WOO-SR 795-03.26 Intrsect Upgrade
WOO County · est $0.3M
Bid dateThursday, September 14—
WOO County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 25 more items below.
| Item | Quantity | R1Miller Cable Company | R2Perram Electric INC | R3U S Utility Contractor Company | R4Fet Construction Services LLC | % of bid |
|---|---|---|---|---|---|---|
| 632E72150 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 14 | 2 EACH | $21,500 | $20,585 | $22,931 | $21,666 | 13% |
| 632E72140 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 13 | 2 EACH | $21,000 | $20,130 | $22,701 | $21,452 | 13% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $9,900 | $9,320 | $9,523 | $10,415 | 12% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $9,700 | $8,715 | $9,178 | $10,095 | 12% |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 4 EACH | $8,900 | $15,015 | $4,610 | $18,304 | 11% |
| 625E25906 CONDUIT, JACKED OR DRILLED, 725.051, 4" | 427 FT | $55.00 | $48.80 | $32.00 |
| Item | Quantity | R1Miller Cable Company | R2Perram Electric INC | R3U S Utility Contractor Company | R4Fet Construction Services LLC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $100 | $250 | $1,050 | $634 |
| 202E38000 GUARDRAIL REMOVED | 166 FT | $2.00 | $2.00 | $2.10 | $2.15 |
| 659E00300 TOPSOIL | 10 CY | $70.00 | $88.05 | $105 | $21.35 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 100 SY | $18.00 | $5.85 | $19.53 | $20.00 |
| 659E20000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $38.20 |
| 7% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $16,000 | $14,585 | $18,489 | $15,417 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $11,600 | $4,600 | $16,800 | $10,657 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10,000 | $15,750 | $3,621 | 3% |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 3 EACH | $3,000 | $2,800 | $2,935 | $2,979 | 3% |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $8,550 | $8,125 | $7,671 | $7,852 | 3% |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 8 EACH | $900 | $910 | $1,059 | $890 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 166 FT | $35.00 | $33.00 | $34.65 | $35.20 | 2% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 1,342 FT | $3.30 | $2.80 | $3.83 | $4.00 | 1% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 10 SY | $420 | $150 | $420 | $427 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,200 | $2,000 | $4,200 | $1,609 | 1% |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $4,000 | $7,545 | $9,950 | $11,311 | 1% |
| 633E67100 CABINET FOUNDATION | 1 EACH | $3,200 | $3,335 | $1,415 | $1,085 | 1% |
| 625E30700 PULL BOX, 725.08, 18" | 3 EACH | $1,050 | $1,985 | $995 | $1,156 | 1% |
| 0.1 TON |
| $300 |
| $1,500 |
| $672 |
| $682 |
| 659E35000 WATER | 1 MGAL | $1.00 | $50.00 | $1.05 | $1.10 |
| 611E00400 4" CONDUIT, TYPE E | 80 FT | $1.60 | $11.70 | $6.30 | $14.50 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 14 FT | $17.00 | $18.70 | $26.25 | $16.00 |
| 630E79200 SIGN ATTACHMENT ASSEMBLY, MAST ARM | 2 EACH | $500 | $340 | $499 | $426 |
| 630E80100 SIGN, FLAT SHEET | 20 SF | $35.00 | $42.05 | $33.60 | $34.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $55.00 | $195 | $21.00 | $21.50 |
| 625E25604 CONDUIT, 4", 725.051 | 31 FT | $28.00 | $30.50 | $11.00 | $13.80 |
| 625E29000 TRENCH | 31 FT | $25.00 | $28.75 | $6.88 | $5.90 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $1,300 | $2,115 | $1,105 | $1,310 |
| 625E31510 PULL BOX REMOVED | 9 EACH | $100 | $108 | $488 | $566 |
| 625E32000 GROUND ROD | 5 EACH | $305 | $305 | $429 | $404 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 36 FT | $4.00 | $1.30 | $2.20 | $2.00 |
| 632E05086 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 2 EACH | $1,500 | $1,575 | $1,720 | $1,500 |
| 632E67200 POWER CABLE, 2 CONDUCTOR, NO. 8 AWG | 10 FT | $4.00 | $20.95 | $3.25 | $2.10 |
| 632E69400 SERVICE CABLE, 2 CONDUCTOR, NO. 8 AWG | 45 FT | $4.00 | $10.35 | $3.25 | $2.10 |
| 632E70000 POWER SERVICE | 1 EACH | $2,600 | $3,310 | $5,500 | $3,417 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $1,000 | $295 | $1,205 | $760 |
| 809E69123 ATC V6.24 CONTROLLER, AS PER PLAN | 1 EACH | $800 | $395 | $1,990 | $1,118 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 12 HOUR | $85.00 | $70.00 | $105 | $64.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,140 | $5,619 | $12,600 | $7,480 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 632E72150 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 14 | 2 EACH | $21,500 | $43k | 13% |
| 632E72140 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 13 | 2 EACH | $21,000 | $42k | 12% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $9,900 | $40k | 12% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $9,700 | $39k | 11% |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 4 EACH | $8,900 | $36k | 10% |
| 625E25906 CONDUIT, JACKED OR DRILLED, 725.051, 4" | 427 FT | $55 | $23k | 7% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $16,000 | $16k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $11,600 | $12k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 3% |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 3 EACH | $3,000 | $9k | 3% |