ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 36 more items below.
| Item | Quantity | R1Miller Cable Company | R2Axis Civil Construction LLC | R3Complete General Construction Company | R4Perram Electric INC | % of bid |
|---|---|---|---|---|---|---|
| 625E25502 CONDUIT, 3", 725.05 | 3,503 FT | $42.00 | $15.50 | $15.50 | $11.05 | 21% |
| 625E27401 LUMINAIRE, POST TOP, AS PER PLAN, STERNBERG MODEL | 22 EACH | $3,150 | $2,925 | $2,925 | $3,930 | 10% |
| 625E10481 LIGHT POLE, DECORATIVE, AS PER PLAN | 22 EACH | $2,850 | $2,300 | $2,300 | $4,313 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $48,678 | $50,000 | $72,000 | $86,315 | 7% |
| 625E14001 LIGHT POLE FOUNDATION, 24" X 6' DEEP, AS PER PLAN | 22 EACH | $2,200 | $1,650 | $1,650 | $3,268 | 7% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 6,248 SF | $6.50 |
| Item | Quantity | R1Miller Cable Company | R2Axis Civil Construction LLC | R3Complete General Construction Company | R4Perram Electric INC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,252 | $15,000 | $4,000 | $10,625 |
| 202E30200 STEPS REMOVED | 10 FT | $45.00 | $50.00 | $30.00 | $64.70 |
| 202E32001 CURB REMOVED, AS PER PLAN | 12 FT | $60.00 | $100 | $35.00 | $18.45 |
| 203E10000 EXCAVATION | 30 CY | $100 | $45.00 | $60.00 | $114 |
| 203E20000 EMBANKMENT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $12.50 |
| $14.00 |
| $8.93 |
| 6% |
| 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE | 12,225 FT | $3.30 | $2.65 | $2.65 | $2.53 | 6% |
| 452E12011 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, | 264 SY | $135 | $135 | $130 | $144 | 5% |
| 608E98000 WALKWAY, MISC.: 4" STAMPED CONCRETE WALK | 2,296 SF | $15.50 | $21.00 | $23.00 | $12.20 | 5% |
| 608E98000 WALKWAY, MISC.: BRICK WALK REMOVE AND RESET | 1,302 SF | $23.50 | $42.00 | $36.00 | $34.15 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $40,000 | $20,000 | $20,000 | 3% |
| 202E30000 WALK REMOVED | 6,477 SF | $3.00 | $6.00 | $11.00 | $4.14 | 3% |
| 625E29400 TRENCH IN PAVED AREA | 834 FT | $18.00 | $21.00 | $21.00 | $17.05 | 2% |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $13,500 | $19,900 | $19,900 | $13,110 | 2% |
| 625E30710 PULL BOX, 725.08, 32" | 4 EACH | $3,150 | $2,500 | $2,500 | $2,420 | 2% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 30 CY | $350 | $190 | $185 | $184 | 2% |
| 653E10000 TOPSOIL FURNISHED AND PLACED | 91 CY | $115 | $75.00 | $38.00 | $224 | 2% |
| 452E09010 4" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 145 SY | $70.00 | $120 | $118 | $147 | 1% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 265 SY | $33.50 | $40.00 | $40.00 | $54.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,882 | $5,000 | $4,000 | $14,874 | 1% |
| 30 CY |
| $130 |
| $45.00 |
| $25.00 |
| $114 |
| 204E10000 SUBGRADE COMPACTION | 1,362 SY | $3.25 | $3.00 | $5.00 | $1.62 |
| 204E13000 EXCAVATION OF SUBGRADE | 30 CY | $100 | $45.00 | $42.00 | $114 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 30 CY | $130 | $80.00 | $135 | $205 |
| 608E52000 CURB RAMP | 50 SF | $13.50 | $35.00 | $28.00 | $20.15 |
| 608E53020 DETECTABLE WARNING | 130 SF | $12.50 | $25.00 | $56.00 | $264 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 363 SY | $9.80 | $8.30 | $9.80 | $6.65 |
| 659E20000 COMMERCIAL FERTILIZER | 0.06 TON | $1,150 | $1,400 | $1,150 | $3,765 |
| 659E31000 LIME | 0.15 ACRE | $44.00 | $80.00 | $44.00 | $1,735 |
| 659E35000 WATER | 2 MGAL | $1.00 | $1.00 | $1.00 | $1.50 |
| 832E30000 EROSION CONTROL | 3,587 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E00101 4" CONDUIT, TYPE B, AS PER PLAN | 80 FT | $25.00 | $35.00 | $35.00 | $26.70 |
| 609E18001 COMBINATION CURB AND GUTTER, TYPE 3, AS PER PLAN | 12 FT | $58.00 | $100 | $325 | $81.25 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 6 EACH | $250 | $250 | $245 | $275 |
| 638E10900 SERVICE BOX ADJUSTED TO GRADE | 6 EACH | $250 | $250 | $135 | $275 |
| 625E00450 CONNECTION, FUSED PULL APART | 66 EACH | $95.00 | $170 | $170 | $133 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 22 EACH | $95.00 | $150 | $150 | $133 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 1,320 FT | $2.20 | $2.00 | $2.00 | $1.63 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 35 FT | $55.00 | $73.00 | $73.00 | $72.10 |
| 625E29001 TRENCH, AS PER PLAN | 1,080 FT | $5.00 | $9.00 | $9.00 | $17.05 |
| 625E30510 PULL BOX, 725.06, SIZE 4 | 1 EACH | $1,000 | $1,500 | $1,500 | $835 |
| 625E32000 GROUND ROD | 22 EACH | $275 | $325 | $325 | $290 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 1,045 FT | $1.30 | $2.00 | $2.00 | $1.15 |
| 630E04101 GROUND MOUNTED SUPPORT, NO. 4 POST, AS PER PLAN | 28 FT | $72.50 | $72.50 | $72.50 | $19.70 |
| 630E08600 SIGN POST REFLECTOR | 1 EACH | $65.00 | $65.00 | $65.00 | $102 |
| 630E86011 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 1 EACH | $135 | $135 | $135 | $171 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $80.00 | $65.00 | $85.00 | $65.00 |
| 616E10000 WATER | 5 MGAL | $1.00 | $10.00 | $750 | $2.00 |
| 619E16000 FIELD OFFICE, TYPE A | 6 MNTH | $900 | $1,800 | $2,500 | $2,400 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,400 | $8,000 | $18,000 | $3,000 |
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS | 1 LS | $2,500 | $5,000 | $4,000 | $1,500 |
| 690E98400 SPECIAL - PRE-CONSTRUCTION PHOTOGRAPHS/VIDEO | 1 LS | $2,000 | $3,500 | $5,000 | $1,065 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 625E25502 CONDUIT, 3", 725.05 | 3,503 FT | $42 | $147k | 19% |
| 625E27401 LUMINAIRE, POST TOP, AS PER PLAN, STERNBERG MODEL | 22 EACH | $3,150 | $69k | 9% |
| 625E10481 LIGHT POLE, DECORATIVE, AS PER PLAN | 22 EACH | $2,850 | $63k | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $48,678 | $49k | 6% |
| 625E14001 LIGHT POLE FOUNDATION, 24" X 6' DEEP, AS PER PLAN | 22 EACH | $2,200 | $48k | 6% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 6,248 SF | $6.5 | $41k | 5% |
| 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE | 12,225 FT | $3.3 | $40k | 5% |
| 452E12011 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, | 264 SY | $135 | $36k | 5% |
| 608E98000 WALKWAY, MISC.: 4" STAMPED CONCRETE WALK | 2,296 SF | $15.5 | $36k | 5% |
| 608E98000 WALKWAY, MISC.: BRICK WALK REMOVE AND RESET | 1,302 SF | $23.5 | $31k | 4% |