| Item | Quantity | R1Perram Electric INC | R2Miller Cable Company | R3S E T INC | % of bid |
|---|---|---|---|---|---|
| 632E79110 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 3 EACH | $13,915 | $14,500 | $15,600 | 15% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $9,140 | $8,200 | $10,000 | 13% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 4 EACH | $6,030 | $9,900 | $5,800 | 9% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 336 FT | $65.65 | $58.00 | $78.00 | 8% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 2 EACH | $8,450 | $7,900 | $9,600 | 6% |
| 608E52000 CURB RAMP | 668 SF | $25.00 | $28.00 | $32.00 | 6% |
| 632E72130 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 12 | 1 EACH | $15,180 | $16,000 | $21,500 | 6% |
| 633E65523 CABINET, TYPE 332L, AS PER PLAN | 1 EACH | $12,785 | $13,000 | $15,000 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,470 | $7,450 | $15,000 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10,000 | $10,000 | 4% |
| 632E64020 PEDESTAL FOUNDATION | 6 EACH | $1,350 | $1,000 | $900 | 3% |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $8,070 | $7,229 | $7,500 | 3% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 8 EACH | $948 | $1,150 | $1,050 | 3% |
| 632E20750 ACCESSIBLE PEDESTRIAN PUSHBUTTON | 8 EACH | $920 | $900 | $850 | 3% |
| 646E10510 CROSSWALK LINE, 12" | 363 FT | $19.00 | $19.00 | $20.00 | 3% |
| 625E30706 PULL BOX, 725.08, 24" | 5 EACH | $1,350 | $1,400 | $950 | 2% |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 1 EACH | $6,215 | $3,300 | $4,600 | 2% |
| 632E89900 PEDESTAL, 8', TRANSFORMER BASE | 6 EACH | $930 | $950 | $700 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,550 | $3,453 | $4,000 | 2% |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $4,500 | $500 | $2,161 | 2% |
| Item | Quantity | R1Perram Electric INC | R2Miller Cable Company | R3S E T INC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $100 | $600 | $5,000 |
| 202E30000 WALK REMOVED | 255 SF | $8.00 | $17.00 | $8.00 |
| 203E10000 EXCAVATION | 6 CY | $80.00 | $110 | $250 |
| 203E20000 EMBANKMENT | 3 CY | $150 | $150 | $250 |
| 608E10000 4" CONCRETE WALK | 147 SF | $25.00 | $28.00 | $27.00 |
| 690E65010 SPECIAL - WORK INVOLVING SOLID WASTE | 10 TON |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $170 |
| $75.00 |
| $130 |
| 690E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO | 10 TON | $170 | $50.00 | $130 |
| 690E65020 SPECIAL - WORK INVOLVING WATER | 50 GAL | $30.70 | $1.00 | $10.00 |
| 690E65024 SPECIAL - WORK INVOLVING REGULATED WATER | 50 GAL | $30.70 | $3.25 | $10.00 |
| 659E10000 SEEDING AND MULCHING | 19 SY | $50.00 | $60.00 | $25.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 2 EACH | $225 | $106 | $150 |
| 630E80100 SIGN, FLAT SHEET | 7.2 SF | $27.15 | $51.00 | $55.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $87.50 | $15.00 | $50.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $87.50 | $20.00 | $50.00 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 2 EACH | $87.50 | $15.00 | $50.00 |
| 646E50100 REMOVAL OF PAVEMENT MARKING | 268 FT | $14.50 | $14.35 | $15.00 |
| 625E00450 CONNECTION, FUSED PULL APART | 6 EACH | $200 | $120 | $125 |
| 625E18201 BRACKET ARM, 15', AS PER PLAN | 3 EACH | $600 | $600 | $1,150 |
| 625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE | 744 FT | $2.55 | $3.30 | $3.00 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 246 FT | $1.70 | $2.00 | $3.00 |
| 625E25400 CONDUIT, 2", 725.04 | 126 FT | $19.30 | $19.00 | $18.00 |
| 625E25500 CONDUIT, 3", 725.04 | 62 FT | $35.95 | $33.00 | $40.00 |
| 625E25600 CONDUIT, 4", 725.04 | 20 FT | $66.80 | $46.00 | $45.00 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 3 EACH | $480 | $455 | $750 |
| 625E29000 TRENCH | 160 FT | $12.05 | $15.00 | $15.00 |
| 625E30700 PULL BOX, 725.08, 18" | 3 EACH | $1,165 | $1,100 | $850 |
| 625E31510 PULL BOX REMOVED | 4 EACH | $175 | $100 | $200 |
| 625E32000 GROUND ROD | 12 EACH | $295 | $265 | $400 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 160 FT | $1.00 | $3.00 | $1.00 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 8 EACH | $480 | $620 | $570 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 8 EACH | $10.00 | $60.00 | $50.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 8 EACH | $10.00 | $40.00 | $40.00 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 996 FT | $2.60 | $2.50 | $3.00 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 734 FT | $3.25 | $2.70 | $3.00 |
| 632E64950 TEST HOLE PERFORMED | 4 EACH | $350 | $100 | $500 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 964 FT | $2.05 | $1.25 | $2.00 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 89 FT | $6.65 | $6.00 | $7.00 |
| 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG | 98 FT | $6.30 | $6.00 | $7.00 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $3,250 | $2,300 | $4,000 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 1 EACH | $3,350 | $3,100 | $2,500 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 1 EACH | $950 | $800 | $500 |
| 809E69123 ATC V6.24 CONTROLLER, AS PER PLAN | 1 EACH | $4,400 | $5,300 | $6,000 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 20 HOUR | $75.00 | $70.00 | $68.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $9,100 | $7,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 632E79110 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 3 EACH | $13,915 | $42k | 12% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $9,140 | $37k | 11% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 4 EACH | $6,030 | $24k | 7% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 336 FT | $65.65 | $22k | 6% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 2 EACH | $8,450 | $17k | 5% |
| 608E52000 CURB RAMP | 668 SF | $25 | $17k | 5% |
| 632E72130 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 12 | 1 EACH | $15,180 | $15k | 4% |
| 633E65523 CABINET, TYPE 332L, AS PER PLAN | 1 EACH | $12,785 | $13k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,470 | $10k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 3% |