COS-VAR Signal Upgrades
COS County · est $0.6M
Bid dateThursday, August 24—
COS County · est $0.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 38 more items below.
| Item | Quantity | R1Greenwich Electric INC | R2Perram Electric INC | R3Complete General Construction Company | R4Shelly Company | R5Ruhlin Company | R6Miller Cable Company | % of bid |
|---|---|---|---|---|---|---|---|---|
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 16 EACH | $8,590 | $8,995 | $8,000 | $8,015 | $8,750 | $9,500 | 27% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN, POLE MOUNTED | 4 EACH | $14,520 | $14,520 | $15,000 | $14,755 | $15,495 | $15,500 | 11% |
| 625E27551 LUMINAIRE, DECORATIVE, AS PER PLAN, 100 WATT, LED, | 28 EACH | $1,520 | $1,500 |
| Item | Quantity | R1Greenwich Electric INC | R2Perram Electric INC | R3Complete General Construction Company | R4Shelly Company | R5Ruhlin Company | R6Miller Cable Company |
|---|---|---|---|---|---|---|---|
| 202E30000 WALK REMOVED | 197 SF | $9.00 | $15.00 | $6.00 | $6.20 | $8.00 | $30.00 |
| 512E74500 REMOVAL OF EXISTING PAVEMENT MARKING | 45 FT | $24.50 | $22.00 | $22.00 | $10.00 | $107 | $250 |
| 608E10000 4" CONCRETE WALK | 197 SF | $27.00 | $40.00 | $17.00 | $24.00 | $34.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1,475 |
| $1,680 |
| $1,600 |
| $1,900 |
| 8% |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 4 EACH | $8,362 | $8,450 | $8,350 | $8,475 | $9,465 | $9,200 | 7% |
| AA2 632E79141 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 1 EACH | $20,427 | $19,680 | $22,250 | $27,000 | $33,500 | $22,000 | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $19,400 | $9,730 | $6,000 | $8,000 | $2,500 | $6,822 | 4% |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 4 EACH | $4,765 | $4,510 | $5,200 | $4,745 | $5,400 | $5,500 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $18,500 | $20,000 | $20,000 | $15,000 | $20,000 | $20,000 | 4% |
| AA2 632E79131 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 1 EACH | $17,378 | $16,730 | $19,000 | $24,000 | $30,000 | $18,000 | 3% |
| 809E69210 PREEMPT RECEIVING UNIT | 4 EACH | $4,300 | $3,950 | $4,200 | $4,295 | $4,263 | $4,600 | 3% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 2 EACH | $8,400 | $7,575 | $7,000 | $8,845 | $12,795 | $13,500 | 3% |
| 625E17901 BRACKET ARM, AS PER PLAN, DECORATIVE, 2.5' | 18 EACH | $904 | $775 | $1,000 | $870 | $1,043 | $800 | 3% |
| 809E69230 PREEMPT PHASE SELECTOR | 4 EACH | $3,566 | $3,740 | $3,950 | $3,925 | $4,103 | $4,200 | 3% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 20 EACH | $700 | $760 | $800 | $785 | $1,050 | $1,100 | 3% |
| 625E25908 CONDUIT, JACKED OR DRILLED, 725.052, 4" | 247 FT | $53.00 | $57.15 | $75.00 | $46.00 | $65.00 | $58.00 | 3% |
| 632E20730 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN | 24 EACH | $538 | $525 | $725 | $655 | $650 | $750 | 3% |
| 809E69240 PREEMPT CONFIRMATION LIGHT | 16 EACH | $644 | $940 | $900 | $565 | $503 | $700 | 2% |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 3,249 FT | $2.65 | $3.30 | $3.00 | $5.25 | $2.60 | $3.60 | 2% |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 3,614 FT | $2.35 | $2.60 | $2.50 | $4.25 | $2.20 | $3.30 | 2% |
| 625E23304 NO. 8 AWG 600 VOLT DISTRIBUTION CABLE | 4,333 FT | $1.75 | $2.05 | $2.00 | $2.65 | $2.00 | $3.00 | 1% |
| $55.00 |
| 625E00450 CONNECTION, FUSED PULL APART | 18 EACH | $112 | $185 | $140 | $202 | $148 | $140 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 9 EACH | $105 | $185 | $125 | $138 | $148 | $120 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 4,485 FT | $1.35 | $0.85 | $1.75 | $0.95 | $1.70 | $2.00 |
| 625E25410 CONDUIT, 2", 725.052 | 17 FT | $15.00 | $24.40 | $20.00 | $37.00 | $15.00 | $33.00 |
| 625E25606 CONDUIT, 4", 725.052 | 33 FT | $24.00 | $32.05 | $34.00 | $32.00 | $35.00 | $53.00 |
| 625E25910 CONDUIT CLEANED AND CABLES REMOVED | 777 FT | $1.35 | $3.60 | $1.00 | $3.50 | $0.40 | $1.00 |
| 625E29002 TRENCH, 24" DEEP | 43 FT | $16.00 | $28.30 | $18.00 | $20.50 | $15.00 | $44.00 |
| 625E30706 PULL BOX, 725.08, 24" | 4 EACH | $1,300 | $2,000 | $1,500 | $1,140 | $1,200 | $1,375 |
| 625E32000 GROUND ROD | 5 EACH | $310 | $285 | $325 | $215 | $325 | $305 |
| 625E98200 LIGHTING, MISC.:RECONNECT EXISTING LIGHTING | 1 LS | $1,500 | $1,000 | $5,000 | $5,800 | $1,300 | $4,400 |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 3 EACH | $250 | $225 | $1,320 | $850 | $150 | $600 |
| 630E80100 SIGN, FLAT SHEET | 6 SF | $28.00 | $100 | $125 | $30.00 | $40.00 | $55.00 |
| 631E94250 REMOVAL OF LUMINAIRE | 10 EACH | $50.00 | $175 | $50.00 | $280 | $52.00 | $55.00 |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 8 EACH | $845 | $865 | $900 | $900 | $950 | $1,375 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 4 EACH | $1,260 | $1,325 | $1,375 | $1,385 | $1,289 | $1,900 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 8 EACH | $30.00 | $20.00 | $40.00 | $30.00 | $35.00 | $70.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 8 EACH | $15.00 | $20.00 | $35.00 | $25.00 | $35.00 | $50.00 |
| 632E26001 PEDESTRIAN PUSHBUTTON, AS PER PLAN | 20 EACH | $234 | $290 | $300 | $280 | $250 | $250 |
| 632E40300 SIGNAL CABLE, 3 CONDUCTOR, NO. 14 AWG | 3,099 FT | $2.05 | $2.20 | $2.00 | $4.45 | $2.00 | $3.00 |
| 632E64020 PEDESTAL FOUNDATION | 3 EACH | $900 | $1,155 | $1,200 | $1,080 | $990 | $1,350 |
| 632E66000 POWER CABLE, 3 CONDUCTOR, NO. 14 AWG | 202 FT | $7.35 | $3.50 | $4.00 | $5.20 | $5.00 | $7.00 |
| 632E70000 POWER SERVICE | 1 EACH | $2,700 | $3,075 | $3,100 | $7,635 | $4,175 | $2,700 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM, CABI | 3 EACH | $200 | $350 | $700 | $220 | $205 | $550 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM, CONT | 3 EACH | $50.00 | $90.00 | $150 | $55.00 | $200 | $120 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM, VEHI | 24 EACH | $45.00 | $90.00 | $340 | $145 | $75.00 | $120 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $2,500 | $1,400 | $3,000 | $5,700 | $1,700 | $2,800 |
| 633E45000 GPS (GLOBAL POSITIONING SYSTEM) CLOCK ASSEMBLY | 3 EACH | $495 | $620 | $825 | $565 | $647 | $800 |
| 633E67200 CONTROLLER WORK PAD | 4 EACH | $350 | $275 | $1,900 | $295 | $300 | $400 |
| 644E00500 STOP LINE | 21 FT | $16.00 | $14.50 | $14.50 | $50.00 | $208 | $20.00 |
| 809E69200 EMERGENCY VEHICLE PREEMPTION | 1 EACH | $1,334 | $1,860 | $2,000 | $4,220 | $1,740 | $1,650 |
| 809E69220 PREEMPT DETECTOR CABLE | 600 FT | $4.00 | $4.50 | $4.75 | $4.40 | $3.20 | $5.00 |
| AA2 632E89601 PEDESTAL, 8', AS PER PLAN, (DECORATIVE) (ALTERNATE | 3 EACH | $2,055 | $2,355 | $2,000 | $2,500 | $3,200 | $2,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,500 | $18,150 | $10,000 | $18,000 | $17,900 | $26,000 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $70.00 | $65.00 | $95.00 | $100 | $110 | $100 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,200 | $2,000 | $2,000 | $1,750 | $1,540 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 16 EACH | $8,590 | $137k | 23% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN, POLE MOUNTED | 4 EACH | $14,520 | $58k | 10% |
| 625E27551 LUMINAIRE, DECORATIVE, AS PER PLAN, 100 WATT, LED, | 28 EACH | $1,520 | $43k | 7% |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 4 EACH | $8,362 | $33k | 6% |
| AA2 632E79141 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 1 EACH | $20,427 | $20k | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $19,400 | $19k | 3% |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 4 EACH | $4,765 | $19k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $18,500 | $19k | 3% |
| AA2 632E79131 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 1 EACH | $17,378 | $17k | 3% |
| 809E69210 PREEMPT RECEIVING UNIT | 4 EACH | $4,300 | $17k | 3% |