ATH-US 50-04.75
ATH County · est $0.5M
Bid dateThursday, February 8—
ATH County · est $0.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 67 more items below.
| Item | Quantity | R1Axis Civil Construction LLC | R2Complete General Construction Company | R3Perram Electric INC | % of bid |
|---|---|---|---|---|---|
| 632E86150 STRAIN POLE, TYPE TC-81.11, DESIGN 13 | 4 EACH | $11,250 | $20,000 | $24,510 | 11% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $31,000 | $20,000 | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,000 | $39,000 | $50,300 | 8% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 98 CY | $350 | $325 | $320 | 8% |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 89 CY | $380 | $425 | $350 | 8% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $8,150 | $9,000 | $12,595 | 8% |
| 632E64000 STRAIN POLE FOUNDATION | 4 EACH | $6,250 |
| Item | Quantity | R1Axis Civil Construction LLC | R2Complete General Construction Company | R3Perram Electric INC |
|---|---|---|---|---|
| 203E20000 EMBANKMENT | 36 CY | $35.00 | $25.00 | $36.00 |
| 204E10000 SUBGRADE COMPACTION | 586 SY | $2.50 | $5.00 | $2.50 |
| 659E10000 SEEDING AND MULCHING | 544 SY | $2.80 | $10.00 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.05 TON | $700 | $1,400 | $2,000 |
| 659E31000 LIME | 0.12 ACRE | $250 | $150 | $835 |
| 659E35000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $10,500 |
| $9,475 |
| 6% |
| 203E10000 EXCAVATION | 593 CY | $35.00 | $40.00 | $31.50 | 5% |
| 633E65523 CABINET, TYPE 332L, AS PER PLAN | 1 EACH | $16,900 | $18,000 | $19,795 | 4% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 2 EACH | $7,500 | $9,500 | $12,945 | 4% |
| 304E20000 AGGREGATE BASE | 135 CY | $110 | $100 | $120 | 4% |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 514 FT | $28.00 | $20.00 | $20.70 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 420 FT | $32.00 | $35.00 | $28.00 | 3% |
| 442E22400 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 37 CY | $340 | $525 | $290 | 3% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, V | 1,193 SY | $10.00 | $15.00 | $9.00 | 3% |
| 632E30400 MESSENGER WIRE, 7 STRAND, 1/2" DIAMETER WITH ACCES | 514 FT | $22.00 | $20.00 | $22.60 | 3% |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 11 EACH | $960 | $1,100 | $1,245 | 3% |
| 253E02000 PAVEMENT REPAIR | 10 CY | $1,000 | $1,000 | $720 | 2% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $10,000 | $2,000 | $3,000 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $5,000 | $10,000 | 2% |
| 3 MGAL |
| $1.00 |
| $104 |
| $16.65 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.50" | 291 SY | $10.00 | $15.00 | $8.00 |
| 407E20000 NON-TRACKING TACK COAT | 181 GAL | $6.00 | $3.30 | $6.00 |
| 621E00100 RPM | 7 EACH | $295 | $480 | $725 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 7 EACH | $35.00 | $25.00 | $35.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 2 EACH | $200 | $735 | $142 |
| 630E80100 SIGN, FLAT SHEET | 30 SF | $30.00 | $19.00 | $24.20 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 2 EACH | $1,000 | $1,430 | $1,165 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $25.00 | $10.00 | $45.65 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $125 | $65.00 | $365 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $25.00 | $15.00 | $91.25 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 2 EACH | $250 | $135 | $275 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 2 EACH | $500 | $220 | $550 |
| 644E00104 EDGE LINE, 6" | 0.1 MILE | $8,500 | $21,000 | $8,500 |
| 644E00204 LANE LINE, 6" | 0.04 MILE | $4,860 | $21,000 | $4,850 |
| 644E00300 CENTER LINE | 0.05 MILE | $15,150 | $21,000 | $15,160 |
| 644E00404 CHANNELIZING LINE, 12" | 296 FT | $3.00 | $2.00 | $3.00 |
| 644E00500 STOP LINE | 125 FT | $8.80 | $9.00 | $8.80 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 197 FT | $8.80 | $7.00 | $8.80 |
| 644E00720 CHEVRON MARKING | 105 FT | $8.85 | $9.00 | $8.85 |
| 644E01300 LANE ARROW | 6 EACH | $110 | $110 | $110 |
| 644E01510 DOTTED LINE, 6" | 66 FT | $3.00 | $1.00 | $3.00 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 90 FT | $9.80 | $10.00 | $9.80 |
| 644E30030 REMOVAL OF PAVEMENT MARKING | 0.11 MILE | $9.82 | $31,200 | $3,000 |
| 831E00101 LONGITUDINAL CHANNELIZING DEVICE, AS PER PLAN | 50 FT | $50.00 | $145 | $100 |
| 831E00500 REMOVAL OF LONGITUDINAL CHANNELIZING DEVICE | 110 FT | $10.00 | $4.50 | $10.00 |
| 625E25400 CONDUIT, 2", 725.04 | 150 FT | $26.00 | $30.00 | $32.60 |
| 625E25600 CONDUIT, 4", 725.04 | 60 FT | $58.00 | $75.00 | $81.70 |
| 625E29000 TRENCH | 190 FT | $16.00 | $20.00 | $18.85 |
| 625E30706 PULL BOX, 725.08, 24" | 2 EACH | $1,975 | $1,200 | $1,925 |
| 625E31510 PULL BOX REMOVED | 9 EACH | $480 | $500 | $265 |
| 625E32000 GROUND ROD | 5 EACH | $500 | $350 | $445 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 200 FT | $1.30 | $3.00 | $1.45 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL, CONTROLLER CABIN | 1 EACH | $3,300 | $2,600 | $4,365 |
| 632E05086 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 2 EACH | $1,740 | $2,000 | $2,165 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 13 EACH | $120 | $70.00 | $29.10 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 603 FT | $3.30 | $3.50 | $4.85 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 1,463 FT | $4.20 | $4.00 | $5.35 |
| 632E69200 POWER CABLE, 2 CONDUCTOR, NO. 4 AWG | 29 FT | $6.80 | $8.00 | $8.10 |
| 632E69900 SERVICE CABLE, 3 CONDUCTOR, NO. 4 AWG | 149 FT | $10.20 | $15.00 | $10.60 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $6,000 | $5,000 | $10,205 |
| 632E90102 REMOVAL OF TRAFFIC SIGNAL INSTALLATION FOR STORAGE | 1 EACH | $4,800 | $8,000 | $7,965 |
| 633E67100 CABINET FOUNDATION | 1 EACH | $5,300 | $5,000 | $3,770 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $660 | $3,000 | $1,500 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $8,000 | $7,500 | $10,220 |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 1 EACH | $9,300 | $7,500 | $9,340 |
| 900E11000 SPECIAL - REMOVAL OF "PREPARE TO STOP WHEN FLASHIN | 1 EACH | $7,150 | $3,000 | $5,311 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $65.00 | $90.00 | $75.00 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $3,500 | $4,000 | $2,500 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, 1-WAY | 10 EACH | $22.00 | $50.00 | $19.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 10 EACH | $32.00 | $50.00 | $31.00 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.05 MILE | $14,250 | $9,000 | $14,240 |
| 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT | 0.3 MILE | $9,018 | $15,600 | $1,000 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.1 MILE | $7,750 | $9,000 | $7,750 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.06 MILE | $11,750 | $7,000 | $11,750 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.24 MILE | $3,250 | $7,000 | $3,250 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 480 FT | $1.05 | $1.50 | $1.05 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 360 FT | $6.00 | $7.00 | $6.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 6 EACH | $250 | $80.00 | $250 |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 15 SY | $400 | $500 | $300 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,500 | $6,500 | $12,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 632E86150 STRAIN POLE, TYPE TC-81.11, DESIGN 13 | 4 EACH | $11,250 | $45k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,000 | $35k | 6% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 98 CY | $350 | $34k | 6% |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 89 CY | $380 | $34k | 6% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $8,150 | $33k | 6% |
| 632E64000 STRAIN POLE FOUNDATION | 4 EACH | $6,250 | $25k | 4% |
| 203E10000 EXCAVATION | 593 CY | $35 | $21k | 4% |
| 633E65523 CABINET, TYPE 332L, AS PER PLAN | 1 EACH | $16,900 | $17k | 3% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 2 EACH | $7,500 | $15k | 3% |