ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 42 more items below.
| Item | Quantity | R1Cornerstone Electric INC | R2Ruhlin Company | R3Miller Cable Company | R4Perram Electric INC | R5Bruce & Merrilees Electric CO INC | % of bid |
|---|---|---|---|---|---|---|---|
| 625E11200 LIGHT TOWER, BB100 | 13 EACH | $23,500 | $22,390 | $24,750 | $24,390 | $29,179 | 25% |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 17,239 FT | $8.75 | $11.80 | $11.50 | $10.85 | $12.22 | 12% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 2,382 FT | $59.00 | $52.00 | $49.00 | $67.40 | $95.88 | 11% |
| 625E29000 TRENCH | 16,589 FT | $7.00 | $7.00 | $8.00 | $10.10 | $8.48 | 9% |
| 625E15200 LIGHT TOWER FOUNDATION, 36" X 25' DEEP | 10 EACH | $11,000 | $6,730 | $9,700 | $20,335 | $15,148 | 9% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT10B35 |
| Item | Quantity | R1Cornerstone Electric INC | R2Ruhlin Company | R3Miller Cable Company | R4Perram Electric INC | R5Bruce & Merrilees Electric CO INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $2,000 | $2,100 | $200 | $10,587 |
| 202E38201 GUARDRAIL REMOVED FOR REUSE, AS PER PLAN | 125 FT | $5.00 | $39.00 | $50.00 | $11.70 | $42.44 |
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS | 1 LS | $1,000 | $1,700 | $2,500 | $4,640 | $1.22 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION | 1 LS |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 25 EACH |
| $2,800 |
| $2,494 |
| $3,100 |
| $2,830 |
| $3,186 |
| 6% |
| 625E30706 PULL BOX, 725.08, 24" | 52 EACH | $1,200 | $1,097 | $1,100 | $1,840 | $1,465 | 5% |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 25 EACH | $1,500 | $1,196 | $1,600 | $2,550 | $2,451 | 3% |
| 625E15100 LIGHT TOWER FOUNDATION, 36" X 20' DEEP | 3 EACH | $10,000 | $5,569 | $8,300 | $16,950 | $13,108 | 2% |
| 625E34001 POWER SERVICE, AS PER PLAN | 3 EACH | $10,000 | $10,100 | $9,650 | $9,905 | $8,015 | 2% |
| 630E73320 COMBINATION OVERHEAD SIGN SUPPORT, TYPE TC-12.31, | 1 EACH | $27,000 | $27,427 | $31,000 | $21,790 | $28,580 | 2% |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 7,926 FT | $2.75 | $3.40 | $3.00 | $3.60 | $4.20 | 2% |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 165 EACH | $125 | $110 | $135 | $167 | $70.27 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $36,899 | $33,000 | $64,000 | $58,626 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $74,000 | $40,000 | $100,000 | $29,185 | 2% |
| 625E26262 LUMINAIRE, HIGH MAST, SOLID STATE (LED) (40000-450 | 16 EACH | $1,200 | $1,230 | $1,150 | $1,280 | $1,418 | 2% |
| 625E75400 LIGHT POLE REMOVED | 71 EACH | $200 | $210 | $250 | $550 | $686 | 1% |
| 659E10000 SEEDING AND MULCHING | 4,537 SY | $3.00 | $2.50 | $3.00 | $3.50 | $2.95 | 1% |
| 625E26262 LUMINAIRE, HIGH MAST, SOLID STATE (LED) (40000-450 | 10 EACH | $1,200 | $1,230 | $1,150 | $1,280 | $1,418 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,000 | $7,136 | $12,234 | $30,041 | $14,616 | 1% |
| $1,000 |
| $1,300 |
| $6,000 |
| $5,200 |
| $5,980 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 94 SY | $90.00 | $95.00 | $20.00 | $456 | $233 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $150 | $125 | $85.00 | $100 | $599 |
| 659E00300 TOPSOIL | 504 CY | $20.00 | $90.00 | $60.00 | $30.00 | $155 |
| 659E14000 REPAIR SEEDING AND MULCHING | 227 SY | $3.00 | $3.80 | $2.00 | $2.00 | $1.65 |
| 659E15000 INTER-SEEDING | 227 SY | $1.00 | $3.80 | $0.10 | $2.00 | $0.15 |
| 659E20000 COMMERCIAL FERTILIZER | 0.63 TON | $750 | $950 | $650 | $600 | $675 |
| 659E31000 LIME | 0.94 ACRE | $200 | $154 | $50.00 | $200 | $50.00 |
| 659E35000 WATER | 25 MGAL | $1.00 | $1.00 | $1.00 | $5.00 | $1.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E00200 4" CONDUIT, TYPE C | 520 FT | $5.00 | $8.00 | $3.00 | $4.95 | $16.85 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 52 EACH | $220 | $275 | $550 | $234 | $620 |
| 625E00450 CONNECTION, FUSED PULL APART | 78 EACH | $125 | $215 | $135 | $167 | $136 |
| 625E18000 BRACKET ARM, 10' | 1 EACH | $1,000 | $900 | $650 | $680 | $873 |
| 625E18600 BRACKET ARM, MISC.: REMOVAL | 1 EACH | $100 | $250 | $100 | $185 | $287 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 3,510 FT | $1.50 | $1.60 | $2.00 | $1.23 | $1.76 |
| 625E25910 CONDUIT CLEANED AND CABLES REMOVED | 200 FT | $1.00 | $0.50 | $0.60 | $5.50 | $4.45 |
| 625E26252 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), 115-13 | 26 EACH | $375 | $343 | $350 | $425 | $459 |
| 625E28000 GLARE SHIELD | 4 EACH | $100 | $125 | $200 | $175 | $95.71 |
| 625E32000 GROUND ROD | 39 EACH | $275 | $300 | $250 | $315 | $245 |
| 625E36011 UNDERGROUND WARNING/MARKING TAPE, AS PER PLAN | 16,589 FT | $0.25 | $0.65 | $2.70 | $1.50 | $0.14 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $5,000 | $2,150 | $3,600 | $1,965 | $18,788 |
| 625E40010 SPECIAL - REPLACEMENT OF EXISTING LIGHTING UNIT | 2 EACH | $250 | $350 | $400 | $3,415 | $5,168 |
| 625E75401 LIGHT POLE REMOVED, AS PER PLAN | 1 EACH | $200 | $275 | $350 | $750 | $1,301 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 71 EACH | $150 | $225 | $200 | $550 | $341 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (PARKMAN, PERKINS | 3 EACH | $500 | $1,000 | $3,600 | $3,450 | $890 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 1 EACH | $7,000 | $7,886 | $9,000 | $7,545 | $7,743 |
| 630E87100 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION | 2 EACH | $1,500 | $650 | $800 | $930 | $1,686 |
| 630E89706 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 1 EACH | $1,200 | $635 | $1,500 | $1,100 | $3,844 |
| 631E94250 REMOVAL OF LUMINAIRE | 1 EACH | $100 | $107 | $100 | $91.50 | $287 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 50 HOUR | $72.00 | $105 | $90.00 | $75.00 | $150 |
| 614E11630 INCREASED BARRIER DELINEATION | 250 FT | $2.00 | $2.63 | $2.70 | $20.80 | $5.99 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,500 | $2,327 | $3,000 | $7,580 | $2,644 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE-WAY) | 15 EACH | $10.00 | $16.61 | $18.00 | $105 | $12.99 |
| 614E13350 OBJECT MARKER, ONE WAY | 15 EACH | $10.00 | $22.66 | $24.00 | $110 | $25.99 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $750 | $750 | $900 | $1,350 | $3,480 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 500 FT | $5.00 | $51.00 | $95.00 | $32.00 | $91.20 |
| 619E16010 FIELD OFFICE, TYPE B | 12 MNTH | $750 | $2,997 | $975 | $1,000 | $5,534 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $9,000 | $11,000 | $21,000 | $5,200 | $3,559 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 625E11200 LIGHT TOWER, BB100 | 13 EACH | $23,500 | $306k | 22% |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 17,239 FT | $8.75 | $151k | 11% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 2,382 FT | $59 | $141k | 10% |
| 625E29000 TRENCH | 16,589 FT | $7 | $116k | 8% |
| 625E15200 LIGHT TOWER FOUNDATION, 36" X 25' DEEP | 10 EACH | $11,000 | $110k | 8% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT10B35 | 25 EACH | $2,800 | $70k | 5% |
| 625E30706 PULL BOX, 725.08, 24" | 52 EACH | $1,200 | $62k | 5% |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 25 EACH | $1,500 | $38k | 3% |
| 625E15100 LIGHT TOWER FOUNDATION, 36" X 20' DEEP | 3 EACH | $10,000 | $30k | 2% |
| 625E34001 POWER SERVICE, AS PER PLAN | 3 EACH | $10,000 | $30k | 2% |