|---|---|---|---|
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 21 EACH | $7,675 | $7,700 | $8,000 | 28% |
| 632E72150 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 14 | 4 EACH | $18,175 | $19,000 | $21,050 | 13% |
| 625E25906 CONDUIT, JACKED OR DRILLED, 725.051 4" | 840 FT | $48.35 | $50.00 | $45.00 | 7% |
| 632E90400 SIGNALIZATION, MISC.:REPLACE EXISTING CONFLICT MON | 28 EACH | $1,370 | $1,500 | $1,305 | 7% |
| 632E03200 VEHICULAR SIGNAL HEAD, OPTICALLY PROGRAMMED, 3 SEC | 8 EACH | $3,780 | $4,350 |
| Item | Quantity | R1Perram Electric INC | R2Miller Cable Company | R3Bansal Construction INC |
|---|---|---|---|---|
| 202E30000 WALK REMOVED | 378 SF | $10.00 | $10.00 | $7.00 |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 2.9 SY | $800 | $800 | $325 |
| 608E10000 4" CONCRETE WALK | 1.5 SF | $300 | $300 | $15.00 |
| 625E18510 BRACKET ARM, 30' | 4 EACH | $1,710 | $1,300 | $2,045 |
| 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE | 889 FT | $2.95 | $4.00 | $3.00 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $4,275 |
| 5% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 4 EACH | $6,795 | $8,300 | $4,875 | 5% |
| 632E90400 SIGNALIZATION, MISC.:REPLACE EXISTING PUSHBUTTON | 68 EACH | $300 | $250 | $245 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | $20,000 | 3% |
| 608E52000 CURB RAMP | 459 SF | $40.00 | $40.00 | $25.00 | 3% |
| 632E90400 SIGNALIZATION, MISC.:RELAMP EXISTING PEDESTRIAN HE | 98 EACH | $165 | $153 | $215 | 3% |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 6,000 FT | $2.60 | $2.80 | $2.70 | 3% |
| 632E10100 RELAMP EXISTING SIGNAL SECTION WITH LED LAMP UNIT | 234 EACH | $65.00 | $49.00 | $70.00 | 3% |
| 632E10100 RELAMP EXISTING SIGNAL SECTION WITH LED LAMP UNIT | 234 EACH | $65.00 | $49.00 | $70.00 | 3% |
| 632E10100 RELAMP EXISTING SIGNAL SECTION WITH LED LAMP UNIT | 234 EACH | $65.00 | $49.00 | $70.00 | 3% |
| 632E72130 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 12 | 1 EACH | $13,500 | $14,750 | $16,100 | 2% |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 16 EACH | $740 | $1,100 | $1,050 | 2% |
| 633E65510 CABINET, TYPE TS-2 | 1 EACH | $11,055 | $12,000 | $13,850 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,160 | $14,356 | $5,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,124 | $6,102 | $7,613 | 2% |
| 625E30706 PULL BOX, 725.08, 24" | 8 EACH | $1,105 | $1,250 | $1,145 | 2% |
| 564 FT |
| $1.25 |
| $2.00 |
| $2.00 |
| 625E25402 CONDUIT, 2", 725.05 | 150 FT | $12.50 | $16.00 | $6.30 |
| 625E25602 CONDUIT, 4", 725.05 | 95 FT | $21.15 | $28.00 | $14.90 |
| 625E26252 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED)120 V, T | 4 EACH | $440 | $500 | $450 |
| 625E29010 TRENCH, 30" DEEP | 155 FT | $11.90 | $17.00 | $11.90 |
| 625E31600 PULL BOX, MISC.:ADJUSTED TO GRADE | 3 EACH | $670 | $275 | $565 |
| 625E32000 GROUND ROD | 10 EACH | $270 | $265 | $335 |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 12 EACH | $235 | $300 | $375 |
| 630E80100 SIGN, FLAT SHEET | 108 SF | $23.95 | $44.00 | $32.00 |
| 632E05086 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 3 EACH | $1,265 | $1,600 | $1,620 |
| 632E10100 RELAMP EXISTING SIGNAL SECTION WITH LED LAMP UNIT | 106 EACH | $73.00 | $58.00 | $70.00 |
| 632E10100 RELAMP EXISTING SIGNAL SECTION WITH LED LAMP UNIT | 55 EACH | $73.00 | $58.00 | $70.00 |
| 632E10100 RELAMP EXISTING SIGNAL SECTION WITH LED LAMP UNIT | 102 EACH | $74.00 | $58.00 | $70.00 |
| 632E20730 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN | 6 EACH | $475 | $700 | $550 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 19 EACH | $10.00 | $70.00 | $41.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 6 EACH | $5.00 | $55.00 | $41.00 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 6 EACH | $295 | $280 | $260 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 1,700 FT | $2.25 | $2.60 | $2.40 |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 1 EACH | $7,070 | $9,650 | $10,000 |
| 632E64020 PEDESTAL FOUNDATION | 5 EACH | $1,270 | $800 | $945 |
| 632E65300 LOOP DETECTOR LEAD-IN CABLE, 2 CONDUCTOR, NO. 14 A | 1,700 FT | $1.90 | $2.00 | $2.15 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 80 FT | $4.10 | $9.00 | $4.20 |
| 632E70000 POWER SERVICE | 1 EACH | $1,710 | $2,500 | $6,075 |
| 632E89900 PEDESTAL, 8', TRANSFORMER BASE | 5 EACH | $880 | $600 | $875 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 1 EACH | $1,885 | $5,100 | $5,100 |
| 633E67100 CABINET FOUNDATION | 1 EACH | $2,875 | $2,800 | $1,535 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $435 | $650 | $975 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $5,930 | $6,000 | $6,810 |
| 804E32011 DROP CABLE, 12 FIBER, AS PER PLAN | 1 EACH | $1,155 | $1,500 | $3,265 |
| 804E34013 FIBER TERMINATION PANEL, 12 FIBER, AS PER PLAN | 1 EACH | $1,325 | $1,300 | $1,400 |
| 804E37001 SPLICE ENCLOSURE, AS PER PLAN | 1 EACH | $1,090 | $2,500 | $1,050 |
| 804E37701 FIBER OPTIC CABLE TESTING, AS PER PLAN | 1 LS | $670 | $1,850 | $1,165 |
| 809E60000 CCTV IP-CAMERA SYSTEM, DOME-TYPE | 1 EACH | $6,765 | $8,250 | $5,000 |
| 809E64500 HIGH-SPEED ETHERNET RADIO | 1 EACH | $2,550 | $3,300 | $3,215 |
| 809E64550 ETHERNET CABLE, OUTDOOR-RATED | 400 FT | $2.50 | $3.00 | $2.80 |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 1 EACH | $4,300 | $5,500 | $5,820 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $55.00 | $70.00 | $75.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $100 | $1,650 | $7,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 21 EACH | $7,675 | $161k | 23% |
| 632E72150 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 14 | 4 EACH | $18,175 | $73k | 10% |
| 625E25906 CONDUIT, JACKED OR DRILLED, 725.051 4" | 840 FT | $48.35 | $41k | 6% |
| 632E90400 SIGNALIZATION, MISC.:REPLACE EXISTING CONFLICT MON | 28 EACH | $1,370 | $38k | 6% |
| 632E03200 VEHICULAR SIGNAL HEAD, OPTICALLY PROGRAMMED, 3 SEC | 8 EACH | $3,780 | $30k | 4% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 4 EACH | $6,795 | $27k | 4% |
| 632E90400 SIGNALIZATION, MISC.:REPLACE EXISTING PUSHBUTTON | 68 EACH | $300 | $20k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 3% |
| 608E52000 CURB RAMP | 459 SF | $40 | $18k | 3% |
| 632E90400 SIGNALIZATION, MISC.:RELAMP EXISTING PEDESTRIAN HE | 98 EACH | $165 | $16k | 2% |