D08-TSG-FY2022
D08 County · est $1.5M
Bid dateThursday, May 26—
D08 County · est $1.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 29 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Bansal Construction INC | R3Miller Cable Company | % of bid |
|---|---|---|---|---|---|
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 36 EACH | $7,200 | $8,400 | $8,600 | 24% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 34 EACH | $6,800 | $8,050 | $8,450 | 22% |
| 809E60000 CCTV IP-CAMERA SYSTEM, DOME-TYPE | 17 EACH | $6,000 | $4,800 | $7,250 | 10% |
| 632E90500 SIGNALIZATION, MISC.: UNLASH AND RELASH MESSENGER | 8,950 FT | $6.00 | $8.50 | $4.25 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $40,000 | 4% |
| 632E20750 ACCESSIBLE PEDESTRIAN PUSHBUTTON | 44 EACH | $900 | $750 | $850 | 4% |
| 633E99000 CONTROLLER ITEM, MISC.: AUXILIARY OUTPUT FILE |
| Item | Quantity | R1Complete General Construction Company | R2Bansal Construction INC | R3Miller Cable Company |
|---|---|---|---|---|
| 202E30700 CONCRETE BARRIER REMOVED | 80 FT | $55.00 | $175 | $100 |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 29 EACH | $300 | $350 | $480 |
| 630E80100 SIGN, FLAT SHEET | 233.5 SF | $21.00 | $35.00 | $33.50 |
| 630E84010 CONCRETE BARRIER MEDIAN OVERHEAD SIGN SUPPORT FOUN | 1 EACH | $6,000 | $18,800 | $19,700 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $75.00 | $35.00 | $26.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 19 EACH |
| $1,900 |
| $1,365 |
| $2,000 |
| 3% |
| 632E04000 VEHICULAR SIGNAL HEAD, MISC.: 3-SECTION FLASHING | 29 EACH | $1,175 | $1,165 | $900 | 3% |
| 633E65521 CABINET, TYPE 332, AS PER PLAN | 2 EACH | $14,900 | $16,100 | $15,500 | 3% |
| 622E10161 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, AS PER PLA | 80 FT | $350 | $265 | $500 | 3% |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 28 EACH | $950 | $555 | $650 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $20,000 | $42,200 | 2% |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 22 EACH | $1,075 | $1,030 | $825 | 2% |
| 809E69123 ATC CONTROLLER, AS PER PLAN | — | $1,000 | $660 | $1,250 | 2% |
| 809E60040 CCTV IP-CAMERA SYSTEM, QUAD MULTI-VIEW FIXED WITH | 3 EACH | $7,550 | $6,710 | $9,500 | 2% |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM: DET | 9 EACH | $2,500 | $975 | $750 | 2% |
| 632E90400 SIGNALIZATION, MISC.: CABINET INTERFACE DEVICE | 23 EACH | $925 | $830 | $4,200 | 2% |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 6,050 FT | $3.30 | $2.45 | $3.70 | 2% |
| 632E90400 SIGNALIZATION, MISC.: RELOCATE VEHICULAR SIGNAL H | 24 EACH | $700 | $400 | $300 | 2% |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 2 EACH | $7,500 | $7,760 | $7,150 | 1% |
| 630E89902 REMOVAL OF MISCELLANEOUS TRAFFIC CONTROL ITEM, SPA |
| 3 EACH |
| $90.00 |
| $150 |
| $145 |
| 625E25500 CONDUIT, 3", 725.04 | 43 FT | $51.00 | $30.70 | $55.00 |
| 625E29400 TRENCH IN PAVED AREA | 43 FT | $60.00 | $75.00 | $40.00 |
| 625E30700 PULL BOX, 725.08, 18" | 1 EACH | $1,350 | $800 | $1,500 |
| 625E32000 GROUND ROD | 2 EACH | $350 | $315 | $300 |
| 632E04904 VEHICULAR SIGNAL HEAD, (LED), 2-SECTION, 12" LENS, | 4 EACH | $925 | $1,100 | $650 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 51 EACH | $50.00 | $65.00 | $70.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 28 EACH | $42.00 | $65.00 | $50.00 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 5,450 FT | $2.70 | $2.15 | $3.40 |
| 632E65300 LOOP DETECTOR LEAD-IN CABLE, 2 CONDUCTOR, NO. 14 A | 5,500 FT | $2.00 | $1.95 | $3.00 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $5,350 | $5,830 | $11,000 |
| 632E72110 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 4 | 1 EACH | $13,750 | $14,540 | $18,500 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM: VEH | 27 EACH | $130 | $115 | $25.00 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM: WAV | 15 EACH | $300 | $285 | $175 |
| 633E99000 CONTROLLER ITEM, MISC.: COMMUNICATION ENCLOSURE | 1 EACH | $3,025 | $1,290 | $1,500 |
| 633E99000 CONTROLLER ITEM, MISC.: FLASHING YELLOW ARROW CAB | 16 EACH | $825 | $200 | $700 |
| 633E99000 CONTROLLER ITEM, MISC.: REPROGRAMMING OF EXISTING | 18 EACH | $775 | $1,060 | $500 |
| 633E99000 CONTROLLER ITEM, MISC.: REPROGRAMMING OF EXISTING | 2 EACH | $800 | $200 | $600 |
| 809E64550 ETHERNET CABLE, OUTDOOR-RATED | 1,470 FT | $3.50 | $1.95 | $4.00 |
| 809E65990 ITS DEVICE, MISC.: REMOVAL OF RAMP METER PEDESTAL | 2 EACH | $6,000 | $500 | $300 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 164 HOUR | $82.00 | $75.00 | $70.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $1,200 | $1,050 | $875 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,000 | $8,856 | $13,403 |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $10,000 | $6,500 | $16,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 36 EACH | $7,200 | $259k | 21% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 34 EACH | $6,800 | $231k | 19% |
| 809E60000 CCTV IP-CAMERA SYSTEM, DOME-TYPE | 17 EACH | $6,000 | $102k | 8% |
| 632E90500 SIGNALIZATION, MISC.: UNLASH AND RELASH MESSENGER | 8,950 FT | $6 | $54k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 632E20750 ACCESSIBLE PEDESTRIAN PUSHBUTTON | 44 EACH | $900 | $40k | 3% |
| 633E99000 CONTROLLER ITEM, MISC.: AUXILIARY OUTPUT FILE | 19 EACH | $1,900 | $36k | 3% |
| 632E04000 VEHICULAR SIGNAL HEAD, MISC.: 3-SECTION FLASHING | 29 EACH | $1,175 | $34k | 3% |
| 633E65521 CABINET, TYPE 332, AS PER PLAN | 2 EACH | $14,900 | $30k | 2% |
| 622E10161 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, AS PER PLA | 80 FT | $350 | $28k | 2% |