HAN-US 68-Arlington Signals
HAN County · est $0.2M
Bid dateThursday, December 14—
HAN County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 42 more items below.
| Item | Quantity | R1Perram Electric INC | R2Miller Cable Company | R3U S Utility Contractor Company | % of bid |
|---|---|---|---|---|---|
| 632E86140 STRAIN POLE, TYPE TC-81.11, DESIGN 12, BLACK | 2 EACH | $12,175 | $14,100 | $14,133 | 13% |
| 630E97700 SIGNING, MISC.:SOLAR-POWERED RECTANGULAR RAPID FLA | 2 EACH | $10,570 | $8,775 | $9,050 | 11% |
| 632E64000 STRAIN POLE FOUNDATION | 2 EACH | $9,330 | $8,400 | $3,580 | 10% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 2 EACH | $9,135 | $9,700 | $9,218 | 10% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $15,965 | $18,300 | $18,983 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $12,750 | $7,000 | $9,625 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 |
| Item | Quantity | R1Perram Electric INC | R2Miller Cable Company | R3U S Utility Contractor Company |
|---|---|---|---|---|
| 202E30000 WALK REMOVED | 40 SF | $20.00 | $16.00 | $15.75 |
| 202E32500 CURB AND GUTTER REMOVED | 20 FT | $40.00 | $16.00 | $15.75 |
| 304E20000 AGGREGATE BASE | 2 CY | $250 | $90.00 | $89.25 |
| 608E10000 4" CONCRETE WALK | 20 SF | $100 | $90.00 | $89.25 |
| 608E52000 CURB RAMP | 20 SF | $100 | $90.00 | $89.25 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $10,000 |
| $8,038 |
| 5% |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 2 EACH | $3,940 | $2,200 | $5,025 | 4% |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 8 EACH | $970 | $1,500 | $1,159 | 4% |
| 625E25908 CONDUIT, JACKED OR DRILLED, 725.052, 3" | 115 FT | $65.15 | $70.00 | $36.55 | 4% |
| 625E30706 PULL BOX, 725.08, 24" | 3 EACH | $2,125 | $1,400 | $1,183 | 3% |
| 632E20750 ACCESSIBLE PEDESTRIAN PUSHBUTTON | 8 EACH | $780 | $850 | $893 | 3% |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 1 EACH | $4,950 | $6,300 | $6,573 | 3% |
| 809E69231 PREEMPT PHASE SELECTOR, AS PER PLAN | 1 EACH | $4,195 | $5,000 | $3,262 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,122 | $1,000 | $5,750 | 2% |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 8 EACH | $505 | $725 | $575 | 2% |
| 632E64020 PEDESTAL FOUNDATION | 2 EACH | $1,880 | $1,300 | $1,010 | 2% |
| 809E69211 PREEMPT RECEIVING UNIT, AS PER PLAN | 4 EACH | $885 | $1,200 | $990 | 2% |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 1,122 FT | $3.00 | $3.25 | $4.50 | 2% |
| 633E67100 CABINET FOUNDATION | 1 EACH | $3,220 | $3,150 | $1,235 | 2% |
| 20 FT |
| $100 |
| $155 |
| $158 |
| 690E50000 SPECIAL - MAILBOX SUPPORT | 1 EACH | $890 | $400 | $565 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 1 EACH | $215 | $500 | $738 |
| 659E00300 TOPSOIL | 4 CY | $60.00 | $100 | $105 |
| 659E10000 SEEDING AND MULCHING | 35 SY | $2.85 | $8.00 | $8.40 |
| 659E20000 COMMERCIAL FERTILIZER | 0.01 TON | $5,000 | $1,550 | $1,575 |
| 659E35000 WATER | 1 MGAL | $10.00 | $50.00 | $52.50 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 48 FT | $20.40 | $21.00 | $15.75 |
| 630E08600 SIGN POST REFLECTOR | 4 EACH | $115 | $47.25 | $52.50 |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 2 EACH | $235 | $483 | $315 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 6 EACH | $120 | $246 | $184 |
| 630E80100 SIGN, FLAT SHEET | 60 SF | $25.40 | $25.73 | $36.75 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 11 EACH | $17.90 | $15.75 | $21.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 6 EACH | $65.65 | $20.00 | $21.00 |
| 642E00500 STOP LINE, TYPE 1 | 57 FT | $5.00 | $5.20 | $5.25 |
| 642E00620 CROSSWALK LINE, 12", TYPE 1 | 453 FT | $3.00 | $3.20 | $3.15 |
| 642E01110 SCHOOL SYMBOL MARKING, 96", TYPE 1 | 2 EACH | $350 | $368 | $158 |
| 642E20802 YIELD LINE, TYPE 1 | 30 FT | $5.00 | $5.25 | $5.25 |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 90 FT | $10.00 | $10.50 | $47.25 |
| 625E25500 CONDUIT, 3", 725.04 | 13 FT | $55.90 | $65.00 | $26.75 |
| 625E25600 CONDUIT, 4", 725.04 | 11 FT | $88.90 | $90.00 | $34.00 |
| 625E29002 TRENCH, 24" DEEP | 24 FT | $16.40 | $60.00 | $8.33 |
| 625E32000 GROUND ROD | 4 EACH | $320 | $275 | $450 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 8 EACH | $10.00 | $40.00 | $33.50 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 8 EACH | $5.00 | $30.00 | $28.00 |
| 632E30200 MESSENGER WIRE, 7 STRAND, 3/8" DIAMETER WITH ACCES | 67 FT | $16.70 | $26.00 | $12.15 |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 67 FT | $17.75 | $26.50 | $13.30 |
| 632E66104 POWER CABLE, 3 CONDUCTOR, NO. 10 AWG | 47 FT | $6.85 | $4.00 | $3.35 |
| 632E69700 SERVICE CABLE, 3 CONDUCTOR, NO. 8 AWG | 55 FT | $6.20 | $6.00 | $3.18 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $2,040 | $1,400 | $4,500 |
| 632E89900 PEDESTAL, 8', TRANSFORMER BASE, BLACK | 2 EACH | $1,120 | $1,000 | $1,270 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $495 | $500 | $670 |
| 809E69201 EMERGENCY VEHICLE PREEMPTION, AS PER PLAN | 1 EACH | $500 | $700 | $10,520 |
| 809E69221 PREEMPT DETECTOR CABLE, AS PER PLAN | 164 FT | $3.95 | $4.00 | $5.65 |
| 809E69241 PREEMPT CONFIRMATION LIGHT, AS PER PLAN | 4 EACH | $550 | $650 | $774 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,000 | $1,900 | $2,320 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 632E86140 STRAIN POLE, TYPE TC-81.11, DESIGN 12, BLACK | 2 EACH | $12,175 | $24k | 11% |
| 630E97700 SIGNING, MISC.:SOLAR-POWERED RECTANGULAR RAPID FLA | 2 EACH | $10,570 | $21k | 10% |
| 632E64000 STRAIN POLE FOUNDATION | 2 EACH | $9,330 | $19k | 8% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 2 EACH | $9,135 | $18k | 8% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $15,965 | $16k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $12,750 | $13k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 4% |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 2 EACH | $3,940 | $8k | 4% |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 8 EACH | $970 | $8k | 3% |
| 625E25908 CONDUIT, JACKED OR DRILLED, 725.052, 3" | 115 FT | $65.15 | $7k | 3% |