MOT-IR 75-22.92
MOT County · est $0.3M
Bid dateThursday, June 8—
MOT County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 42 more items below.
| Item | Quantity | R1Bansal Construction INC | R2Perram Electric INC | R3Security Fence Group INC | R4Miller Cable Company | R5Complete General Construction Company | R6Capital Electric Line Builders INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 632E72151 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 14, AS PER P | 2 EACH | $26,815 | $22,800 | $25,980 | $24,000 | $25,000 | $29,524 | 21% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 3 EACH | $9,745 | $9,510 | $9,200 | $9,350 | $9,000 | $10,360 | 12% |
| 632E79151 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 1 EACH | $27,940 | $25,420 |
| Item | Quantity | R1Bansal Construction INC | R2Perram Electric INC | R3Security Fence Group INC | R4Miller Cable Company | R5Complete General Construction Company | R6Capital Electric Line Builders INC |
|---|---|---|---|---|---|---|---|
| 625E31510 PULL BOX REMOVED | 1 EACH | $500 | $190 | $230 | $500 | $900 | $319 |
| 659E00300 TOPSOIL | 5 CY | $295 | $330 | $130 | $85.00 | $200 | $236 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 45 SY | $24.00 | $44.15 | $3.00 | $35.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $27,627 |
| $27,000 |
| $27,000 |
| $33,182 |
| 11% |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 3 EACH | $6,500 | $9,075 | $11,060 | $8,800 | $10,000 | $11,234 | 8% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 2 EACH | $9,395 | $9,210 | $8,870 | $9,650 | $8,500 | $10,006 | 8% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $18,695 | $15,380 | $17,630 | $17,000 | $21,000 | $19,647 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $18,590 | $11,220 | $16,587 | $5,000 | $15,470 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10,000 | $6,690 | $10,000 | $10,000 | $6,372 | 4% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 7 EACH | $1,170 | $920 | $1,080 | $1,100 | $1,100 | $1,088 | 3% |
| 625E25909 CONDUIT, JACKED OR DRILLED, 725.052, AS PER PLAN, | 112 FT | $66.50 | $68.90 | $64.60 | $53.00 | $55.00 | $68.78 | 3% |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $6,920 | $5,890 | $6,505 | $6,500 | $6,500 | $6,986 | 3% |
| 625E25909 CONDUIT, JACKED OR DRILLED, 725.052, AS PER PLAN, | 91 FT | $63.00 | $69.85 | $62.60 | $37.00 | $38.00 | $73.57 | 2% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $5,500 | $2,000 | $5,000 | $4,250 | $4,000 | $4,696 | 2% |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 1 EACH | $5,485 | $4,700 | $5,818 | $5,500 | $5,200 | $5,837 | 2% |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $4,875 | $2,370 | $3,330 | $1,550 | $3,000 | $2,738 | 2% |
| 809E69231 PREEMPT PHASE SELECTOR, AS PER PLAN | 1 EACH | $4,080 | $3,300 | $4,525 | $3,900 | $4,000 | $4,390 | 2% |
| 809E69211 PREEMPT RECEIVING UNIT, AS PER PLAN | 3 EACH | $1,275 | $875 | $928 | $1,100 | $705 | $1,145 | 2% |
| 646E10200 CENTER LINE | 0.02 MILE | $175,000 | $175,000 | $192,500 | $175,000 | $40,780 | $206,500 | 1% |
| 630E74500 OVERHEAD SIGN SUPPORT, MISC.:SIGN SUPPORT, TYPE TC | 1 EACH | $3,474 | $4,280 | $1,900 | $15,850 | $6,000 | $7,835 | 1% |
| 809E69241 PREEMPT CONFIRMATION LIGHT, AS PER PLAN | 3 EACH | $915 | $1,145 | $570 | $755 | $695 | $732 | 1% |
| $69.00 |
| $17.70 |
| 659E14000 REPAIR SEEDING AND MULCHING | 20 SY | $24.00 | $10.00 | $3.00 | $3.00 | $7.50 | $17.70 |
| 659E15000 INTER-SEEDING | 20 SY | $20.00 | $5.00 | $3.00 | $0.80 | $1.00 | $5.90 |
| 659E20000 COMMERCIAL FERTILIZER | 0.05 TON | $2,500 | $1,560 | $1,000 | $400 | $780 | $1,180 |
| 659E35000 WATER | 1 MGAL | $10.00 | $50.00 | $235 | $1.00 | $1.00 | $17.70 |
| 617E10100 COMPACTED AGGREGATE | 15 CY | $50.00 | $180 | $90.00 | $95.00 | $300 | $207 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 13 FT | $16.00 | $19.55 | $16.00 | $20.00 | $30.00 | $18.88 |
| 630E79101 SIGN HANGER ASSEMBLY, MAST ARM, AS PER PLAN | 4 EACH | $425 | $450 | $390 | $525 | $500 | $502 |
| 630E79501 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, AS PER PLAN | 3 EACH | $250 | $240 | $120 | $295 | $250 | $295 |
| 630E80100 SIGN, FLAT SHEET | 16 SF | $30.00 | $20.20 | $20.00 | $21.50 | $60.00 | $35.40 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 20 SF | $35.00 | $37.35 | $32.00 | $32.80 | $65.00 | $41.30 |
| 630E80511 SIGN, STREET NAME, AS PER PLAN | 1 EACH | $350 | $490 | $350 | $265 | $800 | $413 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $30.00 | $95.00 | $30.00 | $20.00 | $60.00 | $35.40 |
| 630E87101 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION, A | 2 EACH | $750 | $770 | $1,000 | $1,450 | $2,000 | $885 |
| 630E89706 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 1 EACH | $2,500 | $1,345 | $1,700 | $1,725 | $1,775 | $5,428 |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 170 FT | $8.00 | $8.00 | $8.80 | $8.00 | $9.05 | $9.44 |
| 646E10400 STOP LINE | 62 FT | $12.00 | $12.00 | $14.40 | $12.00 | $51.00 | $14.16 |
| 646E10800 ISLAND MARKING | 46 SF | $10.00 | $10.00 | $11.00 | $10.00 | $30.50 | $11.80 |
| 646E50100 REMOVAL OF PAVEMENT MARKING | 136 FT | $8.00 | $8.00 | $8.80 | $8.00 | $10.00 | $9.44 |
| 611E00400 4" CONDUIT, TYPE E | 60 FT | $1.00 | $23.20 | $15.00 | $1.90 | $25.00 | $37.76 |
| 625E25408 CONDUIT, 2", 725.051 | 58 FT | $5.15 | $9.50 | $11.35 | $18.00 | $16.00 | $19.71 |
| 625E25504 CONDUIT, 3", 725.051 | 22 FT | $8.80 | $33.65 | $24.20 | $27.50 | $20.00 | $38.82 |
| 625E25604 CONDUIT, 4", 725.051 | 24 FT | $11.95 | $17.20 | $23.55 | $41.00 | $24.00 | $28.20 |
| 625E29000 TRENCH | 92 FT | $11.35 | $13.60 | $15.90 | $23.00 | $25.00 | $34.69 |
| 625E30700 PULL BOX, 725.08, 18" | 1 EACH | $930 | $1,850 | $1,020 | $1,100 | $1,300 | $1,540 |
| 625E30706 PULL BOX, 725.08, 24" | 2 EACH | $1,165 | $1,950 | $696 | $1,350 | $1,500 | $1,687 |
| 625E32000 GROUND ROD | 5 EACH | $375 | $300 | $382 | $275 | $425 | $366 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 92 FT | $1.65 | $1.50 | $0.85 | $3.00 | $2.75 | $13.10 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 1 EACH | $1,890 | $1,490 | $1,691 | $1,700 | $2,000 | $1,758 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 8 EACH | $70.00 | $10.00 | $37.00 | $70.00 | $65.00 | $18.88 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 632 FT | $2.20 | $2.45 | $2.70 | $3.00 | $4.25 | $6.04 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 712 FT | $2.45 | $2.85 | $3.40 | $3.20 | $5.00 | $6.56 |
| 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG | 39 FT | $6.65 | $42.00 | $6.10 | $7.00 | $7.00 | $6.73 |
| 633E67100 CABINET FOUNDATION | 1 EACH | $1,535 | $3,170 | $1,755 | $3,000 | $4,100 | $2,667 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 1 EACH | $910 | $1,250 | $585 | $600 | $2,800 | $1,274 |
| 809E64550 ETHERNET CABLE, OUTDOOR-RATED | 361 FT | $2.50 | $2.55 | $3.10 | $4.00 | $6.25 | $5.85 |
| 809E69201 EMERGENCY VEHICLE PREEMPTION, AS PER PLAN | 1 EACH | $910 | $350 | $1,225 | $500 | $700 | $1,569 |
| 809E69221 PREEMPT DETECTOR CABLE, AS PER PLAN | 652 FT | $1.80 | $2.05 | $2.45 | $2.00 | $3.25 | $5.03 |
| 614E11111 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 25 HOUR | $65.00 | $70.00 | $75.00 | $100 | $90.00 | $94.40 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,033 | $3,198 | $6,000 | $2,627 | $2,000 | $2,950 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 632E72151 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 14, AS PER P | 2 EACH | $26,815 | $54k | 19% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 3 EACH | $9,745 | $29k | 10% |
| 632E79151 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 1 EACH | $27,940 | $28k | 10% |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 3 EACH | $6,500 | $20k | 7% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 2 EACH | $9,395 | $19k | 7% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $18,695 | $19k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $10k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 3% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 7 EACH | $1,170 | $8k | 3% |
| 625E25909 CONDUIT, JACKED OR DRILLED, 725.052, AS PER PLAN, | 112 FT | $66.5 | $7k | 3% |