Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
5.0%DBE GoalDBE = Disadvantaged Business Enterprise. Federal-USDOT program targeting at least this much of the contract's value with certified small businesses majority-owned by socially / economically disadvantaged individuals (49 CFR Part 26).
Project scope
Bid form · ODOT
Signs31%
Pavement Marking11%
Signals & Lighting11%
Earthwork6%
Removal & Demolition6%
Drainage6%
Other29%
Per-bidder unit pricing
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 15 more items below.
630E84900REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL
7 EACH
$25.15
630E85100REMOVAL OF GROUND MOUNTED SIGN AND REERECTION
3 EACH
$125
630E86002REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA
9 EACH
$39.10
630E87100REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION
1 EACH
$615
625E25408CONDUIT, 2", 725.051
15 FT
$29.70
625E29000TRENCH
Project details
Description
MIA-Piqua SRTS-Infras-FY22
Type of work
Signals
DBE goal
500%
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
15 FT
$11.75
625E32000GROUND ROD
2 EACH
$285
632E42300SIGNAL CABLE, 3 CONDUCTOR, NO. 12 AWG
156 FT
$2.85
632E68200POWER CABLE, 2 CONDUCTOR, NO. 6 AWG
50 FT
$6.15
632E90210REUSE OF PEDESTRIAN PUSHBUTTON
1 EACH
$250
632E90500SIGNALIZATION, MISC.:REMOVE AND INSTALL LASHING RO
75 FT
$4.70
623E10000CONSTRUCTION LAYOUT STAKES AND SURVEYING
1 LS
$100
Top items by winning bid
Item
Qty
Unit price
Extended
%
631E93241SCHOOL SPEED LIMIT SIGN ASSEMBLY, SOLAR-POWERED, A
7 EACH
$10,785
$75k
53%
608E130016" CONCRETE WALK, AS PER PLAN
468 SF
$18.55
$9k
6%
690E50560SPECIAL - BICYCLE RACK
13 EACH
$570
$7k
5%
644E01100SCHOOL SYMBOL MARKING, 72", WHITE
9 EACH
$800
$7k
5%
614E11000MAINTAINING TRAFFIC
1 LS
$5,900
$6k
4%
631E94490REMOVAL, MISC.:XISTING SCHOOL SPEED LIMIT SIGN ASS
5 EACH
$1,055
$5k
4%
624E10000MOBILIZATION
1 LS
$4,000
$4k
3%
630E80100SIGN, FLAT SHEET
135.5 SF
$25.3
$3k
2%
630E84511RIGID OVERHEAD SIGN SUPPORT FOUNDATION, AS PER PLA
1 EACH
$3,420
$3k
2%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM